• Title/Summary/Keyword: Power Cables

Search Result 674, Processing Time 0.029 seconds

Finite Element Analysis of Power Cables for Wind Turbine Application (전자장해석을 이용한 풍력발전용 전력 케이블의 전자기적 고찰)

  • Kim, Ji-Hyun;Cho, Sung-Ho;Lee, In-Woo
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.257-260
    • /
    • 2006
  • This paper presents electromagnetic finite element analysis of power cables for wind turbine application. Eddy current losses are calculated due to high currents along metallic part, and dielectric strength on power cables is investigated for case study, which suggests the optimal cabling configuration for wind turbine construction.

  • PDF

Developing Equipment to Detect the Deterioration Status of 6.6kV Power Cables in Operation at Power Station (발전소에서 운전 중인 활성 6.6kV 전력 케이블의 고장상태를 파악하는 장치의 개발)

  • Um, Kee-Hong;Lee, Kwan-Woo
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.14 no.4
    • /
    • pp.197-203
    • /
    • 2014
  • The technology to predict and prevent an accident of the cable system in power station is required. The techniques of inactivated diagnosis, partial discharge and $tan{\delta}$, have been adopted to diagnoze the operating characteristics of cables, but it is not so easy to find out problems in cables in an inactive state before the cable accident happens. In this paper, we did a research on the 6.6kV high-power cables, installed at Korean Western Power Station Co., Ltd. in order to diagonize the cables, playing a major role at the station. We have developed an equipment to measure an insulation resistance based on the temperature and current of the cable. By installing the system in a power station, we could find abnormal status for evaluation of the lifetime. In the short term, by analyzing the data, we apply the research result to the diagnosis and evaluation of the 6.6kV power cables. In the long run, however, we plan to reduce the cost of the installation and operation of cable systems at power stations.

A Review of Strategy to Capture Niche Marketing of HTS Power Distribution Cable

  • Park, Sang-Bong;Nam, Kee-Young;Kim, Dae-Kyeong;Jeong, Seong-Hwan;Ryoo, Hee-Suk
    • KIEE International Transactions on Power Engineering
    • /
    • v.4A no.1
    • /
    • pp.11-17
    • /
    • 2004
  • It becomes difficult and high in cost to construct new ducts and/or tunnels for power cables in domestic areas. This paper presents possible strategy of an HTS distribution cables for distributing electric power in local areas as niche marketing. Reflected were its important distinction such as system configuration, rationale, establishment of strategy and considerably high economical efficiency compared with present underground cables. In this paper, applicable important items by using HTS distribution cables in water pumping powerhouse and distribution substation as example objective regions were reviewed. Based on this, the following items on distribution HTS system are examined. (I)A review of constructing a model system to introduce high temperature superconducting distribution cables to objective areas is presented. (2)The strategy to capture HTS distribution cable in water pumping powerhouse and distribution substation as niche marketing regions were reviewed. (3)In concrete, system configuration, rationale, establishment of strategy and considerably high economical efficiency are reviewed between existing cable and HTS one.

Experimental testing and evaluation of coating on cables in container fire test facility

  • Aurtherson, P. Babu;Hemanandh, J.;Devarajan, Yuvarajan;Mishra, Ruby;Abraham, Biju Cherian
    • Nuclear Engineering and Technology
    • /
    • v.54 no.5
    • /
    • pp.1652-1656
    • /
    • 2022
  • Fire tests were conducted on cables using fire-retardant paint employed in nuclear power plants that transmit electrical power, control and instrument signals. The failure criteria of various power and control cables coated with fire retardant coating at three different coating thicknesses (~0.5 mm, 1.0 mm & 1.5 mm) were studied under direct flame test using Container Fire Test Facility (CFTF) based on standard tests for bare cables. A direct flame fire test was conducted for 10 min with an LPG ribbon burner rated at ten by fixing the cable samples in a vertical cable track. Inner sheath temperature was measured until ambient conditions were achieved by natural convection. The cables are visually evaluated for damage and the mass loss percentage. Cable functionality is ascertained by checking for electrical continuity for each sample. The thickness of cable coating on fire exposure is also studied by comparing the transient variation of inner sheath temperature along the Cable length. This study also evaluated the adequacy of fire-retardant coating on cables used for safety-critical equipment in nuclear power plants.

AC Loss Characteristic Analysis of Superconducting Power Cable for High Capacity Power Transmission (대용량 전력 전송을 위한 초전도 전력케이블의 교류손실 특성 분석)

  • Lee, Seok-Ju
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.24 no.2
    • /
    • pp.57-63
    • /
    • 2019
  • In order to facilitate the supply of gradually increasing power demand, it is also necessary to increase the number of power cables for power transmission as well as generation facilities. However, the expansion of electric power cables for supplying power to most urban areas requires a space for installation of additional cables, and the space for installing cables in domestic downtown areas is insufficient at present. The superconducting power cable, which can transmit more power with the same size, has emerged as an alternative to overcome the insufficient cable installation space. However, superconducting power cables, which have the advantage of large power transmission, have some losses in the AC (Alternating Current) system. Therefore, the design and analysis of AC losses are essential to introduce superconducting power cables in AC power transmission systems. In this paper, we analyze the AC loss of various superconducting power cables and consider the actual superconducting power cables and their application to the system. Although there is a theoretical calculation method of AC loss for single superconducting wire, it is not easy to calculate AC loss of superconducting power cable with large number. Therefore, the authors intend to analyze various kinds of superconducting power cable AC loss by using electromagnetic finite element analysis considering E-J (Electric field-Current density) characteristics of superconductivity. The analysis of the AC loss characteristics of the superconducting power cable will be an important factor in the design and development of the superconducting power cable to be applied to the actual system.

Development of System and Measured Results for Measuring Insulation Resistance of High-Power Cables in Operation (활선 고전력 케이블의 절연저항을 측정하기 위한 시스템 설계 및 측정결과)

  • Um, Kee-Hong;Kim, Bo-Kyeong
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.16 no.4
    • /
    • pp.165-170
    • /
    • 2016
  • The XLPE(or CV) cables installed to deliver high electric power from generator at the power station have operating for the last 40 years in Korea. In 6-8 years from the time of initial operation, the cables in operation start a deteriorating process, depending on the installation and usage conditions. Some cables, even before 6-8 years from the installation, can cause accidents due to the faulty construction or other inadequate environments. In order to prevent cable accident in advance, the regular auditing of power cables are required. For a systematic realization of surveillance and prevention of accidents, we have invented a measuring device. In this paper, we present the device installed at Korean Western Power Co. Ltd., in order to detect the deterioration status of insulation resistances of dielectrics in the cables. We present that the measured results by the device we developed show the deteriorating processes in the cables in operation.

Review of the Conceptual Design for the Use of HTS Power Transmission Cable for a Metropolitan Area

  • Park, Sang-Bong
    • KIEE International Transactions on Power Engineering
    • /
    • v.3A no.2
    • /
    • pp.63-69
    • /
    • 2003
  • The necessity of compact high temperature superconducting cables is more keenly felt in densely populated metropolitan areas. Because the compact high-temperature superconducting cables can be installed in ducts and tunnels, thereby reducing construction costs and making the use of underground space more effective, the effect of introducing it to the power system will be huge. Seoul, Korea, is selected as a review model for this paper. The loads are estimated by scenario based on a survey and analysis of 345kV and 154kV power supply networks in this area. Based on this, the following elements for an urban transmission system are examined. (1) A method of constructing a model system to introduce high-temperature superconducting cables to metropolitan areas is presented. (2) A case study is conducted through the analysis of power demand scenarios, and the amount of high-temperature superconducting cable to be introduced by scenario is examined. (3) The economy involved in expanding existing cables and introducing high-temperature superconducting cables(ducts or tunnels) following load increase in urban areas is examined and compared., and standards for current cable ducts are calculated. (4) The voltage level that can be accommodated by existing ducts is examined.

Experimental and Theoretical Study on the Prediction of Axial Stiffness of Subsea Power Cables

  • Nam, Woongshik;Chae, Kwangsu;Lim, Youngseok
    • Journal of Ocean Engineering and Technology
    • /
    • v.36 no.4
    • /
    • pp.243-250
    • /
    • 2022
  • Subsea power cables are subjected to various external loads induced by environmental and mechanical factors during manufacturing, shipping, and installation. Therefore, the prediction of the structural strength is essential. In this study, experimental and theoretical analyses were performed to investigate the axial stiffness of subsea power cables. A uniaxial tensile test of a 6.5 m three-core AC inter-array subsea power cable was carried out using a 10 MN hydraulic actuator. In addition, the resultant force was measured as a function of displacement. The theoretical model proposed by Witz and Tan (1992) was used to numerically predict the axial stiffness of the specimen. The Newton-Raphson method was employed to solve the governing equation in the theoretical analysis. A comparison of the experimental and theoretical results for axial stiffness revealed satisfactory agreement. In addition, the predicted axial stiffness was linear notwithstanding the nonlinear geometry of the subsea power cable or the nonlinearity of the governing equation. The feasibility of both experimental and theoretical framework for predicting the axial stiffness of subsea power cables was validated. Nevertheless, the need for further numerical study using the finite element method to validate the framework is acknowledged.

Relationship Between Humidity and Insulation Status of XLPE 6.6kV Cables for the Load of Electric Turbine Generator (터빈 발전기 부하용 XLPE 6.6kV 케이블의 절연층 절연상태와 습도의 상관관계)

  • Um, Kee-Hong
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.16 no.5
    • /
    • pp.185-190
    • /
    • 2016
  • The high-power 6.6 kV XLPE (or CV) cables at Korean electric power stations have been in operation for the last 40 years. Most of the XLPE cables starts deteriorating in 6-8 years from the operating instant of time, some cables may be breakdown at any moment even though they were installed in recent years, causing, huge socioeconomic losses. In order to prevent unexpected cable accident, the operating status of power cables should be monitored in regularly, timely bases. We have invented a device in order to systematically monitor and prevent an abrupt accidents of high-power cables in operation at power station. It has been installed at Korean Western Power Co. Ltd. at Taean, and operating normally for the last 4 years. In this paper, we introduce the functions and operating principles of the measuring device, and present the relationship between humidity and insulation status of XLPE cables for the load of electric turbine generator.

Measurements of Load Current of XLPE Cables Installed at the Load Terminal of Turbine Generator in Operation at Thermoelectric Power Station (화력 발전소의 터빈 발전기 부하단에 설치된 XLPE 케이블의 부하전류 측정)

  • Um, Kee-Hong;Kim, Bo-Kyeong
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.17 no.1
    • /
    • pp.207-212
    • /
    • 2017
  • The cables installed to deliver high electric power from a generator at a thermoelectric power station are XLPE (or CV) cables. Depending on the installation and usage conditions, the cables in operation start deteriorating from the time of initial operation. Some cables can cause accidents due to faulty construction or other environmental factors. In order to prevent cable accidents, regular auditing of power cables is required. We have invented a measuring device for systematic surveillance and prevention of accidents, and installed the device at Korean Western Power Co. Ltd. which measures load currents through the cables. In this paper, we present the load current measured using our device, analyze the load characteristics by measures current, compare the ampacity defined by IEC standard, and present a basic data to obtain the temperature of cable conductors.