• Title/Summary/Keyword: Pre-Qualification

Search Result 82, Processing Time 0.028 seconds

A Comparative Analysis on Safety Evaluation System and Requirement in the Tendering Process of Public Construction Projects - Cases of Singapore and Japan - (공공공사의 입찰과정에서 안전평가체계와 요건의 비교분석 - 싱가포르, 일본 사례를 중심으로 -)

  • Park, Hee-Taek;Oh, Chi-Don;Park, Chan-Sik;Choi, Jin-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.130-139
    • /
    • 2013
  • Construction accident rates are reflected in the pre-qualification of public construction projects in order to prevent accidents and facilitate the safety management of construction companies. However, the construction industry is still experiencing an increase in accident rates. Hence, there is a need to strengthen existing safety evaluation systems and requirements in public construction tendering. The objective of this study was to acquire and provide basic data for benchmarking to select tenderers in domestic public construction projects. In Singapore and Japan, safety evaluation systems and requirements are applied based on various aspects in order to screen tenderers. These evaluation systems include safety regulations and institutional requirements, as well as safety performance and safety management plans of respective construction projects. This study recommends that korean public construction projects also apply similar safety evaluation systems which include comprehensive safety criteria in order to decrease accident rates in the industry.

The Development of a Standardized Work Process for Planning of Plant Project - Focus on Excavating and Investing Participation Plan - (플랜트 프로젝트 사업기획단계 표준 업무 프로세스 개발 - 사업발굴 및 사업참여 결정을 중심으로 -)

  • Lee, Do-yun;Choi, Chang-Hoon;Won, Seo-kyung;Cho, Moon-Young;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.3-11
    • /
    • 2016
  • Recently, overseas plant orders of domestic enterprises are steadily increased, and the amount of orders in the first half of 2014 were 93% increased compared to the previous year. In addition, now which is the third quarter of 2015, overseas plant orders are already over 249.8 billion dollars so the interests of plant industry research has been increased. In the life cycle of the plant project, CM before the construction stage is to complement the uncertainties that are inherent in the early stages of the project, and from the viewpoint of supporting the rational decision-making, the importance of its role is on the rise. Among them, excavating and investing participation plan in the planning stage is an important work that has a large impact force to influence the success and failure of future project. However, the work has become a problem with frequent consultations due to decision-making, continuous modification, and inefficient repetitive tasks. Therefore, it is needed that work process should be changed to effectively accommodate. The purpose of this paper is to derive the major work items for excavating and investing participation plan in the planning stage of the plant project, and establish a standardized work process through the Delphi analysis. The result of this study is expected to be utilized for EPC companies in ensuring the technical competitiveness in planning on overseas markets, and improve the efficiency of work.

A Study of Improvement on Accident Rate Index of Construction Industry (건설업 산업재해발생율 평가지표 개선방안)

  • Lee, Miyoung;Oh, Sewook;Lim, Sejong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.108-119
    • /
    • 2016
  • Since the introduction of the converted accident rate in Pre-Qualification(PQ) process in 1992, the safety evaluation system has contributed to a reduction of construction accidents and development of the safety management system in public construction projects. As the comprehensive evaluation method the government plans to introduce includes the indicators 'accident rate' and 'death rate per 10,000 workers', the influences on the safety evaluation in the bidding process would be broader in public sector construction projects. However, the current safety evaluation system is operated by different estimating standards in the bidding process. At this point, a study of improvement on the safety evaluation index is required to review its current conditions and to propose its efficient operating method. Therefore, the purpose of this study is to analyze problems of the current safety evaluation system through the questionnaire survey on the qualified workers in construction safety management and to propose an improvement plan for the problems noticed. Our results suggest the standards of the unified process for the safety evaluation index, the size of construction firms needed for accident rate estimation, and the improvement plan for unreported accidents. The proposed improvement plan enables the reasonable estimation and efficient operation of the safety evaluation index, and further, it would contribute to reducing construction accidents through the activation of voluntary safety management by construction firms.

A Analytical Study on Governmental Regulation for the Promotion of Construction Technology Development (건설기술개발 촉진과 연계된 제도분석 연구 - PQ 기술개발평가항목과 특허출원추이와의 비교분석을 중심으로 -)

  • Kim, Jae-Wook;Kim, Sang-Bum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.140-153
    • /
    • 2008
  • The recent stagnation of construction market draw more attention to construction technology development which is believed to be playing a important role in increasing the competitiveness of the construction industry. Thus, increasing pressures has been on the government playing a catalytic role of strengthen technology competitiveness. Hereupon, this study analyzed technology skill evaluation items of the Pre-Qualification system to facilitate construction technology development at the national level and tried to show the correlation between the PQ system and patent application through multilateral analysis of patent applications. Analysis results are intended to provide basic reference in decision-making process related to governmental regulation improvement especially on the PQ system. This research also attempted to draw implications to increase the use of technology related regulations such as patent & utility model based on PQ system analysis results. To do so, a comprehensive trend Analysis on the PQ system has been conducted from the view points of construction technology. Similar analysis has been done with the patent system & Utility model system. Based on Analysis result, implications of regulation improvements was outlined to promote construction technology development, due to eventually increase the competitiveness of Korean construction industry.

A Comparative Study of the Vocational Education Training in Germany, Switzerland and Austria (독어권 국가의 도제훈련제도 비교연구)

  • Choi, Sujung;Bae, Suhyun;Jeong, SeongJi
    • Journal of vocational education research
    • /
    • v.35 no.6
    • /
    • pp.113-141
    • /
    • 2016
  • The apprenticeship training is given as a solution of the youth unemployment problem. The apprenticeship is a system that companies hire and instruct trainees and is implemented in various countries. In Korea, there is a Korean work-learning dual system which is managed by the government rather than the company itself. This Study analyzed Germany, Switzerland and Austria's apprenticeship training system and compared common factors of apprenticeship system, a trainer in company and cost-benefit analysis. The result of the study can be shown as follows. First, Germany operates practical training, meanwhile Switzerland and Austria provide a pre-education course before students enter the upper-secondary VET course. Second, Germany and Switzerland give a single type apprenticeship training, whereas Austria runs a modularization system, which enables students to specify their skills and improves clarity. Third, social partners as well as the government, states, companies/schools actively participate in apprenticeship. Fourth, there is a suitable trainer's qualification system in all countries. Finally, Germany and Austria's companies cause larger cost than benefit in apprenticeship. On the other hand, Switzerland gets larger net-benefit than cost. We can give implications to the Korean work-learning dual system based on this study.

A Case Study of Improving Instruction by Utilizing Online Instruction Diagnosis Item Pool

  • SHIM, Mi-Ja
    • Educational Technology International
    • /
    • v.6 no.2
    • /
    • pp.23-41
    • /
    • 2005
  • One of the main factors that determine the quality of instruction is the teaching ability of the instructor administering the class. To evaluate teaching ability, methods such as peer review, student feedback, and teaching portfolio can be used. Among these, because feedback from the students is directly associated with how well the students feel they have learned, it is essential to improving instruction and teaching ability. The principal aim of instruction evaluation lies in the evaluation of instructor's qualification and the improvement of instruction quality by enhancing professionalism. However, the mandatory instruction evaluations currently being carried out at the term's end in universities today have limitations in improving instruction in terms of its evaluation items and times. To improve the quality of instruction and raise teaching abilities, instruction evaluations should not stop at simply being carried out but also be utilized as useful data for students and teachers. In other words, they need to be used to develop teaching and improve instruction for teachers, and consequently, should also exert a positive influence on students' scholastic achievements and learning ability. The most important thing in evaluation is the acquisition of accurate information and how to utilize it to improve instruction. The online instruction diagnosis item pool is a more realistic feedback device developed to improve instruction quality. The instruction diagnosis item pool is a cafeteria-like collection of hundreds of feedback questions provided to enable instructors to diagnose their instruction through self-diagnosis or students' feedback, and the instructors can directly select the questions that are appropriate to the special characteristics of their instruction voluntarily make use of them whenever they are needed. The current study, in order to find out if the online instruction diagnosis item pool is truly useful in reforming and improving instruction, conducted pre and post tests using 256 undergraduate students from Y university as subjects, and studied the effects of student feedback on instructions. Results showed that the implementation of instruction diagnosis improved students' responsibility regarding their classes, and students had positive opinions regarding the usefulness of online instruction diagnosis item pool in instruction evaluation. Also, after instruction diagnosis, analyzing the results through consultations with education development specialists, and then establishing and carrying out instruction reforms were shown to be more effective. In order to utilize the instruction diagnostic system more effectively, from planning the execution of instruction diagnosis to analyzing the results, consulting, and deciding how those results could be utilized to instruction, a systematic strategy is needed. In addition, professors and students need to develop a more active sense of ownership in order to elevate the level of their instruction.

Recognition and Request for Medical Direction by 119 Emergency Medical Technicians (119 구급대원들이 지각하는 의료지도의 필요성 인식과 요구도)

  • Park, Joo-Ho
    • The Korean Journal of Emergency Medical Services
    • /
    • v.15 no.3
    • /
    • pp.31-44
    • /
    • 2011
  • Purpose : The purpose of emergency medical services(EMS) is to save human lives and assure the completeness of the body in emergency situations. Those who have been qualified on medical practice to perform such treatment as there is the risk of human life and possibility of major physical and mental injuries that could result from the urgency of time and invasiveness inflicted upon the body. In the emergency medical activities, 119 emergency medical technicians mainly perform the task but they are not able to perform such task independently and they are mandatory to receive medical direction. The purpose of this study is to examine the recognition and request for medical direction by 119 emergency medical technicians in order to provide basic information on the development of medical direction program suitable to the characteristics of EMS as well as for the studies on EMS for the sake of efficient operation of pre-hospital EMS. Method : Questionnaire via e-mail was conducted during July 1-31, 2010 for 675 participants who are emergency medical technicians, nurses and other emergency crews in Gyeongbuk. The effective 171 responses were used for the final analysis. In regards to the emergency medical technicians' scope of responsibilities defined in Attached Form 14, Enforcement regulations of EMS, t-test analysis was conducted by using the means and standard deviation of the level of request for medical direction on the scope of responsibilities of Level 1 & Level 2 emergency medical technicians as the scale of medical direction request. The general characteristics, experience result, the reason for necessity, emergency medical technicians & medical director request level, medical direction method, the place of work of the medical director, feedback content and improvement plan request level were analyzed through frequency and percentage. The level of experience in medical direction and necessity were analyzed through ${\chi}^2$ test. Results : In regards to the medical direction experience per qualification, the experience was the highest with 53.3% for Level 1 emergency medical technicians and 80.3% responded that experience was helpful. As for the recognition on the necessity of medical direction, 71.3% responded as "necessary" and it turned out to be the highest of 76.9% in nurses. As for the reason for responding "necessary", the reason for reducing the risk and side-effects from EMS for patients was the largest(75.4%), and the reason of EMS delay due to the request of medical direction was the highest(71.4%) for the reason for responding "not necessary". In regards to the request level of the task scope of emergency medical technicians, injection of certain amount of solution during a state of shock was the highest($3.10{\pm}.96$) for Level 1 emergency rescuers, and the endotracheal intubation was the highest($3.12{\pm}1.03$) for nurses, and the sublingual administration of nitroglycerine(NTG) during chest pain was the highest($2.62{\pm}1.02$) for Level 2 emergency medical technicians, and regulation of heartbeat using AED was the highest($2.76{\pm}.99$) for other emergency crews. For the revitalization of medical direction, the improvement in the capability of EMS(78.9%) was requested from emergency crew, and the ability to evaluate the medical state of patient was the highest(80.1%) in the level of request for medical director. The prehospital and direct medical direction was the highest(60.8%) for medical direction method, and the emergency medical facility was the highest(52.0%) for the placement of medical director, and the evaluation of appropriateness of EMS was the highest(66.1%) for the feedback content, and the reinforcement of emergency crew(emergency medical technicians) personnel was the highest(69.0%) for the improvement plan. Conclusion : The medical direction is an important policy in the prehospital EMS activity because 119 emergency medical technicians agreed the necessity of medical direction and over 80% of those who experienced medical direction said it was helpful. In addition, the simulation training program using algorithm and case study through feedback are necessary in order to enhance the technical capability of ambulance teams on the item of professional EMS with high level of request in the task scope of emergency medical technicians, and recognition of medical direction is the essence of the EMS field. In regards to revitalizing medical direction, the improvement of the task performance capability of 119 emergency medical technicians and medical directors, reinforcement of emergency medical activity personnel, assurance of trust between emergency medical technicians and the emergency physician, and search for professional operation plan of medical direction center are needed to expand the direct medical direction method for possible treatment beforehand through the participation by medical director even at the step in which emergency situation report is received.

Analysis on Procurement Auction System in Public Procurement Service (공공투자사업의 입·낙찰 분석)

  • Kim, Jungwook
    • KDI Journal of Economic Policy
    • /
    • v.32 no.2
    • /
    • pp.144-170
    • /
    • 2010
  • This paper considers the effect of various types of procurement auction system on competition focusing on the rate of successful bidding. We analyze the number of bidders and the rate of successful bids using online procurement data of the Public Procurement Service. The average number of bidders is 301 and the average rate of successful bids is 87.42% while the weighted average rate is 75.13%. These numbers show that there is quite strong competition among bidders and the rate is lower as the expected price is higher. When we analyze the data of price procurement auction, the rate is also shown to be lower as the expected price is higher. Furthermore, the rate decreases as the number of bidders increases which naturally makes the competition stronger. Meanwhile, the analysis finds that the inclusion of the onsite bidding, the PQ(Pre-Qualification) result, or major-10 winning companies cannot explain the rate much in our data. In case of turnkey-alternative, the average rate of successful bidding for 484 cases record 90.20%. The average is 84.89% with 120 alternatives and 91.97% with 364 cases of turnkey. The reason why the rate of turnkey-alternative is lower than that of price procurement auction is the lack of competition as well as the systematic difference. By setting up a model, we are able to explain the difference in rate caused by the respective reason. When we suppose there are 3 bidders in case of price procurement auction for a project that exceeds 100 billion won, the rate is expected to be around 64%. This implies that difference of 26% is caused by the systemic difference and 3% by the lack of competition. Therefore, we conclude that the difference in rate between turnkey-alternative and price procurement auction is caused mainly by the systemic difference. In case of PPP(Public Private Partnership) projects, among 154 projects in total, only 40% has more than 2 bidders that compete. The average number of bidders is 1.88 which is less than 2, and the average rate of successful bids is 90%. In sum, under the price procurement auction, there is strong competition which is reflected by the rate of successful bids. However, there is room to decrease the rate by strengthening the competition under the turnkey-alternative. Also with PPP projects, we expect the rate can be steadily reduced with revived competition among bidders.

  • PDF

A Study on the Treatment of Toxic Chemicals of Maritime University Cadets (해양계대학교 실습해기사들의 유해화학물질 취급에 관한 연구)

  • Im, Myeong-Hwan;Sin, Ho-Sig;Kim, Hong-Ryeol;Lim, Geung-Su
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.19 no.1
    • /
    • pp.31-36
    • /
    • 2013
  • Maritime University cadets must be on board ship's after thoroughly completing a Basic Safety Training Course. During their spare semester they must complete basic principle of the course and then, attend to both Advanced Safety Training Course and Tankers Training Course before they graduate. However, all cadets are exposed to risks during their onboard training. It means that most of commercial ships have to train them before boarding and perform duties according to all sorts of check lists based on the ISM. Accordingly, this research will deal with the treatment for toxic chemicals which is not fully covered by shipping firms, vessels and even a Maritime University for cadets. The lack of pre-knowledge about it is considerably hazardous to the cadets who have no onboard experience. As stated above, the majority of the onboard cadets board their ships without previous training on treatment and knowledge for toxic chemicals. As a result, there are some cases that cadets are injured due to the lack of knowledge to treat toxic chemicals and due to carelessness. Furthermore, they end up leaving a ship prematurely. To prevent these incidents from occurring, this paper recommends thorough training before going onboard provided by Maritime University, the systematic database on the safety of the toxic chemicals and the development of the online contents for safety education of toxic chemicals fitted on each ship's types are necessary to avoid risks and accidents onboard. Furthermore, it is suggested that shipping companies should manage the ship according to the safety check list on toxic chemicals and the crew in charge with qualification for the treatment of toxic chemicals should provide a safety education and supervision.

Applying Meta-model Formalization of Part-Whole Relationship to UML: Experiment on Classification of Aggregation and Composition (UML의 부분-전체 관계에 대한 메타모델 형식화 이론의 적용: 집합연관 및 복합연관 판별 실험)

  • Kim, Taekyung
    • Journal of Intelligence and Information Systems
    • /
    • v.21 no.1
    • /
    • pp.99-118
    • /
    • 2015
  • Object-oriented programming languages have been widely selected for developing modern information systems. The use of concepts relating to object-oriented (OO, in short) programming has reduced efforts of reusing pre-existing codes, and the OO concepts have been proved to be a useful in interpreting system requirements. In line with this, we have witnessed that a modern conceptual modeling approach supports features of object-oriented programming. Unified Modeling Language or UML becomes one of de-facto standards for information system designers since the language provides a set of visual diagrams, comprehensive frameworks and flexible expressions. In a modeling process, UML users need to consider relationships between classes. Based on an explicit and clear representation of classes, the conceptual model from UML garners necessarily attributes and methods for guiding software engineers. Especially, identifying an association between a class of part and a class of whole is included in the standard grammar of UML. The representation of part-whole relationship is natural in a real world domain since many physical objects are perceived as part-whole relationship. In addition, even abstract concepts such as roles are easily identified by part-whole perception. It seems that a representation of part-whole in UML is reasonable and useful. However, it should be admitted that the use of UML is limited due to the lack of practical guidelines on how to identify a part-whole relationship and how to classify it into an aggregate- or a composite-association. Research efforts on developing the procedure knowledge is meaningful and timely in that misleading perception to part-whole relationship is hard to be filtered out in an initial conceptual modeling thus resulting in deterioration of system usability. The current method on identifying and classifying part-whole relationships is mainly counting on linguistic expression. This simple approach is rooted in the idea that a phrase of representing has-a constructs a par-whole perception between objects. If the relationship is strong, the association is classified as a composite association of part-whole relationship. In other cases, the relationship is an aggregate association. Admittedly, linguistic expressions contain clues for part-whole relationships; therefore, the approach is reasonable and cost-effective in general. Nevertheless, it does not cover concerns on accuracy and theoretical legitimacy. Research efforts on developing guidelines for part-whole identification and classification has not been accumulated sufficient achievements to solve this issue. The purpose of this study is to provide step-by-step guidelines for identifying and classifying part-whole relationships in the context of UML use. Based on the theoretical work on Meta-model Formalization, self-check forms that help conceptual modelers work on part-whole classes are developed. To evaluate the performance of suggested idea, an experiment approach was adopted. The findings show that UML users obtain better results with the guidelines based on Meta-model Formalization compared to a natural language classification scheme conventionally recommended by UML theorists. This study contributed to the stream of research effort about part-whole relationships by extending applicability of Meta-model Formalization. Compared to traditional approaches that target to establish criterion for evaluating a result of conceptual modeling, this study expands the scope to a process of modeling. Traditional theories on evaluation of part-whole relationship in the context of conceptual modeling aim to rule out incomplete or wrong representations. It is posed that qualification is still important; but, the lack of consideration on providing a practical alternative may reduce appropriateness of posterior inspection for modelers who want to reduce errors or misperceptions about part-whole identification and classification. The findings of this study can be further developed by introducing more comprehensive variables and real-world settings. In addition, it is highly recommended to replicate and extend the suggested idea of utilizing Meta-model formalization by creating different alternative forms of guidelines including plugins for integrated development environments.