• 제목/요약/키워드: Precast Concrete structure

검색결과 219건 처리시간 0.293초

복합 프리캐스트 콘크리트 패널의 구조 거동에 대한 실험적 연구 (A Experimental Study on Structural Behavior of Hybrid Precast Concrete Panel)

  • 이상섭;박금성
    • 대한건축학회논문집:구조계
    • /
    • 제34권9호
    • /
    • pp.11-18
    • /
    • 2018
  • As the height of the modular buildings increases, their stability becomes more and more dependent on the core. All traditional construction methods in structural concrete and steel can be utilized for cores in modular buildings but a core system with dry connection is more desirable to complete a greater degree of factory finish and faster erection of modular buildings. In order to do that, the hybrid PC(precast concrete) panel, which has a pair of C-shaped steel beams combined at the top and bottom of a concrete wall, was developed, In this study the cyclic lateral loading test on the hybrid PC panel is carried out and the panel configurations are examined to enhance the structural performance in comparison with the RC wall. Experimental results show that the strength of hybrid PC panel is about 70% of thar ot RC wall and the anchorage of vertical reinforcing bar welded to C-shaped steel beam needs to be improved.

윤하중 시험기를 이용한 프리캐스트 바닥판의 동적성능시험 (An Application of Wheel-Tracking-Machine on Dynamic Test of Precast Concrete Decks)

  • 성익현
    • 한국산학기술학회논문지
    • /
    • 제11권2호
    • /
    • pp.644-650
    • /
    • 2010
  • 본 본 연구에서는 교량의 동적거동에 미치는 영향을 분석하기 위한 교량-차량거동을 파악 하고자 실험적 연구를 수행하였다. 이를 위하여 차량 교량 간 상호작용이 포함된 이동질량 형 윤하중 시험기를 조립식 프리캐스트 패널형식의 단순교량에 적용하여 이동질량 반복주행실험을 수행하였다. 실험분석 결과 차량-교량간 상호작용은 교량의 동적거동에 예측 가능한 거동뿐 아니라 상반거동 및 반전현상등의 추가적인 다양한 거동을 발생시킴을 알 수 있었다.

윤하중 실험기를 이용한 프리캐스트 바닥판의 이동질량실험 (An Application of Wheel-Tracking-Machine on Moving Mass Test of Precast Concrete Decks)

  • 성익현
    • 한국재난정보학회 논문집
    • /
    • 제7권3호
    • /
    • pp.198-205
    • /
    • 2011
  • 본 연구에서는 차량-교량 간 상호작용효과가 교량의 동적거동에 미치는 영향을 분석하기 위한 실험적 연구를 수행하였다. 이를 위하여 차량 교량 간 상호작용이 포함된 이동 질량 형 윤하중 시험기를 조립식 프리캐스트 패널형식의 단순교량에 적용하여 이동질량 반복주행실험을 수행하였다. 실험분석 결과 차량-교량 간 상호 작용은 교량의 동적거동에 예측 가능한 거동뿐 아니라 상반거동 및 반전현상 등의 추가적인 다양한 거동을 발생시킴을 알 수 있었다.

프리캐스트 콘크리트 부유식 구조물의 모듈 접합부 강도 (Strength of Joint in Floating Structures Constructed with Precast Concrete Modules)

  • 양인환;김경철
    • 한국항해항만학회지
    • /
    • 제36권3호
    • /
    • pp.197-204
    • /
    • 2012
  • 프리캐스트 콘크리트 모듈 단위로 시공되는 플로팅 구조물의 거동은 콘크리트 모듈 접합부의 거동과 밀접한 연관성을 갖는다. 극한하중조건에서의 플로팅 구조물의 구조적 거동을 정확히 예측하기 위해서 모듈 접합부의 구조거동 실험연구를 수행하였다. 모듈 접합부 전단키의 전단거동, 전단강도 및 균열 패턴을 파악하였다. 실험결과는 전단키의 경사각도가 증가함에 따라 전단강도가 증가하는 것을 나타낸다. 또한, 구속응력이 증가함에 따라 전단키의 전단강도가 증가한다. 실험결과와 AASHTO 제안식에 의한 예측값을 비교하였으며, AASHTO 제안식은 실험값을 과소평가하고 있다.

지하구조물 변위거동에 따른 콘크리트궤도의 손상영향 분석 (Evaluation on Damage Effect of Concrete Track induced by Underground Structure Displacement Behavior)

  • 최정열
    • 문화기술의 융합
    • /
    • 제10권3호
    • /
    • pp.839-844
    • /
    • 2024
  • 본 연구는 인접굴착공사, 지반열화 및 지하수위의 변화에 따른 지하구조물 변위거동이 궤도 손상에 미치는 영향을 해석적으로 분석하였다. 연구대상인 콘크리트궤도는 침목플로팅궤도(STEDEF)와 사전제작형궤도(B2S)를 대상으로 분석하였다. 침목플로팅궤도는 콘크리트 도상과 침목이 분리된 궤도구조이다. 사전제작형궤도는 프리캐스트 슬래브를 이용하여 레일 및 체결장치를 조립하여 레일의 탄성거동을 유도하는 궤도구조이다. 수치해석을 위해 콘크리트 궤도별로 레일부터 콘크리트 도상까지 모두 3차원 요소로 모델링하였다. 또한 지하구조물 변위거동을 변수로 설정하여 콘크리트 도상의 손상영향을 분석하였다. 수치해석을 이용하여 융기 및 침하에 따른 콘크리트 도상 응력을 분석하였으며, 인장강도 및 전단강도와 비교하여 균열 발생 수준을 분석하였다. 분석결과, 동일한 융기 및 침하발생 시 사전제작형궤도보다 침목플로팅궤도가 취약한 것으로 분석되었다. 또한 최대 융기 및 침하부 기준으로 침목플로팅궤도의 균열발생 영향범위가 큰 것으로 분석되었다.

그린 프레임 합성 PC부재의 양중공정 분석 연구 (A Study on the Lifting Progress for Composite Precast Concrete Members of Green Frame)

  • 주진규;김신은;이군재;김선국;이성호
    • 한국건설관리학회논문집
    • /
    • 제13권3호
    • /
    • pp.34-42
    • /
    • 2012
  • 국내 공동주택의 리모델링 수월성 및 이에 따른 장수명화를 위해 그린 프레임 공법이 개발되었다. 그린 프레임 공법은 합성 프리캐스트 콘크리트 부재를 이용한 라멘구조로 벽식 구조와는 달리 양중 및 설치가 골조공사의 주공정으로 작용한다. 따라서 그린 프레임에 의한 적정 골조공사 공기 산정을 위해서는 체계적인 양중계획이 필요하다. 그러나 양중계획은 그린 프레임을 구성하는 요소인 합성 PC 부재(기둥, 보)의 단위 양중공정에 대한 분석이 선행되어야 한다. 따라서 본 연구는 그린 프레임 합성 PC 부재의 양중공정을 분석하는 것을 목적으로 한다. 이를 위해 합성 PC 기둥과 보의 양중절차와 시간을 도출하고, 그 결과를 사례 프로젝트에 적용하여 기준층의 양중 사이클을 분석한다. 본 연구의 결과는 향후 그린 프레임에 의한 골조공사 양중계획 시 핵심자료로 사용된다.

Racking shear resistance of steel frames with corner connected precast concrete infill panels

  • Hoenderkamp, J.C.D.;Snijder, H.H.;Hofmeyer, H.
    • Steel and Composite Structures
    • /
    • 제19권6호
    • /
    • pp.1403-1419
    • /
    • 2015
  • When precast concrete infill panels are connected to steel frames at discrete locations, interaction at the structural interface is neither complete nor absent. The contribution of precast concrete infill panels to the lateral stiffness and strength of steel frames can be significant depending on the quality, quantity and location of the discrete interface connections. This paper presents preliminary experimental and finite element results of an investigation into the composite behaviour of a square steel frame with a precast concrete infill panel subject to lateral loading. The panel is connected at the corners to the ends of the top and bottom beams. The Frame-to-Panel-Connection, FPC4 between steel beam and concrete panel consists of two parts. A T-section with five achor bars welded to the top of the flange is cast in at the panel corner at a forty five degree angle. The triangularly shaped web of the T-section is reinforced against local buckling with a stiffener plate. The second part consists of a triangular gusset plate which is welded to the beam flange. Two bolts acting in shear connect the gusset plate to the web of the T-section. This way the connection can act in tension or compression. Experimental pull-out tests on individual connections allowed their load deflection characteristics to be established. A full scale experiment was performed on a one-storey one-bay 3 by 3 m infilled frame structure which was horizontally loaded at the top. With the characteristics of the frame-to-panel connections obtained from the experiments on individual connections, finite element analyses were performed on the infilled frame structures taking geometric and material non-linear behaviour of the structural components into account. The finite element model yields reasonably accurate results. This allows the model to be used for further parametric studies.

Precast Concrete Panel을 사용한 슬라브궤도 시험시공에 대한 평가 (Evaluation for the Test Installation of Slab Track by Using Precast Concrete Panels)

  • 김순철;공선용;강정옥;이종민;한광섭
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 춘계학술대회 논문집
    • /
    • pp.1071-1077
    • /
    • 2004
  • This paper is presenting the performance evaluation on the installed concrete panels. As a result of the evaluation, the resistance to track displacement of temporary support structure was improved and it resulted in the improvement of work stability during installation. And, by the application of new technology and the saving of concrete consumption, both workability and cost were improved and, therefore, the shorter project period and cost saving can be expected. Furthermore, as a result of noise & vibration measurement at site, it has shown good effects of anti-noise and anti-vibration. In conclusion, this process was proved as very effective for track improvement.

  • PDF

초대형 건축물의 PC부재 양중작업 사례연구 (Case Study of Precast Concrete Erection Work of the Heavy-Loaded Long Span Structure)

  • 조원현;나영주;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.58-59
    • /
    • 2016
  • Along with the logistics development, heavy-loaded warehouses and sales facilities tend to be bigger and designed as a PC structures. PC erection work of heavy-loaded structures is influenced by various factors, including the required construction duration, site and surrounding situations, safety, PC member procurement, equipment rental cost, which ultimately impact the construction cost. It requires creative efforts and a lot of time when preparing an erection plan in consideration of these factors, and the plan prepared has a great influence on safety as well as the construction duration and cost. However, many engineers do not have enough experiences on PC erection work of heavy-loaded, long span structures, making it difficult for them to set erection plans and establish simulations. The study's results will provide a knowledge to obtain a solution for engineers to establish PC erection plans of heavy-loaded, long span structures.

  • PDF

LSM을 사용한 합성 PC 부재의 현장생산 공기 산정 기초연구 (Basic study for time analysis of insitu production of composite precast concrete members using linear scheduling method)

  • 임채연;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.92-93
    • /
    • 2014
  • Green Frame is a method for Rahmen structure construction composed of composite PC members. The composite PC members of Green Frame which are based on in-situ production can reduce the construction cost and are more likely to secure quality when compared to production in factories. Previous studies developed forms for in-situ production of Green Frame composite PC members and proposed algorithms to arrange them on site. However, it requires not only their arrangement, but also calculation of an accurate production period to produce the required PC members in a limited space and supply them in a timely manner. In particular, it is necessary to clearly define the properties of detailed processes for in-situ production of PC members and to calculate the time required for respective process. To do so, this study is a basic research on calculating the time for in-situ production using a linear scheduling method.

  • PDF