• Title/Summary/Keyword: Power Loss Sensitivity

Search Result 124, Processing Time 0.021 seconds

Assessment of RELAP5/MOD2 Code using Loss of Offsite Power Transient of Kori Unit 1 (고리 1호기 외부 전원 상실사고에 의한 RELAP5/MOD2코드 모델 평가)

  • Chung, Bub-Dong;Kim, Hho-Jung;Lee, Young-Jin
    • Nuclear Engineering and Technology
    • /
    • v.22 no.1
    • /
    • pp.12-19
    • /
    • 1990
  • The Loss of Offsite Power Transient at 77.5% power which occurred on June 9, 1981 at the Kori Unit 1 PWR (Pressurized Water Reactor) is simulated using the RELAP5/MOD2 system thermal-hydraulics computer code. Major thermal-hydraulic parameters are compared with the available plant data. The comparison of the analysis results with the plant data demonstrates that the RELAP5/MOD2 code has the capability to simulate the thermal-hydraulic behaviour of PWRs under accident conditions of this type with accuracy, except the pressurizer pressure and level. The pressurizer pressure increase is sensitive to the in surge now it is believed that the interracial heat transfer in a horizontal stratified flow regime may be estimated low and the compression effect due to insurge flow may be high. In the nodalization sensitivity study it is found that S/G noding with junctions between bypass plenum and steam dome is preferred to simulate the S/G water level decreasing and avoid the spurious level peak at trubine trip.

  • PDF

Large-Scale Joint Rate and Power Allocation Algorithm Combined with Admission Control in Cognitive Radio Networks

  • Shin, Woo-Jin;Park, Kyoung-Youp;Kim, Dong-In;Kwon, Jang-Woo
    • Journal of Communications and Networks
    • /
    • v.11 no.2
    • /
    • pp.157-165
    • /
    • 2009
  • In this paper, we investigate a dynamic spectrum sharing problem for the centralized uplink cognitive radio networks using orthogonal frequency division multiple access. We formulate a large-scale joint rate and power allocation as an optimization problem under quality of service constraint for secondary users and interference constraint for primary users. We also suggest admission control to nd a feasible solution to the optimization problem. To implement the resource allocation on a large-scale, we introduce a notion of using the conservative factors $\alpha$ and $\beta$ depending on the outage and violation probabilities. Since estimating instantaneous channel gains is costly and requires high complexity, the proposed algorithm pursues a practical and implementation-friendly resource allocation. Simulation results demonstrate that the large-scale joint rate and power allocation incurs a slight loss in system throughput over the instantaneous one, but it achieves lower complexity with less sensitivity to variations in shadowing statistics.

Effects of HTS Cable Applied to the Voltage Stability Limited Power System (전압 안정도 제약계통에 대한 고온초전도 케이블 적용효과)

  • Lee, Geun-Joon;Hwang, Si-Dol
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.18 no.5
    • /
    • pp.169-173
    • /
    • 2004
  • This paper presents the basic application idea of superconductor cable for voltage stability limited power system. In bulk power system, the transfer capability of transmission line is often limited by the voltage stability, and superconductor cable could be one of the countermeasure to enhance heat transfer limit as well as voltage stability limit. Steady state voltage stability approach by P-V curve is used to calculate the maximum transfer capability of initial system and superconductor applied system. IEEE-14 bus system is used to demonstrate its applicability.

Multi-level UnderVoltage Load Shedding Scheme Considering Rate of Change of Voltage for Voltage Stability (전압 변동률을 고려한 수도권 전압 안정화 다단계 부하차단 적용 방안)

  • Lee, Yun-Hwan;Kim, Tae-Gyun;Kim, Ji-Hun;Lee, Byong-Jun;Kang, Bu-Il;Cho, Jong-Man
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.12
    • /
    • pp.2335-2341
    • /
    • 2009
  • High technique growth of modem times and high industrial facility in consequence of buildings demand for electric power of an extensive scale with stability supply and maintenance of high quality. But, power system always have risk of network contingency. When power system break out disturbance, it circumstantially happen like uncontrolled loss of load developing from of cascading. Severely which would be raised wide area blackout, plan to prevent, which make stability through a little of load shedding and multi-level UnderVoltageLoadShdding should work. This paper presents target, sensitivity of bus voltage have choose appropriating load shedding location and load shedding decision making logic with considering rate of change of voltage have studied multi-level under voltage load shedding scheme. Calculation of rate of change of voltage applied method of least square. As a result, we are studied an dynamic analysis of 2008 summer peak data. We have been known that network analysis is a little development and developing UnderVoltageLoadShedding scheme.

A Study on the RF performance analysis for Multi-band Ultra Wide Band Systems (멀티밴드 UWB 시스템의 무선성능 분석에 관한 연구)

  • Choi, Seok;Kim, Gil-Gyeom;Kwack, Jun-Ho;Kim, Hak-Sun
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.28 no.12A
    • /
    • pp.951-957
    • /
    • 2003
  • The analysis of RF performance requirement conditions on communication system is critical indicator to predict the performance of system. UWB(Ultra Wide Band) system which the standard is not established yet is difficult to derive the precise system performance requirement condition. Also, there are differences between conventional UWB system and multi-band system about RF performance requirement condition. In this thesis, the differences are analyzed and performance requirement conditions of multi-band UWB system are described on the basis of the differences. Throughput, maximum transmit power, and sensitivity of multi-band UWB system is varied with respect to the number of Sub-Bands. In addition, because of Multi-path effect, if PRF(Pulse Repetition Frequency) is changed, the Multi-path link margin is happened to compensate for Multi-path Energy Loss which is contributed by increasing of the Link Margin. According to Multi-path Margin, the variation of the resistance with respect to sensitivity and interference signal is observed and analyzed through the simulation.

Performace Analysis on Nodes' Moving distances in Mobile Sensor Field (이동 센서 환경에서 노드 이동 거리에 따른 성능 변화 연구)

  • Park, Se-Young;Yun, Dai Yeol
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2021.10a
    • /
    • pp.505-507
    • /
    • 2021
  • In a Wireless Sensor Network (WSN), the wireless data transmission environment plays an important role in system performance. In the proposed mobility model moving distance of sensor nodes has a great influences on communication performance. Transmission/receiving distance (d), path loss (L), sensitivity, Bit Error Rate (BER), Signal-to-Noise Ratio (SNR) are considerations when designing a wireless communication system. MANET is a form of network in which only wireless terminals communicate with each other independently and move without any assistance of an existing infrastructure network. This paper is research on the optimized power usage method which is study on the effect of the moving distance of mobile nodes on the overall energy efficiency of the system in WSN. The purpose of this study is to extend the life of the entire network by proposing the mobile distance of sensor nodes within the communication available range.

  • PDF

Verification of the Viability of Equipotential Switching Direct Current Potential Drop Method for Piping Wall Loss Monitoring with Signal Sensitivity Analysis (등전위 교번식 직류전위차법의 신호 정밀도 검증을 통한 배관 감육 진단 기술에의 적용성 검증)

  • Ryu, Kyung-Ha;Hwang, Il-Soon;Kim, Ji-Hyun
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.28 no.2
    • /
    • pp.191-198
    • /
    • 2008
  • Flow accelerated corrosion (FAC) phenomenon of low alloy carbon steels in nuclear power plant has been known as one of major degradation mechanisms. It has a potential to cause nuclear pipe rupture accident which may directly impact on the plant reliability and safety. Recently, the equipotential switching direct current potential drop (ES-DCPD) method has been developed, by the present authors, as a method to monitor wall loss in a piping. This method can rapidly monitor the thinning of piping, utilizing either the wide range monitoring (WiRM) or the narrow range monitoring (NaRM) technique. WiRM is a method to monitor wide range of straight piping, whereas NaRM focuses significantly on a narrow range such as an elbow. WiRM and NaRM can improve the reliability of the current FAC screening method that is based on computer modeling on fluid flow conditions. In this paper, the measurements by ES-DCPD are performed with signal sensitivity analyses in the laboratory environment for extended period and showed the viability of ES-DCPD for real plant applications.

HF-Band Magnetic-Field Communication System Using Bias Switching Circuit of Class E Amplifier (E급 증폭기의 바이어스 스위칭 회로를 이용한 HF-대역 자기장 통신 시스템)

  • Son, Yong-Ho;Lee, June;Cho, Sang-Ho;Jang, Byung-Jun
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.23 no.9
    • /
    • pp.1087-1093
    • /
    • 2012
  • In this paper, we implemented a HF-band magnetic-field communication system consisting of an amplitude shift keying(ASK) transmitter, a pair of loop antennas, and an ASK receiver. Especially, we suggested a new ASK transmitter architecture, where a drain bias of class E amplifier is switched alternatively between two voltage levels with respect to input data. A maximum 5 W class E amplifier was designed using a low cost IRF510 power MOSFET at the frequency of 6.78 MHz. A measured sensitivity of the designed ASK receiver is -78 dBm, which consists of a log amplifier, a filter, and a comparator. Maximum communication range of magnetic-wave communication system with loop antennas was calculated using magnetic field equations in both near-field and far-field ranges. Also, in order to verify the calculated values, an indoor propagation loss was measured using a pair of loop antennas whose dimensions are $30{\times}30cm$. Maximum operating range is estimated about 35 m in case of transmitter's output power of 1 W and receiver sensitivity of -70 dBm, respectively. Finally, the communication field test using the designed ASK transmitter and receiver was successfully done at the distance of 5 m.

Conceptual design study on Plutonium-238 production in a multi-purpose high flux reactor

  • Jian Li;Jing Zhao;Zhihong Liu;Ding She;Heng Xie;Lei Shi
    • Nuclear Engineering and Technology
    • /
    • v.56 no.1
    • /
    • pp.147-159
    • /
    • 2024
  • Plutonium-238 has always been considered as the one of the promising radioisotopes for space nuclear power supply, which has long half-life, low radiation protection level, high power density, and stable fuel form at high temperatures. The industrial-scale production of 238Pu mainly depends on irradiating solid 237NpO2 target in high flux reactors, however the production process faces problems such as large fission loss and high requirements for product quality control. In this paper, a conceptual design study of producing 238Pu in a multi-purpose high flux reactor was evaluated and analyzed, which includes a sensitivity analysis on 238Pu production and a further study on the irradiation scheme. It demonstrated that the target structure and its location in the reactor, as well as the operation scheme has an impact on 238Pu amount and product quality. Furthermore, the production efficiency could be improved by optimizing target material concentration, target locations in the core and reflector. This work provides technical support for irradiation production of 238Pu in high flux reactors.

Generator Penalty Factor Calculation including Slack Bus by Reference Angle Re-Specification (위상각 기준모선의 이동에 의한 Slack 모선을 포함한 모든 발전기의 Penalty 계수 계산방법)

  • Lee, Sang-Joong;Kim, Kern-Joong
    • Proceedings of the KIEE Conference
    • /
    • 2000.07a
    • /
    • pp.49-51
    • /
    • 2000
  • ln this paper, a method by which penalty factors of all generators including slack bus can be directly derived is presented. With a simple re-assignment of angle reference bus to a bus where no generation exists, penalty factors for slack bus is obtained without any physical assumption. While previous Jacobian-based techniques for generator penalty factor calculation have been derived with basis upon reference bus, proposed method are not dependent on reference bus and calculated penalty factors can be substituted directly into the general ELD equation to compute the economic dispatch. Equations for system loss sensitivity, penalty factors and optimal generation allocation are solved simultaneously in normal power flow computation.

  • PDF