• 제목/요약/키워드: Pre-bored pile

Search Result 14, Processing Time 0.031 seconds

Calculation of Base Load Capacity of Bored Pre-cast Piles Using New PHC PIles with Steel Pipe at Pile Toe (강관 부착 PHC파일로 시공된 매입말뚝의 선단지지력 산정)

  • Paik, Kyu-Ho
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.9
    • /
    • pp.5-16
    • /
    • 2016
  • New PHC piles, where short steel pipes are attached to the pile toe, are developed to increase the base load capacity of bored pre-cast piles embedded in weathered rock. In this study, new bored pre-cast piles using the new PHC piles are installed at 7 test sites with different soil conditions, and static and dynamic pile load tests are performed to investigate quantitative characteristics on the base load capacity of new bored pre-cast piles. In addition, based on the static pile load test results, a new empirical equation for estimating the base load capacity of new bored pre-cast piles is proposed. A comparison between predicted and measured base load capacities shows that the proposed empirical equation produces conservative predictions for the new bored pre-cast piles. However, the existing design criterion significantly underestimates the base load capacity of new bored pre-cast piles.

Development of Steel Pipe Attached PHC Piles for Increasing Base Load Capacity of Bored Pre-cast Piles (매입말뚝의 선단지지력 증대를 위한 강관 부착 PHC파일 개발)

  • Paik, Kyu-Ho;Yang, Hee-Jeong
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.8
    • /
    • pp.53-63
    • /
    • 2013
  • Bored pre-cast piles using PHC piles is widely used in foundation of building structures constructed in urban areas because noise and vibration due to pile installation are low. However, since slime is formed at the base of borehole and the density of bearing stratum surrounding the base of borehole is decreased due to stress relaxation in drilling process of bored pre-cast pile method, the base load capacity of bored pre-cast piles is very low compared to the strength of bearing stratum. In this study, a new type of PHC pile, which short steel pipe with the same diameter as the PHC pile is attached to the pile tip, is developed to increase the base load capacity of bored pre-cast piles. In order to check the effect of the use of new PHC pile on the base load capacity of bored pre-cast piles, field pile load tests are performed for bored pre-cast piles using the new and existing PHC piles. Results of the pile load tests show that the new PHC pile gives higher base load capacity to bored pre-cast piles than the existing PHC pile, since the tip of new PHC pile is penetrated to undisturbed bearing stratum passing through the slime at the base of borehole and the loosened bearing stratum under the slime by pile driving using light hammer.

A Comparative Study of Skin Frictional Force through a Laboratory Model Test of Pile Filling Materials with Utilizing Circulating Resources (순환자원 활용 말뚝채움재의 실내모형시험을 통한 주면마찰력 비교 연구)

  • Song, Sang-Hwon;Jeong, Young-Soon;Seo, Se-Gwan
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.23 no.3
    • /
    • pp.1-8
    • /
    • 2021
  • Rural multi-purpose buildings needs to ensure their safety against various disasters. Therefore, a pile foundation, which is a foundation type that can transmit the load of the structure to the bedrock layer, has been designed. The pile foundation method is largely divided into driving piles method and pre-bored pile method. Recently, in order to respond to the Noise and Vibration Control Act and related environmental complaints, construction of pile foundation adopts pre-bored pile method. The bearing capacity of the pre-bored pile method is calculated through a load test in situ. However, a disadvantage stems in that it is difficult to measure the ultimate bearing capacity due to field conditions. Therefore, in this study, the skin frictional force of pre-bored pile was measured through a model test in laboratory for each pile filling material. In result, the pile filling material with using circulating resources shows superior skin frictional force than ordinary portland cement. This study also judged that the result can be applied in place of ordinary Portland cement in the field.

Feasibility Appraisal and Proposal of a Pile Driving Formula for Domestic Pre-bored Pile Management (국내 매입 말뚝 관리를 위한 항타공식 활용 가능성 평가 및 제안에 관한 연구)

  • Kim, Gunwoong;Seo, Seunghwan;Kim, Juhyong;Chung, Moonkyung
    • Journal of the Korean Geotechnical Society
    • /
    • v.39 no.11
    • /
    • pp.71-84
    • /
    • 2023
  • In accordance with Korean structural foundation design standards, dynamic or static load tests are mandated for 1 to 3% of total piles. The construction quality of the remaining 97% to 99% of piles is determined through penetration measurements. This study aims to enhance the quality control of the majority of piles by adopting a pile driving formula that considers both penetration and hammer energy. The current challenge lies in adapting existing overseas driving formulas to the domestic site conditions, characterized by shallow weathered or soft rocks, and the prevalent use of pre-bored piles. To address this, the Modified Gates formula was refined using domestic dynamic load data, thereby improving its applicability to pile management. Despite employing fewer variables, the proposed formula demonstrates a comparable accuracy to dynamic loading tests in predicting the bearing capacity of pre-bored piles. Consequently, this formula holds promise for practical use in future pile quality management.

Prediction of End Bearing Capacity for Pre-Bored Steel Pipe Piles Using Instrumented Spt Rods (SPT 에너지효율 측정 롯드를 이용한 매입말뚝의 선단지지력 예측)

  • Nam, Moon S.;Park, Young-Ho;Park, Yong-Seok
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.12
    • /
    • pp.105-111
    • /
    • 2013
  • The standard penetration test (SPT) has been widely used because of its usability, economy, and many correlations with soil properties among other factors. In SPT, hammer energy is an important factor to evaluate and calibrate N values. To measure hammer energy, an instrumented SPT rod was developed considering that stress waves transferring on rods during SPT driving are the same as stress waves transferring on piles due to pile driving. Using this idea, an instrumented SPT rod with a pile driving analyzer was applied as a pile capacity prediction tool in this study. In order to evaluate this method, SPT and dynamic cone tests with the instrumented SPT rod were conducted and also 2 pile load tests were performed on pre-bored steel pipe piles at the same test site. End bearings were predicted by CAPWAP analysis on force and velocity waves from dynamic cone penetration tests and SPT. Comparing these predicted end bearings with static pile load tests, a new prediction method of the end bearing capacity using the instrumented SPT rod was proposed.

Analysis of Bearing Capacity of Rock Socketed Pre-Bored Super Strength Piles Based on Dynamic Load Test Results (동재하시험을 통한 선단이 암반에 근입된 초고강도 매입 PHC 말뚝의 지지력 특성 분석)

  • Kim, Rakhyun;Kim, Dongwook
    • Journal of the Korean Geosynthetics Society
    • /
    • v.18 no.3
    • /
    • pp.89-100
    • /
    • 2019
  • The purpose of this study is to analyze the characteristics of bearing capacity of pre-bored super strength PHC (SSPHC) piles socketed in rocks based on dynamic load test results. Because the SSPHC piles have high compressive concrete strengths compared with those of regular high strength PHC piles, the allowable structural strengths of the SSPHC piles were increased. For optimal design of the super strength PHC piles, the geotechnical bearing capacity of the SSPHC piles should also increased to balance the increased allowable structural strength of the SSPHC piles. Current practices of pile installation apply the same amount of driving energy on both SSPHC and high strength PHC piles. As results of analyzing factors that influence bearing strength of SSPHC piles using dynamic load test, there was no relationship between SPT-N value at pile toe and end bearing capacity. But driving energy effects on end bearing capacity. In case of skin friction, driving energy had no effects. And reasonable method verifying design bearing strength is necessary because end bearing capacity is not considered sufficiently in restrike test results.

Study on the Evaluation of End Bearing Capacity of Pre-Bored Piles for the SPT-N value (SPT-N값에 따른 매입말뚝의 선단지지력 특성 연구)

  • Seo, Dong-Nam;Choi, Sang-Ho;Kim, Jin-Sik;Kim, Seong-Cheol;Lee, Dong-Hyeon;Cho, Seong-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.133-134
    • /
    • 2020
  • The equation of end bearing capacity is applied differently depending on the type of pile, construction method, and load characteristics considering the construction standards. The bearing capacity equation of the design standard is presented in various ways according to the design conditions such as construction method and ground condition, etc. but, It does not reflect the ground strength according to the SPT-N value of weathered rock. This study analyzed the trend of allowable tip bearing capacity by pile diameter through about 480 dynamic loading tests conducted for the construction/quality management of piles for the last 6 years since 2015. The equation for the ultimate end bearing capacity per unit area according to the SPT-N value is presented. The proposed formula of ultimate end bearing capacity per unit area can be applied in the range of 15,000kN/m2 to 30,000kN/m2. The proposed formula, which complements the existing formula, enables pile design and construction/quality management.

  • PDF

KEC Construction and Design of Auger-drilled Piles (한국도로공사의 매입말뚝 공법의 설계와 시공)

  • Park, Young-Ho;Nam, Moon-S.;Kim, Nak-Young;Yook, Jeong-Hoon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.521-532
    • /
    • 2008
  • The SIP method developed by low noise-vibration from Japan is appropriate to the construction at urban area. However, this method has been misused as a pre-driiled driven pile method in Korea. Hence, Korea Expressway Corporation proposed 'Design & Construction Guideline for the SIP Method' following the original concept of the SIP method at 2004 and 2006. Also construction guideline of another auger-drilled piles were introduced.

  • PDF

Study on the Fractures Types of PHC Pile by Impact Load of Follower (보조말뚝의 충격하중에 의한 PHC말뚝의 파손유형 고찰)

  • Seo, Dong-Nam;Choi, Sang-Ho;Kim, Jin-Sik;Kim, Min-Kab;Lee, Dong-Hyeon;Cho, Seong-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.144-145
    • /
    • 2021
  • This study analyzed the cases of cracks in piles due to the use of followers under construction conditions where water exists inside the piles, and confirmed whether the piles were cracked through a field test simulating the construction conditions in which water pressure inside the piles was generated by a hammer. According to the construction case, under the construction condition where the pile length is 20% to 30% shorter than the drilled length, about 80% cracks occur, so there is a high possibility of cracking due to water inside the pile. A field test was conducted to confirm the type of pile failure due to hammer under the construction condition in which water exists inside the pile. The pile head was not destroyed by the compressive load, and one or more longitudinal cracks occurred along the PC steel wire. The closed end pile generates water pressure by hammer. the follower and cushion(compression plywood) must be drilled at least 0.4D. It is expected that improved quality control will be possible as the water pressure inside the pile is reduced.

  • PDF

Field investigation and numerical study of ground movement due to pipe pile wall installation in reclaimed land

  • Hu Lu;Rui-Wang Yu;Chao Shi;Wei-Wei Pei
    • Geomechanics and Engineering
    • /
    • v.34 no.4
    • /
    • pp.397-408
    • /
    • 2023
  • Pipe pile walls are commonly used as retaining structures for excavation projects, particularly in densely populated coastal cities such as Hong Kong. Pipe pile walls are preferred in reclaimed land due to their cost-effectiveness and convenience for installation. However, the pre-bored piling techniques used to install pipe piles can cause significant ground disturbance, posing risks to nearby sensitive structures. This study reports a well-documented case history in a reclamation site, and it was found that pipe piling could induce ground settlement of up to 100 mm. Statutory design submissions in Hong Kong typically specify a ground settlement alarm level of 10 mm, which is significantly lower than the actual settlement observed in this study. In addition, lateral soil movement of approximately 70 mm was detected in the marine deposit. The lateral soil displacement in the marine deposit was found to be up to 3.4 and 3.1 times that of sand fill and CDG, respectively, mainly due to the relatively low stiffness of the marine deposit. Based on the monitoring data and site-investigation data, a 3D numerical analysis was established to back-analyze soil movements due to the installation of the pipe pile wall. The comparison between measured and computed results indicates that the equivalent ground loss ratio is 20%, 40%, and 20% for the fill, marine deposit and CDG, respectively. The maximum ground settlement increases with an increase in the ground loss ratio of the marine deposit, whereas the associated influence radius remains stationary at 1.2 times the pipe pile wall depth (H). The maximum ground settlement increases rapidly when the thickness of marine deposit is less than 0.32H, particularly for the ground loss ratio of larger than 40%. This study provides new insights into the pipe piling construction in reclamation sites.