• Title/Summary/Keyword: Power change

Search Result 5,120, Processing Time 0.032 seconds

A Fast Algorithm of the Apparent Factor Calculation for Distance Relay Setting without Fault Analysis

  • Jo, Yong-Hwan;Xiang, Ling;Choi, Myeon-Song;Park, Ji-Seung;Lim, Seong-Il;Kim, Sang-Tae;Lee, Seung-Jae
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.1
    • /
    • pp.64-69
    • /
    • 2013
  • For power system protection, the distance relay settings are important. Apparent factor is a necessary parameter in distance relay settings. Apparent factors have to be calculated when setting the distance relays and doing the resetting in case of configuration change in power system. The problem is that the current method to calculate apparent factor requires tools and plenty of time to do fault analysis and this method is complex especially in case of configuration change. Therefore this paper proposes a fast algorithm to calculate apparent factor without the fault analysis. Test results prove that this algorithm is simple and accurate by simulation.

Tidal regime change due to the Siwha tidal power plant operation in the Yellow and East China Seas

  • Kang, Sok-Kuh;Yum, Ki-Dai;Lee, Kwang-Soo;Jang, Chan-Joo;Park, Jin-Soon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.513-516
    • /
    • 2006
  • The feasibility study for tidal power plant (TPP) has been carried out for the Siwha area inside the Kyunggi bay of the Kyunggi Bay of the Yellow and East china Seas, by KORDI (Korea Ocean Research and Development Institute) and continuing research works for tidal energy development are under progress in the several sites inside the Kyunggi Bay. In this paper we describes some results of the modeling efforts in relation the tidal regime change by Siwha TPP operation, as well as other coastal oceanographic research works involved in TPP development in the coastal region.

  • PDF

Remote Power Management System for Large Scale PC Network (대규모 PC 네트워크의 원격 전원 관리 시스템)

  • Hwang, Kitae;Lee, Jae Moon
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.15 no.4
    • /
    • pp.71-78
    • /
    • 2015
  • Since most education organizations such as Universities have a plenty of PCs, much electric power can be wasted if their power states are not managed properly. This paper introduces the RPM(Remote Power Management) software system implemented to reduce a waste of PC power in Universities. The System manager can monitor power state of all PCs in a University and turn off PCs or change power states of PCs to low power states. The RPM consists of three software modules. First, Power Controller, which is installed in each user PC, saves the power by changing low power state by utilizing low power algorithm proposed in this paper. Also it reports power state of its PC to Power Server on the state changed. Second, Power Server module gathers power state information of all PCs, stores them in a DB, and sends all or some parts of the information to Power Viewer whenever the manager asks. The manager can turn off or change a certain PC to low power state. We evaluated the performance of power saving for the RPM and the result showed achievement of 40% power saving.

Component Replacement Ordering Evaluation for Proper Reliability Maintenance in Power Distribution System (배전계통 적정 신뢰도 유지를 위한 설비교체 순위 평가)

  • Lee, Hee-Tae;Kim, Jae-Chul;Moon, Jong-Fil;Chu, Cheol-Min
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.48-50
    • /
    • 2005
  • New environment change of electric power system focused in consumer's energy supply and demand. But electric power reliability preservation and reliability improvement countermeasure also need for long-term. It is need that change equipments that is composing electric power system in well-timed time and by maintaining, prevent breakdown beforehand and prevent consumer's power interruption by equipment fail. However, as only quantitative estimation is available by reliability estimation method that is presented in existing, it is no to use in dictionary fault prevention. Therefore, applied optimum reliability preservation through existent equipment fault data analysis of electric power system in equipment replace side, and this when maintain equipment replace of electric power system for reliability preservation using responsiveness analysis to base ordering evaluate. In existing about main equipment plain that this paper is power system the valued failure rate use this by score and precedence of electric power system equipment for replace of system considered expense.

  • PDF

A Domestic Power Companies' Strategy to Enter Asian Thermal Power Plant Market (국내 발전기업의 아시아 화력발전플랜트 시장 진출전략)

  • Park, Chang-Hyun;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.7 no.4
    • /
    • pp.58-66
    • /
    • 2011
  • The power plant companies reached the culmination for growth in the domestic market. Besides, we have faced many challenges such as an electricity opening market trend for overseas, banning the use of coal due to the United nations framework convention on climate change, and the meticulous attention regarding the government's electricity charge plan. On the other hand, the overseas business has been a critical issue since China and many other developing countries expanded their projects abroad. Another factor is that power plant industry is being privatized, and it made the market regulation a bit loose. Thus, the market environment became favorable toward those companies which planned many overseas businesses. In this research, the power plant company's current condition for construction and operation as well as its technical competitiveness were analyzed, and an alternative plan using SWOT analysis for entering an oversea market was made. It dealt with both internal and external factors. Also, examined was the current situation under the power plant industry dealing with restructure for electric industry, lack of fossil fuel, and the United nations framework convention on climate change. From the research, it was suggested that many successful strategies to enter the overseas business by using the market trend I researched.

  • PDF

AC전압 인가에 따른 알루미늄 양극산화 공정 및 박막 특성

  • Lee, Jeong-Taek;Choe, Jae-Ho;Kim, Geun-Ju
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2009.11a
    • /
    • pp.242-242
    • /
    • 2009
  • Fabrication of Anodic aluminum oxide under DC vias condition has been studied. When bias and time of anodic aluminum oxide process change, the hole distance and diameter size change. Comparison of fabricated AAO between AC vias and DC vias condition has been studied in this experiment. The first and second anodization of one aluminum is done by using DC and AC power supplier. And first and second anodization of another aluminum is done by DC power supplier. The size of the aluminum is $1cm{\times}3cm$, and second anodic aluminum oxide process takes about 45min. It is found that the hexagonal shape appears on the surface of the AAO. AC power source can fabricate aao which have a nano hole array. We can see that the hole on the surface of the AC vias has a better rounded hole than DC vias AAO. we need more data so we can get characteristic about AC power generated AAO.

  • PDF

Coastal-physical cceanographic aspects in relation to the tidal current power generation in the Uldolmok (울돌목 조류발전의 연안물리적 관점에서의 고찰)

  • Yum Ki-Dai;Lee Kwang Soo;Park Jin Soon;Kang Sok Kuh
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.516-519
    • /
    • 2005
  • The pilot tidal current power plant is to be constructed at the Uldolmok between Chindo and Haenam, during next year. and extensive coastal engineering research works have been carried out. In this paper we describes some observation results of the tide and tidal current. as well as modeling work in order to investigate the tide and tidal current regime change in relation to the tidal current power plant (TCPP) construction. The special modeling skill in order to consider the turbine operation in the TCPP is developed and applied to the estimation for the flow regime change by the simple layout of the tidal current power plant.

  • PDF

Performance Analysis of Air Operated Valve by Thermal Aging (공기구동밸브의 열노화에 따른 성능평가)

  • Lee, Sun-Ki
    • Journal of Power System Engineering
    • /
    • v.19 no.5
    • /
    • pp.93-98
    • /
    • 2015
  • Nuclear power plants has a number of valves, which are operating at a high temperature-high pressure and radiation environment conditions. Nevertheless, it is important to maintain the reliability of the valves to ensure safe operation of the nuclear power plant. However, the aging of the valves by increasing of years of plant operation and the system transients due to the sudden load change are working the failures of the reliability of the valve. In this paper, we evaluate experimentally the performance change according to the thermal aging of the valve. Results show that the valve stem and the actuator leakages were enlarged by the thermal aging.

Coastal-physical cceanographic aspects in relation to the tidal current power generation in the Uldolmok (울돌목 조류발전의 연안물리적 관점에서의 고찰)

  • Kang Sok Kuh;Yum Ki-Dai;Lee Kwang Soo;Park Jin Soon
    • New & Renewable Energy
    • /
    • v.1 no.2 s.2
    • /
    • pp.73-78
    • /
    • 2005
  • The pilot tidal current power plant is to be constructed at the Uldolmok between Chindo and Haenam, during next year, and extensive coastal engineering research works have been carried out. In this paper we describes some observation results of the tide and tidal current, as well as modeling work in order to investigate the tide and tidal current regime change In relation to the tidal current power plant [TCPP] construction. The special modeling skill in order to consider the turbine operation in the TCPP is developed and applied to the estimation for the flow regime change by the simple layout of the tidal current power plant.

  • PDF

A Study on Photoresist Stripping Using High Density Oxygen Plasma (고밀도 산소 플라즈마를 이용한 감광제 제거공정에 관한 연구)

  • Jung, Hyoung-Sup;Lee, Jong-Geun;Park, Se-Geun;Yang, Jae-Kyun
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.11 no.2
    • /
    • pp.95-100
    • /
    • 1998
  • A helical inductively coupled plasma asher, which produces low energy and high density plasma, has been built and investigated for photoresist stripping process. Oxygen ion density in the order of $10^{11}/cm^3$ is measured by Langmuir probe, and higher oxygen radical density is observed by Optical Emission Spectrometer. As RF source power is increased, the plasma density and thus photoresist stripping rate are increased. Independent RF bias power to the wafer stage provides a dc bias to the wafer and an ability to add the ion assisted reaction. At 1 KW of the source power, the coupling mechanism of the RF power to the plasma is changed from the inductive mode to the capacitive one at about 1 Torr. This change causes the plasma density and ashing rate decreases abruptly. The critical pressure of the mode change becomes larger with larger RF power.

  • PDF