• 제목/요약/키워드: PreService Inspection

검색결과 39건 처리시간 0.024초

P-PIE 프로그램을 이용한 배관에서의 누설확률 평가 (Evaluation of Leak Probability in Pipes using P-PIE Program)

  • 박재학;신창현
    • 한국안전학회지
    • /
    • 제32권6호
    • /
    • pp.1-8
    • /
    • 2017
  • P-PIE is a program developed to estimate failure probability of pipes and pressure vessels considering fatigue and stress corrosion crack growth. Using the program, crack growth simulation was performed with an initially existing crack in order to examine the effects of initial crack depth distribution on the leak probability of pipes. In the simulation stress corrosion crack growth was considered and several crack depth distribution models were used. From the results it was found that the initial crack depth distribution gives great effect on the leak probability of pipes. The log-normal distribution proposed by Khaleel and Simonen gives lower leak probability compared other exponential distribution models. The effects of the number and the quality of pre-service and in-service inspections on the leak probability were also examined and it was recognized that the number and the quality of pre-service and in-service inspections are also give great effect on the leak probability. In order to reduce the leak probability of pipes in plants it is very important to improve the quality of inspections. When in-service inspection is performed every 10 years and the quality of inspection is above the very good level, the leak probability shows nearly constant value after the first inspection for an initially existing crack.

월성 3,4호기 증기발생기 전열관 검사 (Wolsong 3&4 Steam Generator Tube Inspection)

  • 장경식;권동기;최진혁;손태봉
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2001년도 추계학술대회논문집B
    • /
    • pp.859-866
    • /
    • 2001
  • During the Pre-service Inspection for Wolsong Unit 3&4 in 1997/1998 respectively, 17 Distorted Roll Transition indications(over expanded beyond tubesheet secondary face) were identified at the Unit 4 (S/G B, D). Six(6) tubes out of these tubes were plugged in 1998. However the first Periodic Inspection identified additional 110 indications in 1999 and 2000. The additionally identified 110 indication call, not reported at the Pre-service Inspection, are; 2 Not-Finally-Expanded-Tubes and 108 Distorted Roll Transition tubes. Design limit of each Steam Generator tube Plugging is 6.4%. Plugging was performed by the Steam Generator manufacturer under the warranty. When Distorted Roll Transition indications were first identified on the Unit 4 in 1998 the degree of Over-expansion was measured using an inner dial-gage to make the disposition of Nonconformance report. 2 Not-Finally-Expanded-Tubes were plugged and 10 tubes out of 108 Distorted Roll Transition Tubes were also plugged as a preventive measure.

  • PDF

원자로 헤드 관통관 노즐 가동전 검사 수행 (Pre-Service Inspection for Reactor Vessel Penetration Nozzle)

  • 이동진;노익준;신건철;김해석;홍주열;최정권
    • 한국압력기기공학회 논문집
    • /
    • 제6권2호
    • /
    • pp.9-15
    • /
    • 2010
  • US NRC issued rulemaking of 10CFR50.55a to perform the Perservice and Inservice inspection for Reactor Vessel Head Penetration Nozzle of US Nuclaer plant. The rulemaking was required the EPRI Demonstration to verify the NDE technique performing special Ultrasonic examination. In order to meet this requirement, the UT and ECT procedures was demonstrated and the NDE personnel were qualified by EPRI. In this paper, the NDE technique and analysis method are described the Preservice inspection for the Palo Verde #1/2/3 Replacement Reactor Vessel Head Penetration Nozzle using the qualified procedures and personnel.

  • PDF

자가용전기설비의 사용전 자율검사제도 도입추진방안 (Research on Pre-service Inspection on Electrical Installations for Private Use based on Self-reliance)

  • 김한영;류기현;황민수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 전기설비
    • /
    • pp.112-114
    • /
    • 2005
  • It is obvious that electrical safety cannot be secured soley by the efforts from public sector including government. With the global trend of deregulation as WTO/TBT agreement comes into effect, foreign countries strive to minimize unnecessary and inefficient regulations in every field by sharing responsibilities with the privae sector to secure international competency in trade. To this same end, in this paper 2 level approach plan is suggested to pave the way to the self-security system in electrical field by introducing self-reliance safety system by stage for pre-service inspection on the electrical installations for private use based on product requirements in terms of performance.

  • PDF

원전 가동전/중 검사정보관리 시스템 개발 (Development of Pre-Service and In-Service Information Management System (iSIMS))

  • 유현주;최성남;김형남;김영호;양승한
    • 비파괴검사학회지
    • /
    • 제24권4호
    • /
    • pp.390-395
    • /
    • 2004
  • iSIMS는 한국 수력원자력 주식회사의 원자력발전소에서 수행하는 가동전/중 검사 절차를 지원하는 웹베이스의 통합 정보 시스템이다. 이 시스템은 가동전/중 검사에 적합한 적용규격(CODE, Standards) 및 규제기관에서 원하는 규제조건 등과 부합하는 검사 계획단계에서 최종 보고서 단계까지의 전체 검사공정을 지원하는데 목적을 두고 있다. 이 시스템의 주요 기능은 검사계획, 검사 및 보고서출력, 검사과정 통제 및 해당 검사부위의 정보 찾기와 그 부위를 비쥬얼하게 찾아 갈 수 있는 자원관리 부분으로 구성된다 본 시스템은 해당 용접부에 대해 2D로 된 위치정보와 3D로 제공되는 비쥬얼정보를 제공하고 이들은 데이터베이스 응용프로그램과 인터페이스 하여 서로에 대한 정보를 공유하여 사용자에게 제공한다. iSMIS는 데이터베이스 관리 도구, 2D와 3D 비쥬얼 도구 등의 상용 소프트웨어 패키지를 사용하여 구현하였다. iSIMS에 대한 주요 기능과 기술은 본문에 기술하였다.

정보시스템의 정보보호를 위한 사전점검에 관한 연구 (A Study of Pre-inspection for Information Security in Information System)

  • 이근호
    • 디지털융복합연구
    • /
    • 제12권2호
    • /
    • pp.513-518
    • /
    • 2014
  • IT기술의 발전에 따라 다양한 신규 IT서비스가 생겨나고 있다. 신규 IT 서비스는 이용자의 서비스 접근의 편의성을 제공하나 네트워크와 복합 단말기 사용 등 정보시스템의 복잡도가 증가하고 있어 다양한 보안에 대한 위협과 취약성이 증가하고 있다. 정보시스템에 대한 안전성을 확보하기 위하여 정보통신 서비스 구축단계에서부터 정보보호 취약점 분석 등을 통해 사전에 취약점을 제거하고 정보보호 대책을 수립하여 적용하였는지에 대한 점검 활동에 대한 제도를 마련하고 있다. 본 논문에서는 정보시스템에 사전점검 방법에 대한 각 나라별 소개와 추진현황에 대해서 살펴본다. 한국인터넷 진흥원에서 추진하고 있는 사전점검 방법에 대한 추진 방향과 안전성을 확보하기 위한 활성화 방향에 대해서 제안한다.

A Roots Method in GI/PH/1 Queueing Model and Its Application

  • Choi, Kyung Hwan;Yoon, Bong Kyoo
    • Industrial Engineering and Management Systems
    • /
    • 제12권3호
    • /
    • pp.281-287
    • /
    • 2013
  • In this paper, we introduce a roots method that uses the roots inside the unit circle of the associated characteristics equation to evaluate the steady-state system-length distribution at three epochs (pre-arrival, arbitrary, and post-departure) and sojourn-time distribution in GI/PH/1 queueing model. It is very important for an air base to inspect airplane oil because low-quality oil leads to drop or breakdown of an airplane. Since airplane oil inspection is composed of several inspection steps, it sometimes causes train congestion and delay of inventory replenishments. We analyzed interarrival time and inspection (service) time of oil supply from the actual data which is given from one of the ROKAF's (Republic of Korea Air Force) bases. We found that interarrival time of oil follows a normal distribution with a small deviation, and the service time follows phase-type distribution, which was first introduced by Neuts to deal with the shortfalls of exponential distributions. Finally, we applied the GI/PH/1 queueing model to the oil train congestion problem and analyzed the distributions of the number of customers (oil trains) in the queue and their mean sojourn-time using the roots method suggested by Chaudhry for the model GI/C-MSP/1.

원전 증기발생기 와전류검사 시스템 현장적용 연구 (Field Feasibility Study of an Eddy Current Testing System for Steam Generator Tubes of Nuclear Power Plant)

  • 문균영;이태훈;김인철
    • 한국압력기기공학회 논문집
    • /
    • 제11권2호
    • /
    • pp.13-19
    • /
    • 2015
  • Steam generator is one of the most important component of nuclear power plant, and it's integrity and reliability are to be assured to high level by pre-service inspection and in-service inspection. To improve the reliability of steam generator heat exchanger tubes and to secure the management of nuclear power plant safely, KHNP CRI recently has developed eddy current testing system for steam generator. KHNP CRI have performed a series of experimental verification and field application to confirm the performance of the developed ECT system in accordance with ASME Code requirements. The ECT system consists of a remote data acquisition unit, an ECT signal acquisition and analysis software, a water chamber robot controller and a probe push-puller. In this paper, we will details of the developed ECT system and the software and their experimental performance. And also we will report the field applying performance and the issues for further steps.

원전 ISI UT 자동 결함평가 및 판정 모듈 개발 (Development of ISI UT Auto Flaw Evaluation and Acceptance Module of Nuclear Power Plants)

  • 박익근;박은수;김현묵;김정석;엄병국;이종포
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2000년도 추계학술대회논문집A
    • /
    • pp.212-218
    • /
    • 2000
  • The importance and role of pre-/in-service inspection(PSI/ISI) for nuclear power plant(NPP) components are intimately related to plant design, safety, reliability, operation, etc. In this paper, for an effective and efficient management of large amounts of PSI/ISI data in NPPs, an intelligent database program(WS-IDPIN) for PSI/ISI data management of NPP was developed. WS-IDPIN program enables the prompt extraction of previously conducted PSI/ISI conditions and results so that the time-consuming data management, painstaking data processing and analysis in the past are avoided. Furthermore, development of ISI UT auto flaw evaluation and acceptance module based on ASME Code Sec. XI were presented. This module can be used for any angle beam examination from flat plate to spherical shapes as selected by the proper azimuthal angle. This program can be further developed as a unique PSI/ISI data management expert system.

  • PDF

피뢰기를 고려한 자가용 전기설비 인입선로의 직류누설전류시험에 관한 연구 (A Study on the DC Leakage Current Test for Power Cable of Private Electrical Facilities considering Lightning Arrester)

  • 정기석;길형준
    • 전기학회논문지
    • /
    • 제67권1호
    • /
    • pp.142-147
    • /
    • 2018
  • Private electrical facilities are judged whether it is suitable for the insulation aging condition of their incoming underground cables using DC leakage current test method. In the case where the service point of utility is the secondary side of cut out switch installed in the electric pole, there is a problem that it is difficult to separate the lightning arresters(LA) because of their high position of the pole. Therefore, the field test voltage is applied at value lower than DC 30 kV, which are stated in the inspection guideline. However, this test could reduced the insulation performance of the LA by accelerating the electrical stress of the metal oxide varistor element in the pre-breakdown region. In this study, we analyzed the relationship between the DC test voltage and the leakage current using the non-destructive DC high voltage equipment with leakage current measurement function. The results show that the leakage current increases sharply above the specified test voltage. As a consequence, it could be contributed to improve insulation aging inspection method by selecting the possible test area on the VI characteristic curve of the pre-breakdown area of the LA.