• 제목/요약/키워드: Powder Blasting

검색결과 63건 처리시간 0.067초

신경회로망에 의한 분사가공공정의 표면거칠기 및 재료제거량 예측에 관한연구 (A Study on the prediction of Surface Roughness and Material Removal in Powder Blasting using Neural Network)

  • 김권흡;유우식;박동삼
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2006년도 춘계공동학술대회 논문집
    • /
    • pp.1350-1356
    • /
    • 2006
  • The old technique of sandblasting which has been used for paint or scale removing, deburring and glass decorating has recently been developed into a powder blasting technique for brittle materials, capable of producing micro structures larger than $100{\mu}m$. In this paper, The surface characteristics of powder blasted glass surface were tested under different blasting parameter. Finally, we proposed a predictive model for powder blasting process using a neural network. A detailed analysis of the simulation results has been carried out and compared with experimental results.

  • PDF

Powder Blasting을 이용한 전자부품의 미세버 제거 (Micro-Deburring of Electro-Parts by Powder Blasting)

  • 김광현;최영현;최종순;박동삼;유우식
    • 한국공작기계학회:학술대회논문집
    • /
    • 한국공작기계학회 2002년도 추계학술대회 논문집
    • /
    • pp.314-318
    • /
    • 2002
  • Several types of burrs form on the edges of all machined and stamped parts. These burrs must be removed to prevent interference fits or short circuits, to improve fatigue life or to prevent injury. Despite the full or partial automation of FMC or FMS, deburring operations to obtain workpiece with fine surface quality are difficult to be automated since the occurrence and condition of burr are not constant. This study focused on developing micro-deburring technique for small electro- parts produced by press process. The successful performance was demonstrated by deburring experiment using the powder blasting.

  • PDF

서울 지하철공사 발파공법의 표준화 (Blasting Standardization works for NATM on the Seoul Subway Construction by Dr, Ginn Huh)

  • 허진
    • 기술사
    • /
    • 제16권3호
    • /
    • pp.5-23
    • /
    • 1983
  • On the Seoul Metropolitan Subway Construction of No. 3, 4 Line, the total length is 57 Km and it is now undergoing almost 55% progress. The working method is classified into Open Cut of 70% and the rest of 30% tunnelling method in the 48 job site. Above tunnelling method is execute by American Steel Support System and the rest of 10 job site carried out by New Austria Tunnelling Method. This paper describes Blasting Standardizations works on the above Tunnelling ' Open Cut Method under big slogan, first safety, second execution. As a superintendent, I strived standardization of works with Better powder, Better Drills ' Better Pattern. Geological structure of Seoul area is composed by Jurassic Granite and also the above rockgroup are over burden by Alluviums as a Unconformity. First of all, I carried out the standard amount of powder and burden through experimental standard blasting by each powder as following Blasting works in the subway construction is surrounding shop Building, under pass the city river and also under pass highest building basement floor. I made allowable Blasting Vibration Value by West-Germany Vornorm DIN 4150, Teil 3 and should measure each blasting works as fellows all of powder is used basically Low-Gravity and Low Velocity such as Slurry, Ammonium Nitrate ' Finex I, II. for Smooth Blasting Instead of Gelatin Dynamite. Electric Detonation Cap is used basically M/S Delay Cup instead of Electric delay ' Simultaneous cap. I applied following formula V=KW3/4 $D^{-2}$ V=Particle Velocity (Cm/sec) K=Ginh Huh's Value W=Delay Charge (Kg) D=Distance(m) In the Open Cut, within 1m distance from H-pile I made to use the Concrete breaker, as following V=7W/$^{0.5}$V/$^{-1.75}$ On the Concentrate Building area, I advise to use Light class drill ø36m Bit and advance 1.1m per round blasting the three boom jumbo drill over ø45mm used only suburb of city.e Light class drill ø36m Bit and advance 1.1m per round blasting the three boom jumbo drill over ø45mm used only suburb of city.

  • PDF

The Effect of Pretreatment for Cemented Carbide Substrate Using Wet Blasting

  • Hong, Sung-Pill;Kim, Soo-Hyun;Kang, Jae-Hoon;Yoon, Yeo-Kyun;Kim, Hak-Kyu
    • 한국분말야금학회:학술대회논문집
    • /
    • 한국분말야금학회 2006년도 Extended Abstracts of 2006 POWDER METALLURGY World Congress Part2
    • /
    • pp.1102-1103
    • /
    • 2006
  • The pretreatment for substrate was carried out in change of gun pressure of $0.5\sim3.5$ bar using wet blasting. The size of $Al_2O_3$ powder was about $50{\sim}150{\mu}m$. As the results, the surface roughness of cemented carbide substrate was improved with increment of gun pressure of wet blasting. A new surface layer was formed and Co particles were uniformly distributed over the entire surface after pretreatment. The adhesion of the pretreated substrate in same PVD-TiAlN film was improved and in approximately $Ra=90\sim120\;nm$ shown the best adhesion value.

  • PDF