• Title/Summary/Keyword: Pre-excavation

Search Result 117, Processing Time 0.033 seconds

Efficiency assessment of L-profiles and pipe fore-poling pre-support systems in difficult geological conditions: a case study

  • Elyasi, Ayub;Moradi, Taher;Moharrami, Javad;Parnian, Saeid;Mousazadeh, Akbar;Nasseh, Sepideh
    • Structural Engineering and Mechanics
    • /
    • v.57 no.6
    • /
    • pp.1125-1142
    • /
    • 2016
  • Tunneling is one of the challenging tasks in civil engineering because it involves a variety of decision making and engineering judgment based on knowledge and experience. One of the challenges is to construct tunnels in risky areas under shallow overburden. In order to prevent the collapse of ceilings and walls of a large tunnels, in such conditions, either a sequential excavation method (SEM) or ground reinforcing method, or a combination of both, can be utilized. This research deals with the numerical modeling of L-profiles and pipe fore-poling pre-support systems in the adit tunnel in northwestern Iran. The first part of the adit tunnel has been drilled in alluvial material with very weak geotechnical parameters. Despite applying an SEM in constructing this tunnel, analyzing the results of numerical modeling done using FLAC3D, as well as observations during drilling, indicate the tunnel instability. To improve operational safety and to prevent collapse, pre-support systems, including pipe fore-poling and L-profiles were designed and implemented. The results of the numerical modeling coupled with monitoring during operation, as well as the results of instrumentation, indicate the efficacy of both these methods in tunnel collapse prevention. Moreover, the results of modeling using FLAC3D and SECTION BUILDER suggest a double angle with equal legs ($2L100{\times}100{\times}10mm$) in both box profile and tee array as an alternative section to pipe fore-poling system while neither $L80{\times}80{\times}8mm$ nor $2L80{\times}80{\times}8mm$ can sustain the axial and shear stresses exerted on pipe fore-poling system.

Thermo-mechanical simulations of pillar spalling for in-situ heater test by FRACOD

  • Lee Hee-Suk;Shen Baotang;Mikael Rinne
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2003.11a
    • /
    • pp.244-251
    • /
    • 2003
  • A two-dimensional BEM code, $FRACOD^{2D}$, was applied to simulate fracture initiation and propagation processes in a rock pillar during an in situ heater test of a rock pillar planned at the $\"{A}sp\"{o}$ Underground Rock laboratory of SKB, in Southern Sweden. To take the advantage of conventional BEM for simulating fracturing processes, but without efforts for domain integral transformation, a hybrid approach is developed to simulate the fracturing processes in rock pillar under coupled thermo-mechanical loading. The code FRACOD was used for simulating the fracture initiation and propagation processes with its boundary tractions reflecting the effects of the initial and redistributed thermomechanical stresses in the domain of interest at multiple excavation and heating steps were produced by a special algorithm of stress inversion, based on resultant thermo-mechanical stress fields at each excavation and heat loading step by a FEM code without considering fracturing processes. This hybrid approach can take the advantages of both types of numerical methods and avoids their shortcomings for fracturing process simulation and domain effects, respectively. In this paper, we present the hybrid approach for the stress, displacements, and fracturing processes at sequential excavation and heating steps of the in situ heater test as a predictive modelling, the formulation of the fracturing models and the predictive results. Two sections of borehole depth, 0.5 m and 1.5 m below the tunnel floor are considered. The pillar area is modelled with the FRACOD and the stress field produced by excavation and heating is transferred with corresponding boundary stresses. From the modelling results, the degree of fracturing and damage are evaluated for 120 days of heating. Dominated shear fracturing in the vicinity of the central pillar was observed from the models at both sections, but spalled area appears to be limited. Based on the modelling results, a sensitivity study for the effect of pre-existing fractures in the vicinity of the holes is also conducted, and the initiation and evolution of EDZ around the deposition holes are investigated using this particular numerical technique.

  • PDF

Off-Site Distortion and Color Compensation of Underwater Archaeological Images Photographed in the Very Turbid Yellow Sea

  • Jung, Young-Hwa;Kim, Gyuho;Yoo, Woo Sik
    • Journal of Conservation Science
    • /
    • v.38 no.1
    • /
    • pp.14-32
    • /
    • 2022
  • Underwater photographing and image recording are essential for pre-excavation survey and during excavation in underwater archaeology. Unlike photographing on land, all underwater images suffer various quality degradations such as shape distortions, color shift, blur, low contrast, high noise levels and so on. Outcome is very often heavily photographing equipment and photographer dependent. Excavation schedule, weather conditions, and water conditions can put burdens on divers. Usable images are very limited compared to the efforts. In underwater archaeological study in very turbid water such as in the Yellow Sea (between mainland China and the Korean peninsula), underwater photographing is very challenging. In this study, off-site image distortion and color compensation techniques using an image processing/analysis software is investigated as an alternative image quality enhancement method. As sample images, photographs taken during the excavation of 800-year-old Taean Mado Shipwrecks in the Yellow Sea in 2008-2010 were mainly used. Significant enhancement in distortion and color compensation of archived images were obtained by simple post image processing using image processing/analysis software (PicMan) customized for given view ports, lenses and cameras with and without optical axis offsets. Post image processing is found to be very effective in distortion and color compensation of both recent and archived images from various photographing equipment models and configurations. Merits and demerit of in-situ, distortion and color compensated photographing with sophisticated equipment and conventional photographing equipment, which requires post image processing, are compared.

An experimental study for the effect of soil plug on the basal heave stability for the vertical shaft excavation in clay (점성토 지반 수직구 굴착 중 히빙 안정성 증가에 대한 관내토 효과에 대한 실험적 연구)

  • Kang, Seok-Jun;Cho, Gye-Chun;Kim, Jung-Tae;Cha, Yohan;Hong, Eun-Soo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.1
    • /
    • pp.183-195
    • /
    • 2018
  • Recently, the need for research on vertical shaft excavation is increasing with the increase of the demands for the underground and utility tunnels. As a part of the R&D project of the Ministry of Land, Infrastructure and Transport, CUT (center for utility tunnel) has developed "Ring cut method". "Ring cut method" is a method to improve the stability of the ground against the basal heave by excavator wall pre-penetration during vertical shaft excavation. In this study, the basal heave was simulated by centrifugal model test. The basal heave, ground subsidence, and ground deformation of surrounding ground were analyzed by soil plug effect from wall pre-penetration. It was found that the soil plug could control the basal heaving and ground subsidence, and verified that the 'Ring cut method' could be a good countermeasure for the ground stability against the basal heave.

CONSTRUCTION OF SUBWAY TONNEL BENEATH EXISTING VEHICLE UNDERPASS

  • Kim, In-Kuin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1990.10a
    • /
    • pp.25-34
    • /
    • 1990
  • For the construction of twin single track subway tunnels by NATM within close proximity of existing vehicle underpass in the highly congested area of downtown Seoul, finite element analyses were performed to evaluate the ground responses during tunnelling and also the stability and safety of the underpass structure and subway tunnels. Results of the analyses indicated the need to improve the soil beneath the underpass, and pre-grouting was carried out prior to the tunnel excavation. During tunnel construction field measurement program was implemented to confirm the results of anslyses and to control the tunnel construction procedures, thus ensuring stability of the existing structres.

  • PDF

Downward Method of H-PILE Alternative Materials of Percusion Rotary Drill (PRD시공시 H-PILE 대체 자재로 원가절감 할수 있는 공법 사례)

  • Lee, Wang-Hee;Lee, Il-Jae;Iim, Si-Nae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.199-202
    • /
    • 2014
  • In recent years the downtown, Top-down method has been applied in a major method to solve the complaints due to noise, vibration, dust and safety issues such as cracking due to settlement when the excavation close to the building. Until it is installed underground permanent foundation, the Pre-founded Column is a pile foundation as well as a column to bear the upper construction load. The Pre-founded Column is constructed by PRD method generally. The EnP(Enlarging Pile) method can be expanded locally boring diameter of the embedment zone as compared to the PRD method existing general. Since the bearing capacity is increased by the boring diameter is expanded, the embedment length is reduced, the construction cost is reduced.

  • PDF

Development of Pre-Postprocessing Toolbox for Elasto-plastic Analysis of Underground Structures with Water Flow (지하수 흐름을 고려한 지하구조계의 탄소성해석에 대한 전-후처리기법의 개발)

  • 김문겸;임성철;이재영;송재성
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1997.04a
    • /
    • pp.79-86
    • /
    • 1997
  • In this study, pre-postprocessing toolbox is developed to perform elasto-plastic analyze of underground structures with transient ground water flow. This toolbox is composed of three modules. The first is the data input processor for the structural analysis. The preprocessing Is using GUI (Graphic User Interface), which is consist of dialog box, pull down, and short-cut icon, etc. The second is the structural analysis module. The analysis is based on the elasto-plastic finite element method involving additional options such as ground excavation effect, transient ground water flow, and rock bolts behavior. The last is the postprocessing module. The postprocessing is able to verify the result of the structural analysis by the graphical simulation which visualizes the element mesh, the node displacements, the element stress states, the stress contour, the ground water surface, and the rock bolt stresses. Since various options are considered separately in this toolbox, it is easy to modify the module of each processing, and to update other functional modules for the given analysis conditions.

  • PDF

Development of Connection between CFT Column and Pier Foundation for Top-Down Construction (Top-Down 공사용 원형충전강관기둥과 피어기초의 개발)

  • Jeong, Mee-Ra;Rhim, Hong-Chul;Kim, Seung-Weon;Kim, Dong-Gun;Kang, Seung-Ryong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.29-32
    • /
    • 2009
  • Building foundations for Top-Down construction require a special setting, because the foundations have to be placed way before excavation for the substructure of main building, Usually, the foundation goes into the layer of rock and it is often called rock-pier foundation, Currently, a cage of steel reinforcing bars is inserted to the pre-excavated hole in the rock layer, hanging down from the wide flange steel column above. This paper presents a new method for connecting the prefounded column and the steel cage with a coupler for better connection between the two, The use of a circular Concrete Filled Tube (CFT) as a prefounded column makes it possible to have this type of connection. The details of the connection and application to a Top-Down construction site is also included in this paper.

  • PDF

A study on the determination of shear strength and the support design of pre-failed rock slope (일차파괴된 암반사면의 전단강도 및 보강설계법 고찰)

  • 조태진;김영호
    • Tunnel and Underground Space
    • /
    • v.5 no.2
    • /
    • pp.104-113
    • /
    • 1995
  • Shear strength of the discontinuity on which the pre-failure of rock slope was occurred during surface excavation was measured through the direct shear test using core samples obtained in-situ. Internal friction angle was increased as the roughness of discontinuity surface(JRC) was increased. Results of the tilt test using core samples of higher JRC also showed very similar trend as those of the direct shear test. When the samples replicated from natural cores were used int he tilt test, results of friction angles showed almost perfect continuation of the residual friction angles from the direct shear test. However, when the gouge material existed in the discontinuity the internal friction angle strongly depended upon the rate of filling thickness to the height of asperity irrespective of the JRC. Based on the results of both direct shear test and tilt test internal friction angle and cohesion of discontinuity, which reflect the in-situ conditions fo pre-sliding failure and also can be used for the optimum design of support system, were assessed. Two kinds of support measures which were expected to increase the stability of rock slope were considered; lowering of slope face angle and installation of rock cable. But, it was found that the first method might lead to more unstable conditions of rock slope when the cohesion of discontinuity plane was negligibly low and in that case the support systems of any kind which could exert actual resisting force were needed to ensure the permanent stability of rock slope.

  • PDF

Tunnel Safety Diagnosis in Near-excavation by In-depth Inspection of Tunnel (기존터널 안전진단 결과를 통한 근접시공 시 터널 안정성 평가)

  • Kim, Seok-Jae;Kim, Min-Seok;Kim, Jun-Chul;Yoo, Young-Il;Oh, Joung-Bae;Oh, Sae-Joon
    • Tunnel and Underground Space
    • /
    • v.16 no.4 s.63
    • /
    • pp.347-356
    • /
    • 2006
  • We analyzed case studies doing in-depth inspection of tunnel to maintain safety of existing tunnel in constructing new tunnel near to a existing tunnel with single track. Futhermore, We accomplished in-depth inspection of existing tunnel and numerical analysis. We suggested remedies to security safety of existing tunnel. We applied line drilling and pre-large hole boring method not to have an effect on existing tunnel and convinced the safety of existing tunnel from blast-vibration and blast-noise of numerical analysis. We planed to install basset system to measure displacement of existing tunnel according to excavating new tunnel.