1 |
H. M. Thomas, "Pipe and Vessel Failure Probability", Reliability Engineering, Vol. 2, pp. 83-124, 1981.
DOI
|
2 |
B. O. Y. Lydell, "Pipe Failure Probability-the Thomas paper revisited", Reliability Engineering and System Safety, Vol. 68, pp. 207-217, 2000.
DOI
|
3 |
American Petroleum Institute, Risk-Based Inspection Technology, API RP-581, 2nd Ed., American Petroleum Institute, Washington, USA, 2008.
|
4 |
B. Lydell and J. Rizinec, "OPDE-The International Pipe Failure Data Exchange Project", Nuclear Engineering and Design, Vol. 238, pp. 2115-2123, 2008.
DOI
|
5 |
R. Nyman, et al., Reliability of Piping System Components. Framework for estimating failure parameters from service data, Report 97:26, Swedish Nuclear Power Inspectorate, Stockholm, Sweden, 1997.
|
6 |
D. M. Norris, A. Okamoto, B. Chexal and T. Griesbach, "PICEP: Pipe Crack Evaluation Program", EPRI Report EPRI NP-3596-SR, 1984.
|
7 |
D. O. Harris, D. D. Dedhia and S. C. Lu, "Theoretical and User's Manual for pc-PRAISE", USNRC Report NUREG/CR-5864, 1992.
|
8 |
D. O. Harris and D. Dedhia, "WinPRAISE 07; Expanded PRAISE Code in Windows", Structural Integrity Associates, Inc., 2007.
|
9 |
PRO-LOCA-GUI/PRO-LOCA User's guide (Version 3.5.32), Battelle , 2009.
|
10 |
Y. K. Cho, S. H. Kim and J. H. Park,"Sensitivity Analyses of Failure Probability of Pipes in Nuclear Power Plants Using PRO-LOCA", Journal of the Korean Society of Safety, Vol. 29, No. 3, pp. 136-142, 2014.
DOI
|
11 |
J. H. Park, Development of a Program for Assessment of LOCA Probability of Pipes, KINS Report, KINS/HR- 1337, 2014.
|
12 |
J. H. Park, J. B. Lee and Y. H. Choi, "Development of P-PIE Program for Evaluation Failure Probability of Pipes in Nuclear Power Plants", Journal of the Korean Society of Safety, Vol. 25, No. 6, pp. 1-8, 2010.
|
13 |
H. P. Seifert, Literature Survey on the Stress Corrosion Cracking of Low-Alloy Steels in High-Temperature Water, PSI Bericht Nr. 02-06, Paul Scherrer Institut, 2002.
|
14 |
HSE, Failure Rate and Event Data for Use within Risk Assessment (28/06/2012), 2012, HSE Publication
|
15 |
M. A. Khaleel and F. A. Simonen, Evaluation of Structural Failure Probabilities and Candidate Inservice Inspection Programs, NUREG/CR-6986, Pacific Northwest National Lab., Washington, USA , 2009.
|
16 |
D. O. Harris, E. Y. Lim and D. D. Dedhia, Probability of Pipe Fracture in the Primary Coolant Loop of a PWR Plant, NUREG/CR-2189, Vol. 5, Science Applications Inc., Livermore, California, USA , 1981.
|
17 |
T. J. Griesbach, D. O. Harris, H. Qian, D. Dedhia and J. Hayden, "The Effects of Flaw Size and In-Service Inspection on CASS Piping Reliability", 9th International Conference on NDE in Relation to Structural Integrity for Nuclear and Pressurized Components, May 22-24, 2012, Seattle, Washington, USA, 2002.
|
18 |
K. D. Bae, H. W. Ryu, Y. J. Kim, J. W. Kim, J. S. Kim and Y. J. Oh, "Determination Method of Ramberg-Osgood Constants for Leak Before Break Evaluation", Trans. Korean Soc. Mech. Eng. A, Vol. 39, No. 7, pp. 645-652, 2015.
DOI
|