Requirement Analysis of the System Form for the Bridge Slab (교량 상판(바닥판) 콘크리트 타설용 시스템 거푸집 개발을 위한 요구조건 분석)

  • Kim, Taekoo;Lim, Jeeyoung;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.195-196
    • /
    • 2014
  • Unlike general construction works, bridge construction is mostly done in a high place. The conventional deck form of bridge is installed between precast concrete girders using sleepers, bridging joints and plywoods, and after concrete is poured to the deck, the form materials are removed at high altitudes. When removing the form, it may be dropped on ground, damaging the materials and resulting in economic loss. In addition, safety accidents are likely as the works are performed in a high place, and as the manpower increases, the cost increases. Also, it is difficult to install and remove temporary equipment. Therefore, it is required to develop a system form that allows easier and quicker installation and removal by unskilled workers and ensures safety of workers. In this regard, the study is intended to analyze requirements for the system form for pouring concrete to bridge decks, which can be easily installed and removed. The study result will be used as basic information for development of the system form for pouring concrete to bridge decks.

  • PDF

Structural Performance and Usability of Void Slab Established in T-deck Plate (T형 데크 플레이트 중공형 슬래브의 구조성능 및 사용성능)

  • Hong, Eun-Ae;Chung, Lan;Paik, In-Kwan;Yun, Sung-Ho;Cho, Seung-Ho
    • Journal of the Korea Concrete Institute
    • /
    • v.24 no.6
    • /
    • pp.677-684
    • /
    • 2012
  • In recent years, extension of life span of buildings is becoming an important issue in our society. To improve the life span of buildings, rhamen structure construction and long-spanned structures are advantageous. And in order to achieve this goal, structural elements of buildings must be light and slender. As an alternative method, general porous slabs are used frequently domestically and internationally. But the study on the porous slabs using T-deck plate and assembly of light weight precast construction is insufficient at present. In this study, flexural and fatigue tests were performed on six specimens to verify structural performance and serviceability. The main parameters of the specimens were light weight and T-deck plate construction possibility as well as slab thickness. The test results indicated that the strength of porous slabs using T-deck plate and assembly of light weight were much better than general RC slabs and porous slabs without T-deck plate. And stiffness was much better than that of other tested slabs.

Fatigue Durability of Cramp Joint at Precast Highway Deck Slabs (프리캐스트 바닥판용 클램프 조인트의 피로내구성)

  • Kim, Yoon Chil
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.2
    • /
    • pp.156-162
    • /
    • 2008
  • The fatigue durability test using the actual size beam was performed with a cramp joint in order to apply to the highway bridge deck slab. Three types of beam were investigated for durability performance by considering stress conditions in real bridge deck slabs, 1) A beam with major shear force applied at the joint (RC Type) 2) A beam with major bending moments applied at the joint (PSC Type) 3) A beam with the pure shear applied at the joint. The experiment for beams with cramp joints showed that the cramp joint had enough durability for fatigue regardless of the overlaid length of the looped distribution bars under the current design strength level. Moreover, it was clarified that the enough durability for fatigue under the load repetition was achieved by increasing the joint span grater than 1.5D with the consideration of the deformation due to reduction in joint stiffness.

Evaluation of the Bending Performance of a Modified Steel Grid Composite Deck Joint (격자형 강합성 바닥판의 수정된 이음부에 대한 휨성능 평가)

  • Shin, Hyun-Seop;Park, Ki-Tae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.17 no.4
    • /
    • pp.38-47
    • /
    • 2013
  • For the joint connection of the precast steel grid composite decks, the prefabricated joint which is composed of concrete shear key and high-tension bolts was already proposed. In this study, for the purpose of increasing the bending stiffness and bending strength of the proposed prefabricated joint section details of the proposed joint are modified, and through experimental tests the bending performance, such as stiffness and strength of a modified joint, is compared with those of the proposed joint. Test and analysis results show that the shear cracks in the concrete shear key are clearly reduced by the strengthening of the shear key using shear studs and additional rebars. According to analysis results of the moment-curvature relationship, bending stiffness of the modified joint is about 47% greater than the stiffness of the proposed joint. Furthermore, the modified joint has about 32% greater bending strength than the proposed joint. Compared to specimens without the joint the modified joint has same or slightly higher bending strength, but about 37% lower bending stiffness.

Construction Method of Seohae Grand Bridge (서해대교 시공 공법 소개)

  • Yoon Tae Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.255-266
    • /
    • 2000
  • Since 1993, Seohae grand bridge has been continued construction for 7 years and will be completed late this year. The bridge is a part of west sea castal highway and consists of 3 types of bridge including precast segmental method, free cantilever method and cable stayed bridge. A cable stayed bridge is the core of this bridge and it consists of 5 span, symetrical cable-stayed bridge with a total length of 990 m. The main span between two H-shaped pylons extending approximately 180 M above massive foundation of a cable stayed bridge is 470 m long and an approach span of that is 260 m long respectively. The circular cofferdam with 16 ea of 25 m diameter flat type sheet pile had been applied to construct foundation. The slipform method had been applied for forming of con'c of two H-shaped pylons with 3 cross beams respectively which is varied horizontally and vertically. The deck has been erected with balanced cantilever method using movable derrick crane. The stay cables is a bundle of parallel individually protected, 7 wire high tensile strands. The strands is hot deep galvanized and sheathed with a tight high density polyethylene coating. A petroleum wax fills all the inter-wire voids. The bundle of strands to prevent from deterioration due to the ambient problem covered with high density polyethylene pipe. The Isotension method has been applied for the stressing of cable strands to ensure uniformity of force in all the strands of a syay and such works has been performed on the stay specially provided in the pylon.

  • PDF

Analysis on Bond Characteristics of Reinforcements for UHPC Hybrid Cable-Stayed Bridge Deck Joints (초고성능 콘크리트 하이브리드 사장교 바닥판 접합부 철근의 부착 성능에 대한 해석)

  • Seonwoo, Yoon Ho;Park, Sung Kyun;Kwahk, Im Jong;Yoon, Young Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3A
    • /
    • pp.207-214
    • /
    • 2011
  • Ultra High Performance Concrete (UHPC), which is characterized by its high strength and advanced ductile behavior that is much superior to those of convention concrete, is a useful material to make thinner and longer bridges. The precast segmental construction method utilizing UHPC has been mainly studied because cast-in-place UHPC is very difficult and complicate to be achieved. As a part of those research, the structural performance evaluation of different types of joint connection method for hybrid cable-stayed bridge utilizing UHPC by using nonlinear analyses is performed in this study. The bond stress at joint is obtained by section force analyses for a 600 m cable-stayed bridge deck, and compared with the required bond stress at joint. Analysis results show that the U Type connection and straight type connection resist the highest ultimate load and bond strength, respectively. In addition, all considered joint connection systems satisfy the bond performances at joint required in the final stage of cable-stayed bridge utilizing UHPC.

A Experimental Comparison Study on Structural Behavior of Prefabricated Bridge (조립식 바닥판 교량의 거동에 대한 실험적 비교 연구)

  • Han, Man-Yup;Kim, Seong-Dong;Jin, Kyung-Seok;Kang, Sang-Hun;Cho, Byung-Ku
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.25-28
    • /
    • 2008
  • Currently, the prefabricated bridge having the effects to reduce the term of works and the cost of construction is often studied and countries such as America have already developed members, the parts of it, and the technique of construction. In addition, they have supplied them to the fields. The study of prefabricated method of steel composite bridge, which has the precast deck - plate and main girder fixed by high tension bolt and can resist horizontal sheer, is being progressed. However, it is difficult to understand the characteristics of the prefabricated bridge's behavior when the superstructure of the prefabricated method is analyzed by applying to the analysis model of existing bridges. Therefore, this study has the purpose of understanding real structural behavior of prefabricated bridge through comparison and analysis between the structural analysis model reflecting the characteristics of the real prefabricated bridge's superstructure and real size experiment.

  • PDF