• Title/Summary/Keyword: Power farm

Search Result 530, Processing Time 0.026 seconds

The Change of Agricultural Labor Participation and Decision-Making Involvement of Rural Women in Korea -from 1960s to 1990s- (농촌여성의 농업노동 및 의사결정 참여의 변화 - 1960년대부터 1990년대까지의 변화를 중심으로-)

  • 조희금
    • Journal of Families and Better Life
    • /
    • v.20 no.1
    • /
    • pp.75-86
    • /
    • 2002
  • The purpose of this study is to analyse the change of agricultural labor participation and decision-making involvement of rural women in Korea from 1960s to 1990s. For analysis of these changes, I used the data surveyed and collected by different researchers during those times. During last 40 years, rural society and the mode of agricultural production rapidly changed according to the development of Korean industry. Agricultural labor participation of rural women increased since the mid 1970s. Their agricultural labor expanded into full ranges of farming. Their decision-making involvement also expanded into all divisions of farming. However, they did not have decision making power as much as they contributed to farm labor The expansion of rural women's labor within the sphere of farm production has not substantially altered the decision-making power structure within the farm household.

Output Control of Wind Farm Side Converter from DC Link for DC Voltage Stabilization with HVDC (해상풍력 연계용 HVDC의 DC전압 안정화를 위한 DC Link의 발전기측 컨버터 제어 전략)

  • Lee, Hyeong-Jin;Kang, Byoung-Wook;Huh, Jae-Sun;Kim, Jae-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.9
    • /
    • pp.1479-1485
    • /
    • 2016
  • This paper presents DC voltage recovery time improvement method in DC link of High Voltage Direct Current (HVDC) with offshore wind farm. The wind farm should be satisfied Low Voltage Ride Through(LVRT) control strategy when grid faults occur. The LVRT control strategy indicates actions which have to be executed according to the voltage dip ratio and the fault duration. However, The LVRT control strategy makes between wind farm and power system through DC Link voltage when grid fault occurs. The de-loading scheme is one of the method to control the DC voltage. But de-loading scheme need to long DC voltage recovery time. Thus, this paper proposes an improved de-loading scheme and we analysis DC voltage and active power reference through a simulation.

Economic analysis of jeju offshore pilot run wind farm by sensitivity analysis (민감도 분석을 적용한 제주 연안 풍력단지 설계의 경제성 분석)

  • Lee, K.H.;Park, J.H.;Jin, J.W.;Kwon, K.R.;Choi, K.H.
    • Journal of Power System Engineering
    • /
    • v.16 no.5
    • /
    • pp.13-19
    • /
    • 2012
  • In this paper, the offshore wind farms have been designed by using WindPRO with the help of real wind data measurements at Jeju Costal area by calculating the annual energy production for exact economic evaluation. In order to achieve benefit of wind farm, the annual revenue for power generation have been calculated with SMP and REC value. And construction cost has derived from the real wind farm project case. Also O&M cost has been estimated by OMCE (Operating & Maintenance Cost Estimator) to get accurate cost of wind farm. Economic evaluation of wind farms have been performed by comparing above parameters. In addition, sensitivity analysis calculating the effect of these factors has also been carried out.

Investigation on Selecting Optimal Wind Turbines in the Capacity Factor Point of View (이용률 관점에서의 최적 풍력발전기 선정에 대한 연구)

  • Woo, Jae-Kyoon;Kim, Byeong-Min;Paek, In-Su;Yoo, Neung-Soo;Nam, Yoon-Su
    • Journal of the Korean Solar Energy Society
    • /
    • v.31 no.5
    • /
    • pp.60-66
    • /
    • 2011
  • Selecting optimal wind turbine generators for wind farm sites in the capacity factor point of view is performed in this study. A program to determine the best wind turbine generator for the maximum capacity factor for a site was developed. The program uses both the wind characteristics of the site of interest and the power curves of the wind turbines. The program developed was applied to find out optimal wind turbine generators of three different sites in complex terrain and successfully yielded the best site dependent wind turbine generators. It was also used to determine the best wind turbine generator of the wind farm currently operating in Korea and proved its usefulness. The program and methodology developed in this study considered to be very useful at the initial design stage of the wind farm to determine the best wind turbine generators for the site of interest.

Continuation Time Integration (CTI)-Based Time Domain Simulation Analysis for Wind Farms (연속 시적분 (CTI) 기반 풍력발전단지 시모의 해석)

  • Cho, Sung-Koo;Song, Hwa-Chang;Lee, Jang-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.11
    • /
    • pp.1971-1979
    • /
    • 2010
  • As a result of increasing environmental concern, the penetration of renewable power on power systems is now increasing. Wind energy can be considered as the most economical energy sources to generate electricity without depletion of fossil fuel. To devise adequate control strategies for wind farm, time domain simulation analysis needs to be performed. This presents a continuation time integration (CTI)-based time domain simulation algorithm for wind farm with doubly fed asynchronous generator (DFAG) connected to the external power systems. This paper depicts how to time trajectories are traced using CTI-based time domain simulation. Also this paper describes the possibilities of hierachical control for wind farm output limitation, and the coordinated control has been designed by hierarchical control structured from central control level to wind farm control board and to an individual wind turbine level. Finally it shows an illustrative example of time domain simulation result with two test systems through case study.

A Study on Estimation of Wind Power Generation using Weather Data in Jeju Island (기상관측자료를 이용한 제주도 풍력단지의 풍력발전량 예측에 관한 연구)

  • Ryu, Goo-Hyun;Kim, Ki-Su;Kim, Jae-Chul;Song, Kyung-Bin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.12
    • /
    • pp.2349-2353
    • /
    • 2009
  • Due to high oil price and global warming of the earth, investments for renewable energy have been increased a lot continuously. Specially, wind power has been received a great attention in the world. In order to construct a new wind farm, forecasting of wind power generation is essential for a feasibility test. This paper investigates wind velocity measurement data of Gosan weather station which located in Hankyung of Jeju island. This paper presents results of estimation of wind power generation using digital weather forecast provided from Korea meteorological administration, and the accuracy of the wind power forecasting by comparison between forecasted data and actual wind power data.

Study on Wind Power Prediction model based on Spatial Modeling (공간모델링 기반의 풍력발전출력 예측 모델에 관한 연구)

  • Jung, Solyoung;Hur, Jin;Choy, Young-do
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.1 no.1
    • /
    • pp.163-168
    • /
    • 2015
  • In order to integrate high wind generation resources into power grid, it is an essential to predict power outputs of wind generating resources. As wind farm outputs depend on natural wind resources that vary over space and time, spatial modeling based on geographic information such as latitude and longitude is needed to estimate power outputs of wind generation resources. In this paper, we introduce the basic concept of spatial modeling and present the spatial prediction model based on Kriging techniques. The empirical data, wind farm power output in Texas, is considered to verify the proposed prediction model.

Economic Assessments of LFAC and HVDC Transmissions for Large Offshore Wind Farms

  • Park, Taesik;Kwak, Nohong;Moon, Chaeju;Cha, Seungtae;Kwon, Seongchul
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.1 no.1
    • /
    • pp.73-77
    • /
    • 2015
  • Offshore wind farms extend a distance from an onshore grid to increase their generating power, but long distance and high power transmissions raise a lot of cost challenges. LFAC (Low Frequency AC) transmission is a new promising technology in high power and low cost power transmission fields against HVDC (High Voltage DC) and HVAC (High Voltage AC) transmissions. This paper presents an economic comparison of LFAC and HVDC transmissions for large offshore wind farms. The economic assessments of two different transmission technologies are analyzed and compared in terms of wind farm capacities (600 MW and 900 MW) and distances (from 25 km to 100 km) from the onshore grid. Based on this comparison, the economic feasibility of LFAC is verified as a most economical solution for remote offshore wind farms.

Technological Experience and Crop Production in Dryland Farming Systems in Africa : The Case of Draught Animal Power in Ghana

  • Panin, Anthony
    • Proceedings of the Korean Society for Agricultural Machinery Conference
    • /
    • 1993.10a
    • /
    • pp.591-600
    • /
    • 1993
  • Considerable controversy exists about the trend of animal traction effects on crop production in dryland farming systems in sub-Saharan Africa (SSA). This problem arises on account of the failure of the few available empirical studies to recognise the important of technological experience of the individual adopting farmers. This study hence addresses this issue by examining the effects of experience in animal traction technology (ATT) on farm size, cropping emphasis, total crop output and farm productivity. It is based on farm management survey data on 42 small holder farm households fro Ghana. Thirty of these households used animal traction technology (ATT) fro crop cultivation and the rest, mainly hand-hoe. The animal traction sub-sample is classified into three groups according to farmers' years of experience with the technology , thus , those with 1-2, 3-10, and more than 10. Evidence from the study shows that the progression of years of experience with ATT leads to inten ification of labour and land use systems, enhancement of degree of motivation to enter into the market economy, increases in total crop output and farm productivity resulting for decreases in cultivated acreages. The implication of the findings is that institutioal and technical support that do accompany the introduction of such technologies should be structured to last for a relatively longer period to accomodate the learning process.

  • PDF

DC-link Voltage Control of HVDC for Offshore Wind Farm using Improved De-loading Method (개선된 De-loading기법을 이용한 해상풍력 연계용 HVDC의 DC 전압의 제어방안)

  • Huh, Jae-Sun;Moon, Won-Sik;Park, Sang-In;Kim, Doo-Hee;Kim, Jae-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.3
    • /
    • pp.399-404
    • /
    • 2015
  • This paper presents the DC voltage control method in DC link of High Voltage Direct Current(HVDC) for an offshore wind farm in Low Voltage Ride Through(LVRT) situation. Wind generators in an offshore wind farm are connected to onshore network via HVDC transmission. Due to LVRT control of grid side inverter in HVDC, power imbalancing in DC link is generated and this consequentially causes rising of DC voltage. A de-loading scheme is one of the method to protect the wind power system DC link capacitors from over voltage. But the flaw of this method is slow control response time and that it needs long recovery time to pre-fault condition after fault clear. Thus, this paper proposes improved de-loading method and we analyze control performance for DC voltage in LVRT control of HVDC for an offshore wind farm.