Normally, various auxiliary loads are installed along with the main load in industrial applications. Usually, load transformers are used to convey such types of auxiliary loads. The transformers become energized when the loads are turned-on, consequently, high amplitude of inrush current appears at the output of the uninterrupted power supply (UPS) system. To mitigate these high current amplitudes, this manuscript suggests a three-phase line-interactive UPS system to counter the inrush current during the turning-on of the auxiliary load transformer while powering the main load by using a current controlled inverter. Experimental results of a laboratory-sized prototype are provided in the support of the proposed UPS system for validation.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.26
no.12
/
pp.28-36
/
2012
Augmentation of existing EHV substations located in hilly terrain and at high altitude require many different considerations as compared to substations located in plain areas and at lower altitude. Owing to high altitude and steep terrain, meticulous engineering and preparations are required, considering the actual available space at the existing substation. Historical fault events too must be considered to enhance reliability and performance of the substation equipment. This paper proposes ways to augment the existing 2 banks of 20MVA, 220/66kV power transformers ($3{\times}6.67MVA$, single-phase) to $2{\times}50$/63MVA, 220/66kV power transformers to meet continuously increasing demand of the capital city over the next 20 years. Upgrading and augmentation of existing substations, especially the main transformers and associated equipment, require replacement with minimum or no disturbance to the existing power supply system. Considerations should also be made during engineering and design, the operational flexibilities, maintenance aspects, future expandability and value addition, in terms of reliability and space usage of the existing substation.
Kim, Hee-Dong;Kong, Tae-Sik;Lee, Young-Jun;Park, Jae-Jun
Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
2004.07a
/
pp.499-502
/
2004
In order to detect of insulation problems an early, transformer has to be performed the several tests. The ac current and tan6 of transformer winding insulation were investigated by Schering bridge. Partial discharge(PD) tests are used to evaluate the insulation condition of transformer. The moisture content measurement was conducted using RVM(recovery voltage meter). The RVM test can show that the problem is affecting the paper insulation of transformer. The value of moisture content was 2.3% in main transformer. The insulations of four transformers were judged to be in good condition.
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2001.05a
/
pp.1056-1061
/
2001
This paper describes the evaluation of noise influence of residental and boundary areas from power plant noise sources of 1200MW combined cycle power plant. Noise assessments are carried out by based on the ISO 3744, ISO 9613-1 and ISO 9613-2 to predict the noise distribution to satisfy the recommended noise level at specific locations and to calculate properly the octave noise power of main noise sources such as power transformers. air-intakes, stacks.
The Transactions of The Korean Institute of Electrical Engineers
/
v.56
no.9
/
pp.1561-1565
/
2007
According to thermal degradation on power transformers, it is known that electrical, mechanical and chemical characteristics for power transformer's oil-paper are changed. In the chemical property, especially, when the kraft paper is aged, the cellulose polymer chains break down into shorter lengths. It causes decrease in both tensile strength and degree of polymerization of paper insulation. Also the paper breakdown is accompanied by an increase in the content of various furanic compounds within the dielectric liquid. It is known that furanic components in transformer oil come only from the decomposition of insulating paper rather than from the oil itself. Therefore the analysis of furanic degradation products provides a complementary technique to dissolved gas analysis for monitoring transformers when we evaluate the aging of insulating paper by the total concentration of carbon monoxide and carbon dioxide dissolved in oil only. Recently, the analysis of furanic compounds by high performance liquid chromatography(HPLC) using IEC 61198 method for estimating degradation of paper insulation in power transformers has been used more conveniently for assessment of oil-paper. It is know that the main products which is produced by aging are 2-furfuryl alcohol, 2-furaldehyde(furfural), 2-furoic acid, 2-acetylfuran, 5-methyl-2-furaldehyde, and 5-hydroxymethyl-2-furaldehyde. For investigating the accelerated aging process of oil-paper samples we manufactured accelerating aging equipment and we estimated variation of insulations at $140^{\circ}C$ temp. during 500 hours. Typical transformer proportions of copper, silicon steel and iron have been added to oil-paper insulation during the aging process. The oil-paper insulation samples have been measured at intervals of 100 hours. Finally we have analyzed that 2-furoic acid and 2-acetylfuran products of furanic compounds were detected by HPLC, and their concentrations were increased with accelerated aging time.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.66
no.4
/
pp.194-199
/
2017
Power transformers are an important factor for power transmission and cause fatal losses if faults occur. Various diagnostic methods have been applied to predict the failure and to identify the cause of the failure. Typical diagnostic methods include the IEC diagnostic method, the Duval diagnostic method, the Rogers diagnostic method, and the Doernenburg diagnostic method using the ratio of the main gas. However, each diagnostic method has a disadvantage in that it can't diagnose the state of the power transformer unless the gas ratio is within the defined range. In order to solve these problems, we propose a diagnosis method using ELM based intelligent algorithm and fuzzy membership function. The final diagnosis is performed by multiplying the result of diagnosis in the four diagnostic methods (IEC, Duval, Rogers, and Doernenburg) by the fuzzy membership values. To show its effectiveness, the proposed fault diagnostic system has been intensively tested with the dissolved gases acquired from various power transformers.
Kim, Yeon-Whan;Lee, Young-Shin;Bae, Yong-Chae;Lee, Hyun
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2004.11a
/
pp.866-869
/
2004
Power transformers, air-intakes and stacks in the urban combined power plant are main noisy sources. Because of Inhabitant complaint by abnormal noise transferred from the power plant. the noise was investigated at power plant and uptown area. The result of diagnosis made the acoustic resonance phenomenon by 580Hz's combustion dynamic pressure with the standing wave mode of sound fields in exhaust passageway of gas turbine into main noise source of public complain. The abnormal noise is caused by the resonance exhaust noise transferred through stacks of power plant.
Kim, Kyung-Chul;Hwang, Young-Rok;Kho, Hun;Jung, Dong-Won;Chung, Hae-Sung;Lee, Dong-Wook;Jeong, Chae-Ho;Lee, Jae-Yoon
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.28
no.6
/
pp.99-105
/
2014
Power transformers are applied throughout the power system to connect systems of different voltage to one another. Since a ratio differential relay offers high sensitivity in detection of internal faults in power transformers, it is widely used in the main protection system. The use of nonlinear devices such as rectifiers and other devices utilizing solid state switching have been increased in industry during recent years. For nonlinear loads, the load current is not proportional to the instantaneous voltage. This situation creates harmonic distortion on the system. The harmonic could differential relay misoperation if not recognized. This paper aims at analyzing and probing into the influences of harmonics on a ratio differential relay for power transformer protection.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.