A program of steady-state and transient performance analysis for a 200kW-class small turboshaft engine with free power turbine was developed. An existing turbojet engine was used for the gas generator of the developed turboshaft engine, which was modified to satisfy performance requirements of this turboshaft engine. To verify the accuracy of steady-state performance program for this engine: the program was applied to the gas turbine test unit of the same type, and the analysis results were compared with experimental results. The developed transient performance analysis program using the CMF (Constant Mass Flow) method was utilized to analyze the cases of step increase and ramp increase of the fuel.
In this paper, a decentralized multilevel-adaptive controller for a boiler-turbine system is designed by using multiple model adaptive method. It is applied to the drum type boiler-turbine system which is simplified from Boryung T/P #1,2 model. A linearlized model is decomposed into three subsystems by means of linear transformation. Then the DMC based on such subsystem is designed and a Multiple Model Adaptive Control(MMAC) scheme is applied for the purpose of the good tracking to variable load demands of the thermal power plant. The good performance of the designed controller is shown by simulations in various conditions that have the large step and ramp change of power demamd.
This paper, a new simple controller operates in continuous conduction mode (CCM) for Boost power factor collection converter is introduced. The duty ratios are obtained by comparisons of a sensed signal from inductor current and a negative ramp carrier waveform in each switching period. By using the proposed controller, input voltage sensing, error amplifier in the current feedback loop, and analog multiplier/divider are not required, then, the control circuit implementation is very simple. To verify the proposed controller, the circuit simulation for Boost power factor correction converter was applied. For the results, the input current waveform was shaped to be closely sinusoidal, implying low THD.
In accordance with the policy of local government, the large scale of wind farms have been installed in Jeju power system. However, The intermittent characteristics of wind power output may cause grid voltage and frequency variation, especially in weak power system. One of the solution to solve this problem is installation of Energy storage system (ESS). In this case, the ESS will regulate the active power generated from wind farm to mitigate fluctuation. Actually, the local government of Jeju island constructed ESS connected to Hangwon wind turbine in 2016. From this point, this paper analyzes requirement capacity of ESS to mitigate wind power fluctuation based on measured data from Hangwon wind turbine and ESS. The simulation results will be carried out by Matlab program.
This paper presents a grid-connected photovoltaic (PV) system with direct coupled power quality control (PQC) algorithm, which uses an inner current control loop (PRT : polarized ramp time) and outer feedback control loop to improve grid power quality and maximum power point tracking (MPPT) of PV arrays. To reduce the complexity, cost and number of power conversions, which results in higher efficiency, single stage CCVSI (Current Controlled Voltage Source Inverter) is used. The proposed system operation has been divided into two modes (sunny and night). In night mode, the proposed system operates to compensate the reactive power demanded by nonlinear or variation in loads. in sunny mode, the proposed system performs PQC to reduce harmonic current and improve power factor as well as MPPT to supply active power from the PV arrays simultaneously. it is shown that the proposed system improves the system utilization factor to 100% which is generally low for PV system (20%). To verify the proposed system, a comprehensive evaluation with theoretical analysis and simulation results are presented.
Renewable energy generation cannot be consistently predicted or controlled. Therefore, it is currently not widely used in the electricity market, which requires dependable production. In this study, reliability- and variance-based controls of energy storage strategies are proposed to utilize renewable energy as a steady contributor to the electricity market. For reliability-based control, photovoltaic (PV) generation is assumed to be registered in the power generation plan. PV generation yields a reliable output using energy storage units to compensate for PV prediction errors. We also propose a runtime state-ofcharge management method for sustainable operations. With variance-based controls, changes in rapid power generation are limited through ramp rate control. This study introduces new reliability and variance indices as indicators for evaluating these strategies. The reliability index quantifies the degree to which the actual generation realizes the plan, and the variance index quantifies the degree of power change. The two strategies are verified based on simulations and experiments. The reliability index improved by 3.1 times on average over 21 days at a real power plant.
드론 또는 무인기의 정밀 자세제어를 위해서는 정확한 고도계가 필수적이며, 지상으로부터의 고도측정 정확도로 인해 레이다 고도계가 일반적으로 사용된다. 크기, 무게 및 전력소모 등에 제한으로 인해, 드론에 장착 가능한 레이다 고도계는 PD (pulse Doppler) 방식에 비해 낮은 복잡도를 갖는 FMCW (frequency modulated continuous wave) 방식이 적절하며, 특히, 짧은 송신시간으로 인해 드론 자체 움직임 (ego-motion)에 대응 가능한 fast-ramp FMCW 레이다가 보편적으로 활용된다. 이에, 본 논문에서는 fast-ramp FMCW 레이다 시스템을 위한 드론 고도 측정용 레이다 신호처리 프로세서 (RSP; radar signal processor)의 설계 및 구현 결과를 제시한다. 설계된 RSP는 Verilog-HDL을 이용하여 RTL 설계 후, Altera Cyclone-IV FPGA device를 활용하여 구현 및 검증되었다. 구현 결과, 총 27,523의 logic elements, 15,798개의 register, 138 Kbits의 memory로 구현 가능하며, 50MHz의 동작주파수로 100Hz의 실시간 고도측정이 가능함이 확인되었다.
Molded Case Circuit Breakers (MCCBs) are typically used to provide over current protection for electrical safety caused by short circuit faults and overloads in indoor low voltage power systems. The MCCB automatically connects and disconnects loads from the electrical source when the current reaches a value and duration that will cause an excessive. However, the MCCB sometimes is not interrupted due to a malfunction, nuisance tripping, or in a fire. Ensuring electrical safety is very important in a indoor low voltage power system. This paper presents the operating characteristics of MCCBs according to a temperature rise from room temperature to 160 degrees Celsius delivered by a radiant panel heater. The ABS 54c(rated current: 30A) of the hydraulic magnetic trip type was used in the experiments. The signals of temperature, voltage, and current were measured using the high accuracy Signal Conditioning Extensions for Instrumentation (SCXI) measurement system with the LabVIEW program manufactured by National Instruments. The operating characteristics were measured as functions of current amplitude and ramp-up rate. The MCCB tripping time decreased as a result of increasing current amplitude and ramp-up rate under a temperature rise condition, because the temperature and level of the current are directly proportional to the tripping time. Additionally, an instantaneous operation was observed after 8 times of the rated current, and the MCCB began to melt a surface temperature of around 300 degrees Celsius of. The experimental results coincided well with the operating curve.
본 논문에서는 고효율의 CMOS PWM DC-DC 벅 변환기를 설계하였다. 설계된 CMOS PWM DC-DC 벅 변환기는 입력전압(3.4-3.9V)로부터 일정한 출력전압(1-2.8V)을 생성한다. Inductor-based 방식을 택하였고, 제어 대상은 전류이며, Pulse Width Modulation(PWM) 모드로 동작한다. 회로 구성은 Power Switch, Pulse Width Generation, Buffer, Zero Current Sensing, Current Sensing Circuit, Clock & Ramp generation, V-I Converter, Soft Start, Compensator, Modulator 등 이다. 제안된 CMOS PWM DC-DC 벅 컨버터는 Switching Frequency가 약 1MHz이고, 부하 전류가 약 40mA이상부터 CCM동작을 하며 100mA일 때 98.71%의 최대 효율을 갖는다. 또한, 출력전압 리플은 0.98mV이다(입력전압 3.5V, 출력전압 2.5V 기준). 제안된 회로의 검증을 위해 CMOS $0.18{\mu}m$ 공정을 이용하여 시뮬레이션을 수행하였다.
The virtual power plant (VPP) is a new technology to achieve flexibility as well as controllability, like traditional centralized power plants, by integrating and operating different types of distributed energy resources (DER) with the information communication technology (ICT). Though small-sized DERs may not be controlled in a centralized manner, these are more likely to be utilized as power plants for centralized dispatch and participate in the energy trade given that these are integrated into a unified generation profile and certain technical properties such as dispatch schedules, ramp rates, voltage control, and reserves are explicitly implemented. Unfortunately, the VPP has been in a conceptual stage thus far and its common definition has not yet been established. Such a lack of obvious guidelines for VPP may lead to a further challenge of coming up with the business model and reinforcing the investment and technical support for VPP. In this context, this paper would aim to identify the definition of VPP as a critical factor in smart grid and, at the same time, discuss the details required for VPP to actively take part in the electricity market under the smart grid paradigm.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.