• Title/Summary/Keyword: Power system reliability

Search Result 2,243, Processing Time 0.032 seconds

Probabilistic Reliability Evaluation of Power System using TRELSS I (TRELSS를 이용한 전력계통의 확률론적 신뢰도 평가 I)

  • Kang, Sung-Rok;Tran, Tungtinh;Choi, Jae-Sok;Jeon, Dong-Hoon;Moon, Seung-Pil;Choo, Jin-Boo
    • Proceedings of the KIEE Conference
    • /
    • 2003.11a
    • /
    • pp.62-66
    • /
    • 2003
  • In recent, the importance and necessity of some studies on reliability evaluation of grid comes from the recent black-out accidents occurred in the world. The quantity evaluation of transmission system reliability is very important under competitive electricity environment. The reason is that the successful operation of electric power under the deregulated electricity market depends on transmission system reliability management. This paper introduces features and operation modes of the Transmission Reliability Evaluation for Large-Scale Systems(TRELSS) Version 5_1, a program made in EPRI, for assessing reliability indices of composite power system. The package accesses not only bulk but also buses indices for reliability evaluation of composite powers system. The characteristics of the TRELSS program are illustrated by the case studies using the IEEE 25buses system.

  • PDF

A Study on the Reliability Analysis in LVDC Distribution System Considering Layout (저압직류 배전계통의 구성 형태를 고려한 공급신뢰도 분석에 관한 연구)

  • Kim, Chung-Mo;No, Chul-Ho;Han, Joon;Oh, Yun-Sik;Kim, Hyun-Soo;Baek, In-Ho;Kim, Chul-Hwan
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.2
    • /
    • pp.75-81
    • /
    • 2015
  • At the end of the 19th century, Edison's DC power system and Tesla's AC power system was debated in power market. Finally, AC system became the primary system of the power market because both step-up and step-down of voltage by using transformer and long-distance power transmission are easily possible. However, nowadays the power market takes some action for introducing DC system. Both domestic and foreign researchers are conducting the study on the DC system as well. Some researchers have conducted the studies on power quality and economic evaluation of the DC distribution system but DC distribution system is still controversial in terms of the effectiveness and reliability. In this paper, we calculate the reliability indices of the Low Voltage Direct Current(LVDC) distribution system considering arrangement of power electronics, layout of the distribution system, and distance between load points.

A Risk Impact Assessment According to the Reliability Improvement of the Emergency Power Supply System of a Nuclear Power Plant (원자력발전소 비상전력계통 강화 방안에 따른 리스크 영향 평가)

  • Jeon, Ho-Jun
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.5
    • /
    • pp.224-228
    • /
    • 2012
  • According to the results of Probabilistic Safety Assessment(PSA) for a Nuclear Power Plant(NPP), an Emergency Power Supply(EPS) system has been considered as one of the most important safety system. Especially, the interests in the reliability of the EPS system have been increased after the severe accidents of Fukushima Daiichi. Firstly, we performed the risk assessment and the importance analysis of the EPS system based on the PSA models of the reference plant, which is the Korean standard NPP type. Considering a portable Diesel Generator(DG) system as the reliability reinforcement of the EPS system, we modified the PSA models and performed the risk impact assessment and the importance analysis. Although the reliability of the potable DG could be about 20% of the reliability of the alternative AC DG, we identified that Core Damage Frequency(CDF) was decreased by at least 4.6%. In addition, the risk impacts due to the unavailability of the EPS system on CDF were decreased.

Reliability Analysis of AC Railway Substation by using FTA (FTA를 이용한 교류전철변전소의 신뢰도 분석)

  • Ku, Bon-Hui;Cha, Jun-Min;Kim, Hyung-Chul
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.248-254
    • /
    • 2008
  • Electric railway system consists of traction power system, rolling stock, track, and overhead line system. A railway substation transforms the electric power transmitted from a electric power company and supply it to the railway power system for the operation of traction system.. It is very important to prevent a possible accident and keep the security of electric power system. This paper proposes a reliability analysis of AC railway substation by using Fault Tree Analysis(FTA). Failure rates of each equipment of railway substation are used to evaluate the reliability of railway substation. The analyzed results can be used to improve the system reliability. FTA is performed by the commercialized program of Relex(Ver. 7.7).

  • PDF

Reliability Allocation Model for KTX-II High Speed Train (KTX-II 고속 차량을 위한 신뢰도 할당 모델)

  • Lee, Kang-Won;Chung, In-Soo
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.3 s.40
    • /
    • pp.319-326
    • /
    • 2007
  • During the design phase of a system, which requires high reliability and safety such as aircraft, high speed train and nuclear power plant, reliability engineer must set up the target system reliability. To meet a reliability goal for the system, reliability allocation should be done gradually from the system to its element. For this end, first of all, we need to construct functional block diagram based on the design output and PWBS(Project Work Breakdown System). Another important input data for reliability allocation is the relationship between the cost and the reliability. In this study we investigate various reliability allocation models, which can be applicable to aircraft, vehicle, and power plant, and etc. And we suggest a proper reliability allocation model which can be effectively applicable to KTX-II high speed train to achieve the target system reliability.

Deciding the Maintenance Priority of Power Distribution System using Time-varying Failure Rate (시변 고장률을 이용한 배전계통 유지보수 우선순위 결정)

  • Lee, Hee-Tae;Moon, Jong-Fil;Kim, Jae-Chul
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.55 no.11
    • /
    • pp.476-484
    • /
    • 2006
  • The failure prediction and preventive maintenance for the equipment of nuclear power plant area using reliability-centered maintenance have been grown. On the other hand, the maintenance for power distribution system consists of time-based maintenance mainly. In this paper, the new maintenance algorithms for power distribution system are developed considering reliability indices. First of all, Time-varying failure rates are extracted from data accumulated at KEPCO using exponential distribution function and weibull distribution function. Next, based on the extracted failure rate, reliability for real power distribution system is evaluated for applying the effective maintenance algorithm which is the analytic method deciding the maintenance point of time and searching the feeder affecting the specific customer. Also the algorithm deciding the maintenance priority order are presented based on sensitivity analysis and equipment investment plan are analyzed through the presented algorithm at real power distribution system.

Investigation on Intermittent Life Testing Program for IGBT

  • Cheng, Yu;Fu, Guicui;Jiang, Maogong;Xue, Peng
    • Journal of Power Electronics
    • /
    • v.17 no.3
    • /
    • pp.811-820
    • /
    • 2017
  • The reliability issue of IGBT is a concern for researchers given the critical role the device plays in the safety of operations of the converter system. The reliability of power devices can be estimated from the intermittent life test, which aims to simulate typical applications in power electronics in an accelerated manner to obtain lifetime data. However, the test is time-consuming, as testing conditions are not well considered and only rough provisions have been made in the current standards. Acceleration of the test by changing critical test conditions is controversial due to the activation of unexpected failure mechanisms. Therefore, full investigations were conducted on critical test conditions of intermittent life test. A design optimization process for IGBT intermittent life testing program was developed to save on test times without imposing additional failure mechanisms. The applicability of the process has been supported by a number of tests and failure analysis of the test results. The process proposed in this paper can guide the test process for other power semiconductors.

The Comparison of Reliability for Change Single Loop Configuration in Radial Power Distribution System (수지상 배전계통을 단일루프로 구조 변경시 신뢰도 비교)

  • Lee, Hee-Tae;Kim, Jae-Chul;Kim, Ju-Yong
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.8
    • /
    • pp.1472-1478
    • /
    • 2009
  • The domestic power distribution system is operating in an open loop mode; however, it already has a loop structure. Power distribution systems must be changed for bi-directions power supply for smart networks due to a changing of paradigm in electric power industry. The simplest bi-directions distribution networks can make it closing of normally open switch. However, bi-directions power supply is very difficulty to be operated and there are many parts which it must study. This paper presented various models that are able to change a radial system for loop structures. Further, we compared the reliability index for each model by evaluating the amount of improvement reliability required in radial power distribution system. In addition, we calculated CIC(Customer Interruption Cost) for each model by comparing and analyzing.

Reliability analysis for substation based on the failure rate data the facilities (설비의 고장을 데이터를 이용한 변전소 신뢰도 분석 연구)

  • Lee, Y.H.;Baek, D.H.;Jang, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.29-31
    • /
    • 2006
  • The most crucial requirement of a power system is o supply quality electric energy to customers without interrution. This problem is directly related to reliability of power system. Reliability assessment of power system has been an important topic for the past several decades. This paper deals with reliability assessment of a 154kV power substation n KEPCO. In his paper, exponential distribution is used to calculate reliablity index. The failure rate data that are utilited for reliablity index based on the realistic system. Also, FTA(Fault Tree Analysis) is used to compute substation reliablity

  • PDF

Reliability Allocation Model for KTX-II High Speed Train (KTX-II 고속 차량을 위한 신뢰도 할당 모델)

  • Lee, Kang-Won;Chung, In-Soo
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.45-57
    • /
    • 2007
  • During the design phase of a system, which requires high reliability and safety such as aircraft, high speed train and nuclear power plant, reliability engineer must set up the target system reliability. To meet a reliability goal for the system, reliability allocation should be done gradually from the system to its element. For this end, first of all, we need to construct functional block diagram based on the design output and PWBS(Project Work Breakdown System). Another important input data for reliability allocation is the relationship between the cost and the reliability. In this study we investigate various reliability allocation models, which can be applicable to aircraft, vehicle, and power plant, and etc. And we suggest a proper reliability allocation model which can be effectively applicable to KTX-II high speed train to achieve the target system reliability.

  • PDF