• Title/Summary/Keyword: Power Estimation

Search Result 3,012, Processing Time 0.029 seconds

A Survey Research for Power Demand Forecast Criteria of new Industry Complex (산업수용가에 대한 전력수요 예측기준에 관한 조사연구)

  • Nam, Kee-Young;Choi, Sang-Bong;Jeong, Seong-Hwan;Ryoo, Hee-Suk;Kim, Dae-Kyung
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.86-88
    • /
    • 2003
  • New cities and industrial complexes are being developed actively according to the government's policy. To determine the size of investment, number of power lines and substations for stable power supply to newly developed industrial complexes, the accurate estimation of power demand is necessary. "The standards for the estimation of power demands in newly developed residential and industrial complexes" established by KEPCO in 1991 have been used up to now. But the background for the estimation of power demands is weak and the accuracy has not been verified. Also, it has been passed above 10 years since their establishment and the social & economic situations have changed a lot, which requires an urgent revision. Through this survey and analysis of existing areas, new standards that will enable more accurate estimation of power demands in new cities and industrial complexes to be developed in the future are established by calculating the some kinds of power demand factors.

  • PDF

An Improved Estimation Model of Server Power Consumption for Saving Energy in a Server Cluster Environment (서버 클러스터 환경에서 에너지 절약을 위한 향상된 서버 전력 소비 추정 모델)

  • Kim, Dong-Jun;Kwak, Hu-Keun;Kwon, Hui-Ung;Kim, Young-Jong;Chung, Kyu-Sik
    • The KIPS Transactions:PartA
    • /
    • v.19A no.3
    • /
    • pp.139-146
    • /
    • 2012
  • In the server cluster environment, one of the ways saving energy is to control server's power according to traffic conditions. This is to determine the ON/OFF state of servers according to energy usage of data center and each server. To do this, we need a way to estimate each server's energy. In this paper, we use a software-based power consumption estimation model because it is more efficient than the hardware model using power meter in terms of energy and cost. The traditional software-based power consumption estimation model has a drawback in that it doesn't know well the computing status of servers because it uses only the idle status field of CPU. Therefore it doesn't estimate consumption power effectively. In this paper, we present a CPU field based power consumption estimation model to estimate more accurate than the two traditional models (CPU/Disk/Memory utilization based power consumption estimation model and CPU idle utilization based power consumption estimation model) by using the various status fields of CPU to get the CPU status of servers and the overall status of system. We performed experiments using 2 PCs and compared the power consumption estimated by the power consumption model (software) with that measured by the power meter (hardware). The experimental results show that the traditional model has about 8-15% average error rate but our proposed model has about 2% average error rate.

Application of Dynamic Model for Steam Turbine and its Parameter Estimation in a Fossil Fired Power Plant

  • Choi, Inkyu;Woo, Joohee;Kim, Byoungchul;Son, Gihun
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.3
    • /
    • pp.409-413
    • /
    • 2016
  • The 500 MW rated steam turbine model in coal fired power plant is developed to be used for validation and verification of controller rather than for the education of operator. The valve, steam turbine, reheater and generator are modeled and integrated into the simulator. And the data from the plant heat balance diagram are used for estimation of the model parameters together with actual operating data. It is found that the outputs of model such as pressure, temperature and speed are similar to the operating ones. So, it is expected that the developed model will play a very big role in controller development.

Estimation Methodology of Future Market Size for HTS Power Devices (초전도 전력기기 미래 시장규모 예측방법론)

  • Kim, Jong-Yul;Lee, Seung-Ryul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.9
    • /
    • pp.1535-1542
    • /
    • 2007
  • HTS (High Temperature Superconducting) Power devices has the several useful characteristics from the technical and economical viewpoint. Possible application to the utility industry have been widely discussed in various research projects. For the successful introduction of HTS power devices into power system, establishing a proper R&D and marketing strategies through estimating the future market size are necessary. However, quantitative estimates of how well HTS power devices will serve their markets have been lacking. In this paper, we propose a estimation methodology of future market size for HTS power divices such as cable, transformer, generator, and motor, and also evaluate the future international and domestic market size by using proposed methodology.

Diagnostics of Rotating Machinery using Recursive Bayesian Estimation (재귀 베이시안 추정을 이용한 회전기기 진단)

  • Oh, Joon-Seok;Sohn, Seok-Man;Kim, Hee-Soo;Lee, Seung-Cheol;Bae, Yong-Chae
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.6 no.1
    • /
    • pp.49-52
    • /
    • 2020
  • Since power plant is an important system to provide electricity, it is necessary to monitor it in order to operate safely. Much information related with machine diagnosis exists in written form instead of digital data. So, it causes difficulties of analyzing and finding solutions. Rulebased expert system can provide flexible and effective solutions to users. In this paper, Recursive Bayesian Estimation is applied in order to increase accuracy of solutions.

Analysis of Power Demand in Housing Complex by Area and Land Use (지역별 토지용도별 주택단지 전력수요 실태 분석)

  • Choi, Sang-Bong;Nam, Ki-Young;Kim, Dae-Kyeong;Jeong, Seong-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.77-79
    • /
    • 2003
  • New cities and industrial complexes are being developed actively because of the government policies aiming population distribution and vitalization of construction industry. To determine the investment amount, number of power lines and substations for stable power supply to newly developed residential and industrial complexes, accurate estimation of power demand is necessary. This paper propose standards for the estimation of power demands for power company and construction company to settle the debates surrounding this issue. Through a survey and analysis of existing areas, new standards that will enable more accurate estimation of power demands in new cities complexes to be developed in the future are established by calculating the average load density, load factor, utilization factor by area, use and building size after dividing the facilities into building type and the areas into the areas planned to be developed and the areas not yet planned to be developed.

  • PDF

Accurate Voltage Parameter Estimation for Grid Synchronization in Single-Phase Power Systems

  • Dai, Zhiyong;Lin, Hui;Tian, Yanjun;Yao, Wenli;Yin, Hang
    • Journal of Power Electronics
    • /
    • v.16 no.3
    • /
    • pp.1067-1075
    • /
    • 2016
  • This paper presents an adaptive observer-based approach to estimate voltage parameters, including frequency, amplitude, and phase angle, for single-phase power systems. In contrast to most existing estimation methods of grid voltage parameters, in this study, grid voltage is treated as a dynamic system related to an unknown grid frequency. Based on adaptive observer theory, a full-order adaptive observer is proposed to estimate voltage parameters. A Lyapunov function-based argument is employed to ensure that the proposed estimation method of voltage parameters has zero steady-state error, even when frequency varies or phase angle jumps significantly. Meanwhile, a reduced-order adaptive observer is designed as the simplified version of the proposed full-order observer. Compared with the frequency-adaptive virtual flux estimation, the proposed adaptive observers exhibit better dynamic response to track the actual grid voltage frequency, amplitude, and phase angle. Simulations and experiments have been conducted to validate the effectiveness of the proposed observers.

New Model-based IP-Level Power Estimation Techniques for Digital Circuits (디지털 회로에서의 새로운 모델 기반 IP-Level 소모 전력 추정 기법)

  • Lee, Chang-Hee;Shin, Hyun-Chul;Kim, Kyung-Ho
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.43 no.2 s.344
    • /
    • pp.42-50
    • /
    • 2006
  • Owing to the development of semiconductor processing technology, high density complex circuits can be integrated in a System-on-Chip (SoC). However, increasing energy consumption becomes one of the most important limiting factors. Power estimation at the early stage of design is essential, since design changes at lower levels may significantly lengthen the design period and increase the cost. In this paper, logic level circuits ire levelized and several levels are selected to build power model tables for efficient power estimation. The proposed techniques are applied to a set of ISCAS'85 benchmark circuits to illustrate their effectiveness. Experimental results show that significant improvement in estimation accuracy and slight improvement in efficiency are achieved when compared to those of a well-known existing method. The average estimation error has been reduced from $9.49\%\;to\;3.84\%$.

Power and Trim Estimation for Helicopter Sizing and Performance Analysis

  • Laxman, Vaitla;Lim, Jae-Hoon;Shin, Sang-Joon;Ko, Kwang-Ho;Jung, Sung-Nam
    • International Journal of Aeronautical and Space Sciences
    • /
    • v.12 no.2
    • /
    • pp.156-162
    • /
    • 2011
  • The preliminary design stage of helicopters consists of various operations and in each operation design several detailed analysis tasks are needed. The analysis tasks include performance and the required power estimation. In helicopter design, those are usually carried out by adopting the momentum theory. In this paper, an explicit form of computational analysis based on the blade element theory and uniform/non-uniform inflow model is developed. The other motivation of the present development is to obtain trim and required power estimation for various helicopter configurations. Sectional and hub loads, power, trim, and flapping equations are derived by using a symbolic tool. Iterative computations are carried out till convergence is achieved in the blade response, inflow, and trim. The predictions regarding the trim and power estimation turn out to be correlated well with the experimental results. The effect of inflow is further investigated. It is found that the present prediction for the lateral cyclic pitch angle is improved with the non-uniform inflow model as compared to that by the uniform inflow model. The presently improved trim and power estimation will be useful for future helicopter sizing and performance analysis.

A Novel Carrier-to-noise Power Ratio Estimation Scheme with Low Complexity for GNSS Receivers (GNSS 수신기를 위한 낮은 복잡도를 갖는 새로운 반송파 대 잡음 전력비 추정기법)

  • Yoo, Seungsoo;Baek, Jeehyeon;Yeom, Dong-Jin;Jee, Gyu-In;Kim, Sun Yong
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.20 no.7
    • /
    • pp.767-773
    • /
    • 2014
  • The carrier-to-noise power ratio is a key parameter for determining the reliability of PVT (Position, Velocity, and Time) solutions which are obtained by a GNSS (Global Navigation Satellite System) receiver. It is also used for locking a tracking loop, deciding the re-acquisition process, and processing advanced navigation in the receiver subsystem. The representative carrier-to-noise power ratio estimation schemes are the narrowband-wideband power ratio method (NW), the MM (Moment Method), and Beaulieu's method (BL). The NW scheme is the most classical one for commercial GNSS receivers. It is often used as an authoritative benchmark for assessing carrier-to-noise power estimation schemes. The MM scheme is the least biased solution among them, and the BL scheme is a simpler scheme than the MM scheme. This paper focuses on the less biased estimation with low complexity when the residual phase noise remains, then proposes a novel carrier-to-noise power ratio estimation scheme with low complexity for GNSS receivers. The asymptotic bias of the proposed scheme is derived and compared with others, and the simulation results demonstrate that the complexity of the proposed scheme is lowest among them, while the estimation performance of the proposed scheme is similar to those of the BL and MM schemes in normal and high gained reception environments.