• 제목/요약/키워드: Power system construction

검색결과 1,650건 처리시간 0.039초

시스템엔지니어링 기법 적용에 따른 경량전철 전기시스템의 생명주기비용 절감에 관한 연구 (A study on the Life Cycle Cost reduction of the LRT's power systems based on the advanced Systems Engineering)

  • 최원찬;배준호;허재훈;주지영
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.1434-1439
    • /
    • 2011
  • The purpose of this study is based on the optimize the system life cycle cost apply to the advanced systems engineering techniques consideration thought to the system life cycle for the power system which is the one of the major component of the light rail transit system. Generally, the systems engineering techniques apply to the LRT's power systems are not optimize the whole life cycle cost of the power systems because systems engineering management activities are concentrate in performing the key-technology oriented at the construction stage of the dedicated power systems for light rail transit. Through this study, All the stakeholders can be utilize a this advanced systems engineering techniques which is fully considered the life cycle cost through the considering in whole system life cycle (such as concept, design, operation, maintenance and dispose stage as well as construction stage) and adopted by KSX ISO/IEC 15288 system life cycle processes.

  • PDF

지식경영을 위한 사례기반추론 시스템의 설계 및 구축 : 'H'기업의 플랜트 건설 프로젝트 적용사례 (Design and Implementation of Case-Based Reasoning System for Knowledge Management : The Case Study of Plant Construction Division of 'H' Cooperation)

  • 장길상
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제18권3호
    • /
    • pp.231-249
    • /
    • 2009
  • Recently, plant construction industries are enjoying a favorable business climate centering around developing countries and oil producing countries rich in oil money. This paper proposes a methodology of implementing case-based reasoning(CBR) system for managing knowledge like lessons learned and various documents accumulated in performing power plant construction projects which are receiving a lot of order from foreign countries such as the Middle East, etc. Our methodology is consisted of 10 steps : user requirement gathering, information modeling, case modeling, case base design, similarity function design, user interface design, case base building, CBR module development, user interface implementation, integration test. Also, to illustrate the effectiveness of proposed methodology, the real CBR system is implemented for the plant business division of 'H' company which has international competitiveness in the field of plant construction industry. At present, the implemented CBR system is successfully utilizing as storing, sharing, and reusing knowledge which is accumulated in performing power plant construction projects in the target enterprise.

  • PDF

Dish형 집광장치 이용 10kWe급 태양열 발전시스템 설계 및 시공 사례 (Design and Construction Experiences of 10kWe Dish-type Solar Thermal Power Generation System)

  • 이상남;강용혁;조덕기;유창균;윤환기;김진수
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2005년도 제17회 워크샵 및 추계학술대회
    • /
    • pp.684-687
    • /
    • 2005
  • KIER has been running a demonstration project for 10kWe solar thermal power generation. the project is to build and operate the first solar thermal power generation system in Korea. For concentrating solar thermal energy $40m^2$ dish type concentrator was adapted and a stirling engine is going to be integrated to the system for power production. At the moment building the dish concentrator including mirror and sun tracking system was completed and it's performance are being closely evaluated. This paper will introduce some detailed designs and construction procedures which we have experienced so far.

  • PDF

배전계통 PQM 시스템 구축 및 고조파전압 분석사례 (A Case of the Distribution Power System PQMS Construction & Harmonic Voltage Analysis)

  • 박용업;이건행
    • 조명전기설비학회논문지
    • /
    • 제24권9호
    • /
    • pp.108-117
    • /
    • 2010
  • The main contents of this paper are the PQM system construction case and distribution system harmonic voltage analysis. The PQM system has constructed by KEPCO in order to investigate power quality of distribution power system for new power quality standard of KEPCO. In result, we have confirmed that voltage harmonic measurement value of the high voltage contract customer 8 households is suitable the KEPCO harmonic standard tentative plan. And the voltage harmonic value of distribution line end side is not always more high than source side by harmonic current offset effect. In the future, acquired data by season, region, load from the PQMS will be used on the resonable harmonic standard enactment in KEPCO.

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

전산지원도구를 이용한 도시철도시설 표준사양 DB 구축 연구 (The Building for Standard Specification DB of Urban Transit System Infrastructure used by Computer Design Tool)

  • 이우동;박기준;정종덕
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.791-795
    • /
    • 2006
  • Urban transit is one of the most effective ways for efficient operation and construction of an urban transit by composition system which is liked originally such as rolling-stock, power, signal and infrastructure. Urban rail transit system is running in domestic, imports major equipments from advanced countries and setup for maintenance. But it takes long time because it does each organizations and lines. Also, signal, power and track system apply different standard by each construction organizations it causes an increasing construction of cost accordingly it desperately needs a systematic countermeasure. Therefore standard specification of urban transit have been establishing and operatingfor efficient operation of urban transit and base technology security that is populace ride to become a base of state economy. After track, power and signal system will be announced. Standard specification become more, the importance of administrationof standards is emphasized more. Specification administrator’s the importance which use a computing support tool recently in railroad part in embossed and is predicted to be more such forward. Therefore we propose the effective method of management with track, power signal system by constructed data-base system.

  • PDF

건설현장의 수전설비 및 배.분전반의 현장실태 분석 (The Analysis of Field Condition for Power Receiving System and Patch and Panel Boards at Construction Sites)

  • 길형준;한운기;김향곤;최충석
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2004년도 춘계학술대회 논문집
    • /
    • pp.335-340
    • /
    • 2004
  • To analyze risk factors of temporary power installations, the investigation was carried out for power receiving system and pack and panel boards at construction sites. The subject was variable such as an airport, an apartment, a municipal playground. There are many risk factors caused by inadequate working environments and the deterioration of temporary power installations using equipment with minimum safety devices at construction sites. There, it is intended to present problems and preventive measures against electrical shock accidents, through analyzing risk factors of real field condition and investigating temporary power installations all over the country.

  • PDF

지중배전공사의 경제적 시공을 위한 관로배열 최적화 알고리즘 (An optimum algorithm for the economical construction of underground pipe-lines)

  • 조성수;김재훈;이원영;한상옥
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 춘계학술대회 논문집 전기설비전문위원
    • /
    • pp.183-185
    • /
    • 2004
  • Despite high cost, the underground power distribution system has been preferred by utilities and customers due to its stability and good living environment. Utilities, however, are burdened with the cost of installation as the service region of underground power system is getting enlarged. In this paper, a design method is proposed in order to reduce the construction cost of underground distribution system. That is an optimum algorithm, which can increase the total number of pipes in a limited space compared with a conventional design method. As a result, the proposed design method can reduce efficiently the construction cost of underground distribution system.

  • PDF