• Title/Summary/Keyword: Pre-erection/Erection stage

Search Result 7, Processing Time 0.02 seconds

Application of Sensor Technology for the Efficient Positioningand Assembling of Ship Blocks

  • Lee, Sang-Don;Eun, Seong-Bae;Jung, Jai-Jin;Song, Ha-Cheol
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.2 no.3
    • /
    • pp.171-176
    • /
    • 2010
  • This paper proposes the application of sensor technology to assemble ship blocks efficiently. A sensor-based monitoring system is designed and implemented to improve shipbuilding productivity by reducing the labor cost for the adjustment of adequate positioning between ship blocks during pre-erection or erection stage. For the real-time remote monitoring of relative distances between two ship blocks, sensor nodes are applied to measure the distances between corresponding target points on the blocks. Highly precise positioning data can be transferred to a monitoring server via wireless network, and analyzed to support the decision making which needs to determine the next construction process; further adjustment or seam welding between the ship blocks. The developed system is expected to put to practical use, and increase the productivity during ship blocks assembly.

A Study on the Development of High Deposition Automatic Vertical Welding of Erection Stage in Shipbuilding (조선 탑재용접용 대입열 수직자동용접법의 개발에 관한 연구)

  • Park, Ju-Yong;Choe, Woo-Hyeon
    • Journal of Welding and Joining
    • /
    • v.26 no.5
    • /
    • pp.66-73
    • /
    • 2008
  • Welding work in pre-erection or erection stage of shipbuilding construction to be carried out in flat and vertical upward position mostly and Electrogas welding(EGW) is actively applied especially for vertical butt joint of thicker steel plate recently. In this study considered how to develope and improve mechanical properties of weld metal and HAZ in high heat input welding processes such as EGW and Electroslag welding(ESW) with its welding equipment in order to extend the application range to the longitudinal members and hatch coaming parts of container ship. Some components of welding system and parameters were modified to get the faster travel speed and reduce weld heat input, and also by adding additional filler rods or tubes increase the amount of deposited weld metal. With the test get some good date can apply to actual fabrication work and recommend items to manufacture welding materials make better. Above all things it's a fruition that to prepare the possibility of application of ESW to shipbuilding construction which fill up the gap of stoppage days of more than 20 years.

Shipyard Spatial Scheduling Solution using Genetic Algorithms

  • Yoon Duck Young;Ranjan Varghese
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2004.11a
    • /
    • pp.35-39
    • /
    • 2004
  • In a shipyard, there exist various critical decision making components pertaining to various production hindrances. The most prominent one is best-fit spatial arrangement for the minimal spatial occupancy with better pick-ability for the erection of the ship in the dock. During the present research, a concept have been conceived to evade the gap between the identification oj inter-relationships among a set of blocks to be included on a pre-erection area, and a detailed graphical layout of their positions, is called an Optimal Block Relationship Diagram A research has been performed on generation of optimal (or near Optimal) that is, with minimal scrap area. An effort has been made in the generation of optimal (or near-optimal) Optimal Block Relationship Diagram with the Goldberg's Genetic Algorithms with a representation and a set of operators are 'trained' specifically for this application. The expected result to date predicts very good solutions to test problems involving innumerable different blocks to place. The suggested algorithm could accept input from an erection sequence generator program which assists the user in defining the nature and strength of the relationships among blocks, and could produce input suitable for use in a detailed layout stage.

  • PDF

Development of Distortion Analysis Method for Multi-pass Butt-welding Based on Shell Element (다층 맞대기용접의 쉘 요소 기반 변형해석법 개발)

  • Ha, Yun-Sok;Yang, Jin-Hyuk
    • Journal of Welding and Joining
    • /
    • v.28 no.1
    • /
    • pp.54-59
    • /
    • 2010
  • Ship Blocks are assembled by welding, and among them, welding between large blocks (Pre-erection stage) is used as feature of butt. In this process, local material has a experience of thermal cycle and become finally shrunk. As for inconsistency of shrunk weldments and adjacent regions, ship structure would be deformed locally and globally. Thermal distortion analyses are done for control of these processes, and methodologies capable of ship block size among them are using 2-D shell element in FEM. A shell element takes charge of plate, so it has its thickness which is important for angular distortion by welding. By the way, a butt-welding consists normally of several passes, and weldment thickness are different at each pass. If a calculated final one-time welding shrinkage is acting on the shell element whose thickness is same as it of plate, then deformation value must be underestimated. This research developed a methodology that total deformation after multi-pass welding can be analyzed by one time at shell element having original thickness of its plate. We use the SDB thermal distortion analysis method and verified by several experiment. The both experimental and analysis results showed good agreements.

Decision Supporting Methodology and System Based on Theory of Constraints for Optimal Product Portfolio Strategy in Shipbuilding Industry (제약이론을 기반으로 한 최적제품조합 의사결정 지원 방법론 및 시스템)

  • Kim, In-Il;Han, Seong-Hwan;Kwon, Min-Chull
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.46 no.3
    • /
    • pp.362-371
    • /
    • 2009
  • Shipbuilding is a typical 'build to order' industry. It has a business model that generates revenues from building various ships and offshore products in accordance with owner's requirements at each production stage. Under uncertainty in shipping market, it is very essential for the shipbuilder to prepare the fast and competitive decision for product portfolio strategy in order to maximize contribution margin by exploiting production facilities and constraints. In this study, we introduce the unique decision supporting methodology for the optimal product portfolio sets based on Theory of Constraints(TOC). This methodology is established by adopting the concept of Drum Buffer Rope(DBR) in constraints planning and Throughput Accounting (TA) in management accounting of TOC. In addition, Decision Supporting System(DSS) is implemented. This DSS system provides a throughput estimator with reflecting the cost structure of shipbuilding industry and a resource simulator built on heuristic algorithms to operate major constraint-resources in shipyard such as dock, quay and pre-erection area etc. Several examples are presented to show that the proposed methodology and system can effectively support the strategic decision-making process of a global shipbuilding company.

On-Site Construction Method for U-Girder with Pre-tension and Verification of Analytical Performance of Anchoring Block (프리텐션 U형 거더 현장 제작 방법 및 정착 블록 해석적 성능 검증)

  • Park, Sangki;Kim, Jaehwan;Jung, Kyu-San;Seo, Dong-Woo;Park, Ki-Tae;Jang, Hyun-Ock
    • Journal of Korean Society of Disaster and Security
    • /
    • v.15 no.3
    • /
    • pp.67-77
    • /
    • 2022
  • In South Korea, U-type girder development was attempted as a means to increase the length of I-type girder, but due to the large self-weight according to the post-tension method, the application of rail bridges of 30m or less is typical. There are not many examples of application of pre-tension type girder. This study does not limit the post-tension method, but applies the pre-tension method to induce a reduction in self-weight and materials used due to the reduction of the cross-section. In addition, we intend to apply the on-site pre-tensioning method using the internal reaction arm of the U-type girder. The prestressed concrete U-type girder bridge is composed of a concrete deck slab and a composite section. Compared to the PSC I-type, which is an open cross-section because the cross section is closed, structural performance such as resistance and rigidity is improved, the safety of construction is increased during the manufacturing and erection stage, and the height ratio is reduced due to the reduction of its own weight. Therefore, it is possible to secure the aesthetic scenery and economical of the bridge. As a result, it is expected that efficient construction will be possible with high-quality factory-manufactured members and cast-in-place members. In this paper, the introduction of the pre-tension method on-site and the analytical performance verification of the anchoring block for tension are included.

Camber Reconstruction for a Prefab PSC Girder Using Collocated Strain Measurements (병치된 변형률 계측치를 이용한 프리팹 PSC 거더 캠버 재구성)

  • Kim, Hyun Young;Ko, Do Hyeon;Park, Hyun Woo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.2
    • /
    • pp.151-162
    • /
    • 2022
  • Prefab members have attracted attention because they can be mass-produced in factories through smart construction technology. For prefab prestressed concrete girders, it is important to manage the shapes of the girders properly from production to the pre-installation stage for consistency with the prefab floor plate during the erection process. This paper presents a camber reconstruction method using collocated strain measurements from the top and bottom of the prefab girder. In particular, the camber reconstruction method is applied to measured strain data in which the time-dependent behavior of concrete is considered after the introduction of prestress. Through Monte Carlo numerical simulations, the statistical accuracy of the reconstructed camber for a limited number of sensors, measurement errors, and nonlinear time-dependent behaviors are analyzed and validated.