• Title/Summary/Keyword: Power Breaking Capacity

Search Result 27, Processing Time 0.026 seconds

Tillage Characteristics of the Single-Edged Rotary Blade (단면형 로터리경운날의 경운 특성)

  • 이승규;김성태;우종구
    • Journal of Biosystems Engineering
    • /
    • v.25 no.5
    • /
    • pp.369-378
    • /
    • 2000
  • The purpose of this study is to developed high-efficient rotary tillage system for a power tiller by improving the rotary blade. A kind of the rotary blade with single-edged blade(DS) was developed that requires lower tillage energy than conventional double-edged blade(CD) on the design theory for Japanese rotary blade. In order to find out the tillage characteristics between the single-edged blade and the double-edged blade for power tiller, experiments were performed in soil-bins which were filled up clay loam, loam and sandy loam, and then analyzed the effects of the factors such as soil texture, travelling speed, rotational speed, and tillage depth to each of the blades. And field tests were carried out to compare tillage performances of the two blades using rotary cultivator driven by conventional power tiller. The results of this study were summarized as follows; 1) On the soil bin experiment, it was found that tillage torque of the single-edged blade was less than the ones of the double-edged blade. The decreasing ratios of maximum tillage torque of the single-edged blade to the ones of the double-edged blade were 1 to 8% at clay loam, 5 to 20% at loam and 9 to 31% at sandy loam, respectively. 2) By the field tests, that the tillage performances with the single-edged blade compared with the double-edged blade was improved about 19% in field capacity, about 34% in fuel consumption, and 12.5% in soil breaking ratio. Furthermore, the fluctuation of engine speed, the variation of exhaust gas temperature, and the amount of soil clogging on the blade and straw wound on the rotary shaft showed lower values with the developed blade than the conventional blade. So, it may be concluded that tillage performance by the developed single-edged blade was improved compared with the one by the conventional double-edged blade.

  • PDF

Application Method and EMTP-RV Simulation of Series Resonance Type Fault Current Limiter for Smart Grid based Electrical Power Distribution System (스마트 그리드 배전계통을 위한 직렬 공진형 한류기 적용 방법 및 EMTP-RV 시뮬레이션 연구)

  • Yun-Seok Ko;Woo-Cheol Lee
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.19 no.2
    • /
    • pp.361-370
    • /
    • 2024
  • In this paper, a method was studied for applying a series resonant type fault current limiter that can be manufactured at low cost to the smart grid distribution system. First, the impact of the harmonic components of the short-circuit fault current injected into the series resonance circuit of the fault current limiter on the peak value of the transient response was analyzed, and a methodology for determining the steady-state response was studied using percent impedance-based fault current computation method. Next, the effectiveness of the method was verified by applying it to a test distribution line. The test distribution system using the designed current limiter was modeled using EMTP_RV, and a three-phase short-circuit fault was simulated. In the fault simulation results, it was confirmed that the steady-state response of the fault current accurately followed the design target value after applying the fault current limiter. In addition, by comparing the fault current waveform before and after applying the fault current limiter, it was confirmed that the fault current was greatly suppressed, confirming the effect of applying the series resonance type current limiter to the distribution system.

Development of 115K Tanker Design Adopted Ice Class 1A (Baltic Ice Class IA를 적용한 115K Ice Tanker 개발)

  • Kim, Hyun-Soo;Ha, Mun-Keun;Baek, Myeong-Chul;Kim, Soo-Young;Park, Jong-Woo;Chun, Ho-Hwan
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.41 no.6
    • /
    • pp.120-125
    • /
    • 2004
  • There are very few numbers of 115K FPP (Fixed Pitch Propulsion) Tankers for the Baltic ice class IA because the minimum power requirement of FMA (Finish- Swedish Maritime Association) needs quite large engine power and the 40 m Beam is out of calculation range of FMA minimum power requirements. The shipyard has no choice except to increase the engine power to satisfy FMA minimum power requirement Rule. And the operation cost, efficiency of hullform and its building cost are not good from the ship owners' point of view To solve this problem, the experience of ice breaking tanker development and the ice tank test results were adopted. The main idea to reduce the ice resistance is by reducing waterline angle at design load waterline. The reason behind the main idea is to reduce the ice-clearing force. Two hull forms were developed to satisfy Baltic Ice class IA. Two ice tank tests and one towing tank test was performed at MARC (Kvaener-Masa Arctic Research Center) and SSMB (Samsung Ship Model Basin) facilities, respectively. The purpose of these tests was to verify the performance in ice and open water respectively The hull form 2 shows less speed loss compared to Hull form 1 in open water operation but hull form 2 shows very good ice clearing ability. finally the Hull Form 2 satisfying Baltic ice class IA. The merit of this hull form is to use the same engine capacity and no major design changes in hull form and other related designs But the hull structure has to be changed according to the ice class grade. The difference in two hull form development methods, ice model test methods and analysis methods of ice model test will be described in this paper.

The Operational Characteristics of High-speed Interrupter by Fault Types (고장 유형별 고속 인터럽터의 동작 특성)

  • Jeong, In-Sung;Choi, Hyo-Sang;Jung, Byung-Ik
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.2
    • /
    • pp.278-283
    • /
    • 2013
  • With the increasing power demands, size of the fault current in electrical grids is steadily increasing, and it exceeds the breaking capacity of circuit breakers. To effectively cope with these problems, a high-speed interrupter was suggested. The high-speed interrupter provides fault current with a bypass to a fault current limiter in case of accidents and consequently, fault current can be restricted. In this study, behavioral characteristics of high-speed interrupter were analyzed by accident types occurred in a distribution system. When accidents occurred, a and b contact of the high-speed interrupter were turned-off and then, turned-on. Accordingly, fault current flowed to the circuit connected to a current limiting element, and the fault current limiter restricted fault current to within a half-cycle. Nevertheless, the behavior of the high-speed interrupter was slowed down by a switching surge. As a result, fault current was confirmed to be restricted not to within the anticipated half-cycle, but to after a half-cycle. Moreover, the behavioral characteristics of the high-speed interrupter changed not only by accident types, but by behaviors of R, S, and T phases. This was due to the errors in stroke lengths of the high-speed interrupters, which resulted in a slight time discrepancy among three interrupters. In addition, the switching behaviors of the b and a contact were confirmed not to have coincided due to the switching surge; b contact behaved first and a contact followed. because of this, accuracy of stroke length and switching surges through the solenoid suction increases may be necessary to resolve.

Evaluation Method for Protection Coordination of PV Systems Interconnected with Primary Feeders (태양광전원이 연계된 고압배전선로의 보호협조 평가 방안에 관한 연구)

  • Kim, Byungki;Kim, Sohee;Ryu, Kyungsang;Rho, Daeseok
    • Journal of the Korea Convergence Society
    • /
    • v.2 no.4
    • /
    • pp.29-37
    • /
    • 2011
  • Dispersed generation (DG) such as wind power (WP) and Photovoltaic systems (PV) that has been promoted at the national level recently is mainly being introduced into distribution systems adjacent to consumers because it is generation on a small scale when compared to current generation. Due to its characteristics, DG can be operated by interconnection with distribution systems to present security of more stable power and efficient use of power facilities and resources. Problems on protection coordination of distribution systems by reverse flow of DG can roughly be divided into three possibilities: excess in rated breaking capacity (12.5KA) of protective devices by a fault in DG current supply, failure to operate protective devices by an apparent effect that can occur by reduction in impedance parallel circuit fault current due to interconnection of DG, and malfunction of protective devices by interconnection transformer connection type. The purpose of this study is to analyze problems in protection coordination that can occur when DG is operated by interconnection with distribution systems by conducting modeling and simulations by using theoretical symmetrical components and MATLAB/SIMULINK to present methods to improve such problems.

How effective has the Wairau River erodible embankment been in removing sediment from the Lower Wairau River?

  • Kyle, Christensen
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.237-237
    • /
    • 2015
  • The district of Marlborough has had more than its share of river management projects over the past 150 years, each one uniquely affecting the geomorphology and flood hazard of the Wairau Plains. A major early project was to block the Opawa distributary channel at Conders Bend. The Opawa distributary channel took a third and more of Wairau River floodwaters and was a major increasing threat to Blenheim. The blocking of the Opawa required the Wairau and Lower Wairau rivers to carry greater flood flows more often. Consequently the Lower Wairau River was breaking out of its stopbanks approximately every seven years. The idea of diverting flood waters at Tuamarina by providing a direct diversion to the sea through the beach ridges was conceptualised back around the 1920s however, limits on resources and machinery meant the mission of excavating this diversion didn't become feasible until the 1960s. In 1964 a 10 m wide pilot channel was cut from the sea to Tuamarina with an initial capacity of $700m^3/s$. It was expected that floods would eventually scour this 'Wairau Diversion' to its design channel width of 150 m. This did take many more years than initially thought but after approximately 50 years with a little mechanical assistance the Wairau Diversion reached an adequate capacity. Using the power of the river to erode the channel out to its design width and depth was a brilliant idea that saved many thousands of dollars in construction costs and it is somewhat ironic that it is that very same concept that is now being used to deal with the aggradation problem that the Wairau Diversion has caused. The introduction of the Wairau Diversion did provide some flood relief to the lower reaches of the river but unfortunately as the Diversion channel was eroding and enlarging the Lower Wairau River was aggrading and reducing in capacity due to its inability to pass its sediment load with reduced flood flows. It is estimated that approximately $2,000,000m^3$ of sediment was deposited on the bed of the Lower Wairau River in the time between the Diversion's introduction in 1964 and 2010, raising the Lower Wairau's bed upwards of 1.5m in some locations. A numerical morphological model (MIKE-11 ST) was used to assess a number of options which led to the decision and resource consent to construct an erodible (fuse plug) bank at the head of the Wairau Diversion to divert more frequent scouring-flows ($+400m^3/s$)down the Lower Wairau River. Full control gates were ruled out on the grounds of expense. The initial construction of the erodible bank followed in late 2009 with the bank's level at the fuse location set to overtop and begin washing out at a combined Wairau flow of $1,400m^3/s$ which avoids berm flooding in the Lower Wairau. In the three years since the erodible bank was first constructed the Wairau River has sustained 14 events with recorded flows at Tuamarina above $1,000m^3/s$ and three of events in excess of $2,500m^3/s$. These freshes and floods have resulted in washout and rebuild of the erodible bank eight times with a combined rebuild expenditure of $80,000. Marlborough District Council's Rivers & Drainage Department maintains a regular monitoring program for the bed of the Lower Wairau River, which consists of recurrently surveying a series of standard cross sections and estimating the mean bed level (MBL) at each section as well as an overall MBL change over time. A survey was carried out just prior to the installation of the erodible bank and another survey was carried out earlier this year. The results from this latest survey show for the first time since construction of the Wairau Diversion the Lower Wairau River is enlarging. It is estimated that the entire bed of the Lower Wairau has eroded down by an overall average of 60 mm since the introduction of the erodible bank which equates to a total volume of $260,000m^3$. At a cost of $$0.30/m^3$ this represents excellent value compared to mechanical dredging which would likely be in excess of $$10/m^3$. This confirms that the idea of using the river to enlarge the channel is again working for the Wairau River system and that in time nature's "excavator" will provide a channel capacity that will continue to meet design requirements.

  • PDF

A Study on the Communication of the Functional Family (기능적인 가족의 커뮤니케이션에 관한 이론적 접근)

  • 조윤경
    • Journal of Families and Better Life
    • /
    • v.2 no.1
    • /
    • pp.131-150
    • /
    • 1984
  • The purpose of this study is to explore the family as an interaction system, concentrating on the mutual influences between communication and family development; (1) how Communication patterns affect family relationships, and (2) how relationships among family members affect communication. In order to do this Galvin, Brommel used the following frame work; family is a system in which communication regulates cohesion and adaptability by a flow of message patterns through a defined network of evolving interdependent relationships. A family system consists of members, the relationships among them, the family attributes, the members attributes and an environment in which family functions. Within the framework of common cultural communication patterns, each family has the capacity to develop its own communication code based on the experiences of individual members and the collective family experience. Most of us develop our communication skills within the family context learning both the general cultural language and the specific familial communication code. Communication may be viewed as a symbolic, transactional process as the process of creating and sharing meanings. To say that communication is a process implies a continuous interaction of an indefinite large numbers of variables with a concomitant,. continuous change in the values taken by these variables. Finally the process implies change, Family functions include the primary functions of cohesion and adaptability, and supporting functions of family images, themes, boundaries, and biosocial issues. The primary functions reveal concepts integrated family interaction and supporting function, along with those of cohesion and adaptability, give shape to family life. the characteristics of developed relationships of richness, uniqueness efficiency, substitutability, pacing , openness spontaneity, and evaluation are reflected in the verbal and nonverbal behaviors with which family members negotiated a set of common meanings and develop thier own unique message system. The message system is the major element of communication process and influences both the form and the content of thier relationship and in create and share meanings. Family systems need to provide order and predictability for thier members, specifically focusing on communication rules and the networks by which messages are transmitted. Most rules emerge as a result of multiful interactions. There are basic rules and rules about rules, or metarules. Perceiving the rules of family system is very difficult because often family members don't think about the basic rules, much less the metarules. Breaking the rule may result in the creation of a new set because the system may recalibrate itself to accept more variety of behavior. Families develop communication networks to deal with the general issue. Family adaptability may be seen through the degree of flexibility in forming and reforming networks and networks become a vital part of the decision- making process and relate to the power dynamics operating within the family. Networks also play an integral part in maintaining the roles and rules operating with the family system. Thus networks and rules have mutual influence. The family -of -origin issues influence all aspects of family communication and account for many of the communication patterns, rules and networks and the role of the family -of-origin influences as a primary force for communication on behavior of newly forming systems. Each family system develops its own communication meanings. There is not one right way to communicate within a family but may be indefinitly large change of family life and communication behavior. Study on functional family communication helps to gain a better understanding of dynamics of family communication and ability of a new insight into the family.

  • PDF