• Title/Summary/Keyword: Pre-Load

Search Result 704, Processing Time 0.03 seconds

FEM Analysis of the Spline Joint with Bolt Pre-load (스플라인결합 조인트의 볼트 예하중에 대한 유한요소 해석)

  • Tak, Seung-Min;Kang, Min-Kyu;Park, Dong-Jin;Lee, Seok-Soon
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.28 no.11
    • /
    • pp.1316-1322
    • /
    • 2011
  • Most of the mechanical structures use bolting or spot welding for the whole structure. In recent years, bolting & rivets are used rather than the welding due to reassembly and repair. Analysis of bolted joints is so complicate that many conditions must be considered such as pre-load and contact, etc.. Bolted joint analysis is done by theoretical, experimental & numerical methods. However, numerical analysis in the bolted joint is used because the contact and stress in the joints are changed due to the pre-load. In this study, we analysis the slip and the deformation of the contact area in the joint depending on the pre-load and find the optimized bolting condition.

The effect of pre-load and fatigue life for one-level pedicle screw system (단분절 척추경 나사못의 피로수명과 Pre-Load의 영향)

  • 김병일;이효재;송정일
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.1298-1301
    • /
    • 2003
  • The purpose of this research is to evaluate the effect of pre-load and fatigue life of the distracted one-level pedicle screw system. A spring, which acted as a substitute of the ligament, was installed in the one-level pedicle screw system before testing. The static and fatigue properties are now being tested, which includes 6mm rod to 6mm screw, 6mm rod to 6.5mm screw and 6.35mm rod to 6.5mm screw, under pre-load. Until now as test data were analyzed, 6mm rod to 6.5mm screw was found to have the best performances of stillness and fatigue lift, while 6mm rod to 6mm screw showed the shortest fatigue life. If the stiffness of screw was bigger than that of rod. the fatigue life was prolonged. The fatigue life of the distracted pedicle screw was proved to be shorter than that of the one-level pedicle screw system. So the fatigue life was shortened because of the effect of the spring on the flexibility and stiffness of the rod. In order to obtain the stability of the pedicle screw, more tests are under doing on this topic.

  • PDF

Behavior of Tunnel Due to Adjacent Ground Excavation with Pre-loading on Braced Wall (근접 굴착시 흙막이벽 버팀대 선행하중 재하에 따른 터널의 거동)

  • Kim, Il;Lee, Sang-Duk
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.10
    • /
    • pp.163-174
    • /
    • 2007
  • A New pre-loading system, through which a large pre-load could be charged was developed and applied to the braced wall in order to stabilize the adjacent tunnel. A pre-load larger than the designated axial force of bracing was imposed to prevent the horizontal displacement of the braced wall during the ground excavation. For this purpose, real scale model tests (1/10) were conducted, without and with pre-load on braced wall. And numerical analyses were performed for both the cases without and with pre-load, which were half (50%) and full (100%) respectively, and larger scale of the design axial farce of bracing. FEM program called PLAXIS was used for numerical analysis. As a result, it was found that the stability of the existing tunnel adjacent to the braced wall could be greatly enhanced when the horizontal displacement of braced wall was reduced by applying a pre-load, which was larger than the designated axial force of bracing.

Study on a loading mechanism for fixed ratio traction drives (고정 감속비트랙션 드라이브의 압부력 발생장치에 대한 연구)

  • Kim, Sung-Yeol;Kim, Bae-Jin;Park, Dae-Hyun;Oh, Se-Hoon
    • Proceedings of the KSME Conference
    • /
    • 2003.04a
    • /
    • pp.1212-1218
    • /
    • 2003
  • A novel loading mechanism of wedge roller type has been developed. This type traction drive has long system life and high efficiency by changing the pre-load on a contact point. And this loading mechanism does not need precision machining. So it has, as opposed to the conventional loading mechanism, an advantage in saving manufacturing cost. In this paper, by analyzing pre-load generating mechanism, spring pre-load and the roller size are defined and the stress on the contact point by pre-load is calculated. On the basis of this analysis, the model of wedge roller type traction drive for the test is made and was carried out its performance test. It can transmit input torque up to 1.5 N m, with high efficiency over 91% up to 98%, with slip rate under 2.5%.

  • PDF

Impact Characteristics of Glass Fiber Reinforced Composite Curved Beams w.r.t. Pre-load (예 하중이 유리섬유 복합재료 곡선 보의 충격특성에 미치는 영향)

  • Lee, Seung-Min;Lim, Tae-Seong;Lee, Dai-Gil
    • Proceedings of the KSME Conference
    • /
    • 2004.04a
    • /
    • pp.162-167
    • /
    • 2004
  • The low velocity impact characteristics of composite laminate curved beams are investigated to increase damage tolerance and reduce the deflection. Drop weight impact tests of the composite curved beam were performed with respect to pre-load, then the damage after impact was measured by macrography. Also, finite element analyses were performed using ABAQUS to investigate the stress state of composite curved beam with respect to pre-load and impact. From the investigation, it was found that pre-load of the composite curved beams had much influence on impact damage of the curved beam, which showed good agreement with the experiment results.

  • PDF

Structural Analysis for Thread Joint Part of Rocket Motor Case Applied Pre-load (초기하중을 받는 로켓모타 케이스 나사체결부의 구조해석)

  • Koo, Song-Hoe;Cho, Won-Man;Lee, Bang-Eop
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.10 no.1
    • /
    • pp.144-149
    • /
    • 2007
  • Behaviour of a thread joint of a rocket motor case show complex structural characteristics. Pre-torque must be applied to the threads to prevent the loosening of the interface from the additional pressure load. During the pressurization of the rocket motor case, the jointing face may be opened if the pre-torque were not set properly or the structure may be failed if the local concentrated stress exceeds the strength of the material. In this paper, the structural behaviour of a thread joint of a rocket motor case were analyzed by the finite element method and the results were compared to the experimental ones. A method to set a pre-torque for a thread joint were proposed to ensure the structural safety.

Stress Corrosion Cracking in the Pre-Cracked Specimens of Type 403 Stainless Steel

  • Kim, Jong Jip
    • Corrosion Science and Technology
    • /
    • v.3 no.1
    • /
    • pp.14-19
    • /
    • 2004
  • Crack growth rate and threshold stress intensity factor for stress corrosion cracking(SCC), $K_{ISCC}$ were measured for type 403 stainless steel in 3,5% NaCl solution at room temperature and SCC was monitored by electrochemical noise technique during $K_{ISCC}$ testing. In rising load test, pits were formed at the tip of pre-crack for the pre-cracked compact tension specimen unlike in smooth round specimen in which only unstable pits were observed and hence immune to SCC. Micro-cracks were found to initiate from the pits in the former specimen, and initiation of micro-crack as well as macro-crack was detected by electrochemical noise technique in rising load $K_{ISCC}$ tests. Crack growth rate increased with increasing either displacement rate or stress intensity factor at crack initiation and was higher in rising load $K_{ISCC}$ test compared to constant load $K_{ISCC}$ test at given stress intensities.

Development of High Load/Large Displacement Actuator for Micro-press (마이크로 프레스용 고하중/대변위 액츄에이터 개발)

  • KIM B. H.;NAM K. S.;CHOI J. P.;KIM H. Y.;LEE N. K.
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 2005.05a
    • /
    • pp.458-461
    • /
    • 2005
  • In this paper, a new type of inchworm motion actuator is developed in fabrication of actuators for micro-press machine. This is consisted of three piezoelectric actuators, one is for moving the tool guide and the other are for clamping the guide. The inchworm motor provides both high load and large displacement in small size actuator. PZT has compressive strength and often fails under tensile stress and pulling. Thus, in order to prevent failure, we have designed pre-load housing and accomplished FEM analysis. The pre-load housing was used for determining the optimal design condition by comparing the von-mises stresses with the change of hinge stiffness. Also, in order to predict the performance of the motor under certain conditions, the system model was simulated using MATLAB. This is open loop control actuator and driven by the period of input voltage.

  • PDF

The Effect of a Compressive Follower Pre-load on the Ligament of Lumbar Spine and the Relationship with Low Back Pain (압축 종동 예하중이 요추 인대에 미치는 영향과 요통과의 관계)

  • Moon, Chang-Hyun;Chung, Tae-Eun;Sin, Hyo-Chol
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.18 no.6
    • /
    • pp.63-69
    • /
    • 2010
  • A noble model of the whole lumbar spine (L1~L5) considering all the passive elements, especially the ligaments of the lumbar spine was developed. The purpose of this study was to investigate the relationship between the shear stress of the AVB and the ALL and the effect of a compressive follower pre-load on all ligaments with various motions. The result shows that the shear stress at the AVB and the ALL are positively correlated. This indicates that the shear stress of the ligament can be used an index of low back pain. Regarding the effect of a follower pre-load, contrary to our expectation, the shear stress of the ligaments was not always reduced by applying follower pre-load; flexion was decreased and axial rotation did not change, while extension and lateral bending were increased.

Integration of Total Pollution Load Management System and Environmental Impact Assessment related System (수계 오염총량관리제와 환경영향평가제도의 통합운영방안)

  • Lee, Jong-Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.12 no.5
    • /
    • pp.359-367
    • /
    • 2003
  • The total pollution load management system of watershed has been implemented upon Special Law pertaining to the Han River Watershed Water Quality Improvement and Residents Support, Special Law pertaining to the Nakdong River Watershed Water Management and Residents Support, Special Law pertaining to the Youngsan River Watershed Water Management and Residents Support, and Special Law pertaining to the Seomjin River Watershed Water Management and Residents Support in Korea since 2002. But many other similar systems with total pollution load management system of watershed are being operated separately or independently, even though its purpose is nearly same with those of the total maximum pollutants load management in Law on Water Quality Environmental Protection, environmental impact assessment(EIA) in Law of Impact Assessment on Environment, Transportation and Disaster and Pre-environmental assessment of Environmental Policy Act. Therefore the contents of total pollution load management system of watershed and many other related systems could be overlapped and at some times have inconsistency among them. This study suggests first the integrated operation of total pollution load management system of watershed, EIA, pre-environmental assessment, urban planning, and sewage planning and secondly EIA system development by integration of EIA and pre-environmental assessment and strategic environmental assessment(SEA).