• Title/Summary/Keyword: Pre-erection block

Search Result 14, Processing Time 0.024 seconds

Development of Distortion Analysis Method for Multi-pass Butt-welding Based on Shell Element (다층 맞대기용접의 쉘 요소 기반 변형해석법 개발)

  • Ha, Yun-Sok;Yang, Jin-Hyuk
    • Journal of Welding and Joining
    • /
    • v.28 no.1
    • /
    • pp.54-59
    • /
    • 2010
  • Ship Blocks are assembled by welding, and among them, welding between large blocks (Pre-erection stage) is used as feature of butt. In this process, local material has a experience of thermal cycle and become finally shrunk. As for inconsistency of shrunk weldments and adjacent regions, ship structure would be deformed locally and globally. Thermal distortion analyses are done for control of these processes, and methodologies capable of ship block size among them are using 2-D shell element in FEM. A shell element takes charge of plate, so it has its thickness which is important for angular distortion by welding. By the way, a butt-welding consists normally of several passes, and weldment thickness are different at each pass. If a calculated final one-time welding shrinkage is acting on the shell element whose thickness is same as it of plate, then deformation value must be underestimated. This research developed a methodology that total deformation after multi-pass welding can be analyzed by one time at shell element having original thickness of its plate. We use the SDB thermal distortion analysis method and verified by several experiment. The both experimental and analysis results showed good agreements.

On-Site Construction Method for U-Girder with Pre-tension and Verification of Analytical Performance of Anchoring Block (프리텐션 U형 거더 현장 제작 방법 및 정착 블록 해석적 성능 검증)

  • Park, Sangki;Kim, Jaehwan;Jung, Kyu-San;Seo, Dong-Woo;Park, Ki-Tae;Jang, Hyun-Ock
    • Journal of Korean Society of Disaster and Security
    • /
    • v.15 no.3
    • /
    • pp.67-77
    • /
    • 2022
  • In South Korea, U-type girder development was attempted as a means to increase the length of I-type girder, but due to the large self-weight according to the post-tension method, the application of rail bridges of 30m or less is typical. There are not many examples of application of pre-tension type girder. This study does not limit the post-tension method, but applies the pre-tension method to induce a reduction in self-weight and materials used due to the reduction of the cross-section. In addition, we intend to apply the on-site pre-tensioning method using the internal reaction arm of the U-type girder. The prestressed concrete U-type girder bridge is composed of a concrete deck slab and a composite section. Compared to the PSC I-type, which is an open cross-section because the cross section is closed, structural performance such as resistance and rigidity is improved, the safety of construction is increased during the manufacturing and erection stage, and the height ratio is reduced due to the reduction of its own weight. Therefore, it is possible to secure the aesthetic scenery and economical of the bridge. As a result, it is expected that efficient construction will be possible with high-quality factory-manufactured members and cast-in-place members. In this paper, the introduction of the pre-tension method on-site and the analytical performance verification of the anchoring block for tension are included.

A Study on the application of Roof Truss Sliding Method in the Incheon International Amort Transportation Center - Great Hall (Roof Truss Sliding 공법 적용사례 연구 인천국제공항 교통센터 - Great Hall)

  • Lee Dong-Ryul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.214-221
    • /
    • 2001
  • The Great Hall of Incheon International Airport Transportation Center has irregular curved roof structure. The structure consists of 13 main steel trusses. (the longest span of 162m, 480ton) The total weight of the truss is 6,300ton and the whole truss is made of 9,600 pieces which has the joint connected to maximum 13 different parts at one point and Roof Truss is supported by 12 Fabric Foundation. Considering the economical efficiency and the schedule, the Sliding Construction Method was used other than conventional erection method. The roof truss structure was divided into two blocks, 3,550ton and 2,700ton, each block was pre-erected on the Giant Sleigh off the site and was pulled 181m by using Tandem Pulling Jack and Strand to be set in place.

  • PDF

A Study on Effect of Coating Stain on the Performance of Electric Cable (도장 오염이 Electric Cable의 성능에 미치는 영향 연구)

  • Cho, Yeon-Ho;Lee, Sang-Hyeok;Son, Young-Shuk
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2009.09a
    • /
    • pp.18-23
    • /
    • 2009
  • After the installation of electric cables at block, PE(pre-erection) and hull stages, the coating stains on the electric cable sheath were unavoidably occurred by additional painting process. According to class rules paint or coating applied on the electric cables shall not adversely affect the mechanical, chemical of fire resistant characteristics of the electric cable sheath. However, there has not been quantitatively studied about the effect of coating stains on properties of sheath materials. In this study, we tried to investigate the effect of coating stains on the performance and deterioration of sheath materials by using FTIR, SEM analysis, flame retardant, high potential voltage and tensile test. The results sowed that coating stains, which were occurred during painting work on site could not adversely affect on the performance and deterioration of sheath materials.

  • PDF