• Title/Summary/Keyword: Power Facility

Search Result 1,280, Processing Time 0.042 seconds

Research & Development on the Scaffolding for Cylindrical Desulfurizers Facility Maintenance (원통형 탈황설비 정비용 비계 연구개발)

  • Lee, Kwang-Gil;Kim, Woo-Gon;Eum, Seok-Ho;Kang, Cheol-Min;Kang, Jeong-Ki;Oh, Cheol-Seok;Seo, Ju-Sik;Kim, Kyeong-Jae;Park, Jong-In;Jang, Mong-Yong;Kim, Moo-Seong;Kim, Dae-Nyeon;Jung, Soo-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.22 no.3
    • /
    • pp.1-8
    • /
    • 2020
  • The desulfurizers facility is cylindrical shape. To operate properly it needs nozzles cleaned, get rid of lime adhesion and sludge, repair the wear and corrosion of facility regularly. For this purpose, workers shall access the ceiling or vertical wall at high place. Ordinary scaffoldings such as steel pipe scaffolding or system scaffolding have been using so that workers can access them. With these ordinary scaffoldings, openings around cylindrical wall are inevitable which make workers can expose always to the risk of falling. The purpose of this study is to develop customized scaffolding to minimize the openings to prevent workers form falling during maintenance it. It consists of a hexagonal central tower and six trapezoidal outer towers. And the bracing among the towers have connected each other for self-standing and for maintaining the structure of towers. Span decks, the circumference footstools, steps, etc. are laid on each floor. The safety is reviewed by structural analysis and performance test. With this study, openings each floor of this scaffold are removed. The gap between the cylindrical wall and the edge of the work stage is approximately 100 mm. Therefore, we expect that workers can work safely and efficiently.

The Study on the Field test and Operational Method of a Direct Load Control System for Air conditioner (에어컨부하 직접제어시스템 실증시험 및 운용방안에 관한 연구)

  • Gang, Won-Gu;Kim, Chung-Hwan;Kim, Myong-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2000.07d
    • /
    • pp.2825-2827
    • /
    • 2000
  • In electric power industry. load balance has been one of the most fundamental and important management goals. Therefore. the strategy to achieve high quality load management now includes load balance besides the stabilization of electricity supply and quality management of electricity. Amongst many techniques of load management. direct load management has been actively studied and utilized to increase power facility and peak load suppression. Higher peak load situation is appeared during summer than during winter in Korea. and approximately 20% of the peak load is due to the load for air-conditioning. To cope with this peak load problem during summer KEPCO is performing a research project to develop a system to remotely control air-conditioning load using wireless communication. Currently, applicable facilities are limited to small-scale air-conditioning facility that has less than 2KW power capacity. This paper described the 1st year of efforts made in the study.

  • PDF

Combined De-NOx Process with $NH_3$ SCR and Non-thermal Plasma Process for Removing NOx and Soot from Diesel Exhaust Gases

  • Chung, Kyung-Yul;Song, Young-Hoon;Oh, Sang-Hoon
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.27 no.5
    • /
    • pp.657-665
    • /
    • 2003
  • Combined De-NOx Process in which $NH_3$ SCR (Selective Catalytic Reduction) and non-thermal Plasma Process are simultaneously used, has been investigated with a pilot test facility. The pilot test facility treats the combustion flue gases exhausted from a diesel engine that generates 240 kW of electrical power. Test results show that up to 80 % of NOx (NO and NO2) can be removed at 100 - $200^{\circ}C$. None of conventional De-NOx techniques works under such low temperature range. In addition to NOx. the Pilot test results show that soot can be simultaneously treated with the present non-thermal plasma technique. The present pilot test shows that the electrical power consumption to operate the non-thermal plasma reactor is equivalent to 3 - 4 % of the electrical power generated by the diesel engine.

An Investigation and Analysis on Actual Condition of Energy Utilizations in Farmhouse for Environmental-friendly Planning of Rural Villages (친환경 농촌마을계획을 위한 주거 에너지 이용실태 조사 분석)

  • Nam, Sang-Woon;Kim, Dae-Sik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.49 no.6
    • /
    • pp.55-62
    • /
    • 2007
  • Actual states of energy utilizations were investigated and analyzed on three representative rural villages in Chungcheongnam-Do. Rural residents were almost using the ondol boiler as a heating facility and oil(diesel, kerosene) and electricity(night thermal-storage power service) as a heating energy. There were a few households using briquette or firewood in a fuel hole with Korean hypocaust. Most of their cooking facilities were gas ranges using LPG. The most popular hot-water supply system was an oil boiler and the next was an electricity boiler. The amount of energy use in a rural household generally showed 20,000 to 40,000 won/month of the electric power rate, 400 to 800 liter/year of the oil and 60 to 120 kg/year of the LPG. Prompt measures should be taken to promote the spread of new and renewable energy such as solar heat, biomass and wind power, etc.

Artificial Rainfall Test of the Engineered Cover Barriers for Near Surface Disposal of LILW

  • Park, Jin-Beak;Park, Se-Moon;Kim, Chang-Lak
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2003.11a
    • /
    • pp.306-314
    • /
    • 2003
  • Engineered barrier test facility is specially designed to demonstrate the performance of engineered barrier system for the near-surface disposal facility under the domestic environmental conditions. Comprehensive measurement systems for the water content, temperature, matric potential are installed within each test cell. In this study, short-term monitoring of the behavior of multi-layered cover system is implemented with artificial rainfall system. The periodic measurement data are collected and analyzed by a dedicated database management system, and provide a basis for performance verification of the disposal cover design.

  • PDF

Research Integrated Change Process for Configuration Management of Construction Nuclear Power Plant (건설원전 형상관리를 위한 통합변경프로세스 연구)

  • Park, Youjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.231-232
    • /
    • 2016
  • Configuration Management (CM) is a process of identifying and documenting the characteristics of a Structures, Systems and Components (SSCs), and of ensuring that changes to these characteristics are properly assessed, approved, issued, implemented and verified. There are requirement management, change control, facility configuration information management for CM activities. In order to improve safety of Nuclear Power Plant(NPP), it is necessary to manage change item systematically. Existing CM concept is focused on the NPP in operation. On the other hand, NPP under construction is difficult to efficiently manage the change because of different change process from varoius stake-holders. This research considers method of consolidation change process for NPP to ensure that approved changes are accurately reflected in the design requirements, facility configuration information, and the physical configuration.

  • PDF

Study of application method for the Rebar Modulation of High-Strength Reinforcing Bars to the Nuclear Power Plant Structures (원전구조물 고강도철근 모듈화를 위한 적용방법 연구)

  • Lim, Sang-Joon;Lee, Byung-Soo;Bang, Chang-Joon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.17-18
    • /
    • 2013
  • To minimize construction of nuclear facility, it is required to reduce reinforcing bar amount and solve reinforcing bar concentration and for this, it is necessary to develop appication design technology and modular of high strength reinforcing bar. Hence, KHNP reduces excessive reinforcing bar amount which can cause possibility of poor construction of concrete through design standard development and modular of nuclear facility structure using high strength reinforcing bar to raise economics and has its purpose to maintain high-level safety and durability as they are. This study is to introduce application method for the Rebar Modulation of High-Strength Reinforcing Bars to the Nuclear Power Plant Structures.

  • PDF

A Study on the Design Standard of Substation Facility Density and Demand Factor in Office Buildings (사무소용건물의 변전시설밀도 및 수용률 기준설정에 관한 연구)

  • 김세동;정동효
    • The Proceedings of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.6 no.6
    • /
    • pp.42-48
    • /
    • 1992
  • This paper shows a reasonable design standard of substation facility density and demand factor in office buildings, that was made by the systematic and statistical way considering actual conditions, such as investigated electric equipment capacity, electric power consumption, etc for 121 buildings. The saving of electric equipment investment, the decrease of power loss, the improvement of facilities utilization and the decrease of electric power rates an be contributed by the application of the design standard must be applied by the revision of current regulations and laws.

  • PDF

Effect Analysis for Frequency Recovery of 524 MW Energy Storage System for Frequency Regulation by Simulator

  • Lim, Geon-Pyo;Choi, Yo-Han;Park, Chan-Wook;Kim, Soo-Yeol;Chang, Byung-Hoon;Labios, Remund
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.2
    • /
    • pp.227-232
    • /
    • 2016
  • To test the effectiveness of using an energy storage system for frequency regulation, the Energy New Business Laboratory at KEPCO Research Institute installed a 4 MW energy storage system (ESS) demonstration facility at the Jocheon Substation on Jeju Island. And after the successful completion of demonstration operations, a total of 52 MW ESS for frequency regulation was installed in Seo-Anseong (28 MW, governor-free control) and in Shin-Yongin (24 MW, automatic generation control). The control system used in these two sites was based on the control system developed for the 4 MW ESS demonstration facility. KEPCO recently finished the construction of 184 MW ESS for frequency regulation in 8 locations, (e.g. Shin-Gimjae substation, Shin-Gaeryong substation, etc.) and they are currently being tested for automatic operation. KEPCO plans to construct additional ESS facilities (up to a total of about 500 MW for frequency regulation by 2017), thus, various operational tests would first have to be conducted. The high-speed characteristic of ESS can negatively impact the power system in case the 500 MW ESS is not properly operated. At this stage we need to verify how effectively the 500 MW ESS can regulate frequency. In this paper, the effect of using ESS for frequency regulation on the power system of Korea was studied. Simulations were conducted to determine the effect of using a 524 MW ESS for frequency regulation. Models of the power grid and the ESS were developed to verify the performance of the operation system and its control system. When a high capacity power plant is tripped, a 24 MW ESS supplies power automatically and 4 units of 125MW ESS supply power manually. This study only focuses on transient state analysis. It was verified that 500 MW ESS can regulate system frequency faster and more effectively than conventional power plants. Also, it was verified that time-delayed high speed operations of multiple ESS facilities do not negatively impact power system operations. It is recommended that further testing be conducted for a fleet of multiple ESSs with different capacities distributed over multiple substations (e.g. 16, 24, 28, and 48 MW ESS distributed across 20 substations) because each ESS measures frequency individually. The operation of one ESS facility will differ from the other ESSs within the fleet, and may negatively impact the performance of the others. The following are also recommended: (a) studies wherein all ESSs should be operated in automatic mode; (b) studies on the improvement of individual ESS control; and (c) studies on the reapportionment of all ESS energies within the fleet.