• 제목/요약/키워드: Post-Environmental Impact Assessment

검색결과 84건 처리시간 0.016초

대기질 영향평가와 예측방법에 대한 개선방향 (A Method of Improving Air Quality Impact Assessment and Prediction)

  • 박종길;원경미;김성수
    • 한국환경과학회지
    • /
    • 제3권2호
    • /
    • pp.77-88
    • /
    • 1994
  • When we conduct environmental impact assessment, main contents consist of summary, project outline, environmental conditions, environmental impacts due to the project, mitigation devices, and alternative measures of harmful impact on environment. In this Paper, to understand how they really conduct air quality impact assessment and prediction and examine their effectiveness, we considered the provisions and actual case of environmental impact assessment in Korea with that in Japan. As a result, we propose a method of improving air quality impact assessment and Prediction, such as reflection of the result in environmental impact assessment, detailed assessment focused on relatively important environmental impact elements, field measurement investigation over four season and seven sucessive days, the uniformity of units, the proper model development to predict environmental concentration and a biennial environmental impact assessment for ex post management.

  • PDF

환경영향평가 협의 시 대체서식지 조성을 위한 가이드라인 마련 (A Study on the Guidelines for Creating Alternative Habitats through Environmental Impact Assessment)

  • 심윤진;박용수
    • 한국환경복원기술학회지
    • /
    • 제22권5호
    • /
    • pp.69-79
    • /
    • 2019
  • The purpose of this study is to suggest a guideline that can be used as a standard for consultation and review by environmental impact assessment consultation and review practitioner to enhance the practical effectiveness of creating alternative habitats. The consultation stage of environmental impact assessment was significantly divided into 1) preparation of draft environmental impact assessment reports and gathering of consensus thereon, 2) preparation of environmental impact assessment reports and consultation thereon, 3) follow-up survey of environmental impacts(under construction) and 4) follow-up survey of environmental impacts(in operation). And it was suggested that the procedures of creating alternative habitat by each consultation stage were linked in order of 1) planning, 2) designing, 3) construction, and 4) post-monitoring and maintenance. The basic principles were also proposed for each stage of consultation on environmental impact assessment and procedure for the creation of alternate habitats. Then, issues and methods to be reviewed by the consulting agency and review agency of environmental impact assessment were presented in detail. The guideline of this study provides important information not only to environmental impact assessment consultation and review practitioner, but also to developers and environmental impact assessment agents who plan, construct, and manage alternative habitats.

Post-2020에 연계한 온실가스 항목의 환경영향평가 개선 방안 (Improvement of EIA Associated with Greenhouse Gases Subject Matter for the Preparedness of Post-2020)

  • 홍상표
    • 환경영향평가
    • /
    • 제28권5호
    • /
    • pp.483-491
    • /
    • 2019
  • 파리 협약에 따른 post-2020에 대비하기 위한 환경영향평가(EIA : Environmental Impact Assessment) 측면에서의 온실가스 감축방안을 모색하였다. 2010~2019년 금강유역환경청의 EIA대상사업 중 26건의 환경영향평가서(EIS : Environmental Impact Statement)를 사례분석한 결과로, '온실가스 항목'은 대부분 형식적으로 작성된 것으로 분석되었다. 본 연구에서는 EIA시 '온실가스 항목'의 형식적 평가를 개선하기 위한 방안으로서, 1) EIA대상사업별 온실가스 배출량에 따른 배출부과금 할당, 2) "환경오염시설의 통합관리에 관한 법률"에 근거한 '허가배출기준 설정'에 '온실가스 항목'의 추가, 3)이해당사자들이 EIA대상 개발사업의 초기단계에 참여하는 거버넌스 확립으로 온실가스 감축 등을 제안하였고, 구체적인 내용을 논의하였다.

주성분분석을 이용한 환경영향평가와 사후환경조사의 비교 및 평가에 관한 사례연구 (A Case Study on the Comparison and Assessment between Environmental Impact Assessment and Post-Environmental Investigation Using Principal Component Analysis)

  • 조일형;김용섭;조경덕
    • 한국환경보건학회지
    • /
    • 제31권2호
    • /
    • pp.134-146
    • /
    • 2005
  • Environmental monitoring system has been adopted and supplemented as inspection measures for the quantitative and qualitative changes of environmental impact assessment (EIA). This study compares the results of environmental impact assessment with the results of post-environmental investigation using a correction and principal component analysis (PCA) in the housing development project. Correlation analysis showed that most of air quality variables including TSP, $PM_{10},\;NO_2$, CO were linearly correlated with each other in the environmental impact assessment and the post-environmental investigation. In the water quality, pH and BOD were well correlated with the DO and SS, respectively. As a result of correlation analysis in the noise and vibration, noise in day and night and vibration in day and night were related to each other between EIA and the post-environmental investigation. From the results of analysis of soil, Cu with Cd, Cu with Pb, and Cd with Pb were related to each other in EIA. Principal component analysis (PCA) showed a powerful pattern recognition that had attempted to explain the variance of a large dataset of inter-correlated variable with a smaller set of independent variables (principal components). Principal component (PC1) and principal component (PC2) were obtained with eigenvalues> 1 summing almost $90\%$ of the total variance in the all of the items(air, water, noise, vibration and soil) in EIA and post-environmental investigation.

환경영향평가상의 효율성 주민의견 수렴에 관한 연구 (A Study of Effective Collection of Public Opinion on Environmental Impact Assessment)

  • 유헌석;주용준;정성훈
    • 환경영향평가
    • /
    • 제11권4호
    • /
    • pp.311-319
    • /
    • 2002
  • Procedures to establish well-balanced development and effectiveness of environmental impact assessment need include various stakeholder's participation in writing and reviewing document of environmental impact assessment, collecting public opinion, and post monitoring. Accordingly, to encourage effective and efficient collection of resident's opinion analyze present conditions and problems and suggest institutional and politic alternative proposals of it. This study resulted in following conclusions. In institutional aspects, (1) Proposal for drafting document of environmental impact assessment (2) Composition of committee for collecting and regulating stakeholder's opinion (3) Width of civil participation scale. In politic aspects, (1) Use of local community (2) Guide of local information from local society and environmental specialist (3) Understandable document and data of environmental impact assessment (4) Strength of roles and duties of local government.

한국에서의 환경영향평가와 환경측정 (Environmental Impact Assessment and Environmental Monitoring in Korea)

  • 강인구;김명진
    • 환경영향평가
    • /
    • 제4권3호
    • /
    • pp.31-39
    • /
    • 1995
  • Environmental Impact Assessment (EIA) is composed of various procedures, such as screening, scoping, inventory survey, prediction, assessment, alternative assessment, mitigation measures, and post management. Environmental monitoring data for air quality or water quality, etc. is applied in the EIA process, especially in prediction and post management. As an effective tool of environmental monitoring, the remote sensing method, introduced recently, was used in collecting nationwide data concerning ecosystem and land use. This article explains the current monitoring status in Korea. Monitoring factors include air quality, water quality, soil, ocean, odor, noise, and ecosystems. This report explains the organization of the environmental monitoring system managed by the Ministry of Environment in Korea. Furthermore, it shows the environmental criteria and environmental policies applied to EIA in Korea.

  • PDF

환경영향평가와 측정 : 환경처 업무 중심으로 (Environmental Impact Assessment and Environmental Monitoring: Monitoring Factors and Organization)

  • 강인구;장준기;한의정;김명진
    • 환경영향평가
    • /
    • 제3권2호
    • /
    • pp.69-75
    • /
    • 1994
  • Environmental Impact Assessment is composed of screening, scoping, inventory survey, prediction, assessment, alternative assessment, mitigation measure, and post management. Environmental monitoring data is applied to EIA process such as prediction and post management. It must he collected and managed systematically for effective applying in EIA process. This article explains factors such as air quality, water quality, soil, ocean, odor, noise & vibration, ecosystem, etc. and organizations of environmental monitoring managed by Ministry of Environment.

  • PDF

환경영향평가와 사후환경조사의 비교에 관한 연구 - 태안화력발전소 사례분석 - (The Study on the Improvement of Environmental Assessment Method through Analysis of Environmental Investigation Results of Taean Thermal Power Plant)

  • 전상기;이성철
    • 환경영향평가
    • /
    • 제9권1호
    • /
    • pp.61-74
    • /
    • 2000
  • This study compares the results of environmental impact assessment with the results of post-environmental investigation, using the case of Taean thermal power plant construction. The atmospheric and water qualities were not greatly changed before and after the construction of the power plant. However, the site of the highest concentration predicted by the atmospheric quality modeling in environmental impact assessment was different from that after operation of 4 power plants. There was also a difference in the diffusion range of thermal discharge water between the measured result(1km) and the predicted value(1.5km) with the model. Thus, environmental impact evaluation should be based on long-term (more than a year) environmental monitoring data. For the modeling of atmospheric quality and numerical thermal discharge water diffusion, appropriate models for each plant should be selected and the numerical modeling should be accompanied by computer simulation, wind tunnel test, etc. Moreover, environmental evaluation should focus more on the degree of impact on surroundings than the prediction of changes in surroundings caused by operation of plants.

  • PDF

해역이용협의제도의 사후환경관리 개선방안 (Improvements of Post-Project Environmental Management for the System of the Sea Area Utilization Consultation)

  • 김귀영;이대인;엄기혁;전경암;강성경
    • 한국해양환경ㆍ에너지학회지
    • /
    • 제16권2호
    • /
    • pp.121-129
    • /
    • 2013
  • 본 연구는 해역이용협의제도의 실효성 확보를 위하여 해양 개발사업의 사후환경관리에 대한 문제점을 파악하고 개선 방안을 제시하였다. 협의내용 이행 및 점검 소홀, 사후관리조치 및 결과보고 미흡, 사후관리 인식저하 및 전문성 부족 등으로 개발사업의 사후관리가 제대로 이루어지지 않고 있으며, 또한 사후 해양환경영향조사의 경우도 사업전후 결과의 검증이 매우 중요한 사항인데도 형식적으로 추진되는 등 사후환경관리에 많은 문제가 나타나고 있다. 따라서 해역 이용협의제도의 실효성을 확보하기 위한 사후환경관리 개선방안으로 관계자들의 사후관리 인식제고 및 이행력 확보가 절실히 요구되며, 갈등해소를 위한 사후관리시스템 구축, 협의내용 미 이행 사항에 대한 제재 및 책임성을 강화해야 하고, 아울러 체계적인 사후 해양환경영향조사 모니터링방안이 정립되어야 할 것이다.

항공사진을 이용한 사전과 사후의 환경영향평가 기법 (Pre/Post-Environmental Impact Assessment Method Using Aerial Photos)

  • 강인준
    • 대한토목학회논문집
    • /
    • 제9권2호
    • /
    • pp.99-105
    • /
    • 1989
  • 본 논문에서는 사전 및 사후의 환경영향평가에 대해 모든 자료의 정확한 보관 및 해석에 대한 가능성을 보여 주고자 한다. 실험에 있어서는 비측정용 카메라를 탑재한 모형비행기를 무선조정으로 얻은 항공사진, 측정용 항공사진 카메라에 의한 항공사진, 그리고 LANDSAT 자료를 영상처리한 항공사진을 사용하였다. 그리고 이 3가지에 대해 기술하였다. 결론적으로, 항공사진측정 방법을 이용한 환경영향평가 방법을 제안하였으며 이것은 기술적이고 경제적인 타당성 아래 보다 정확하고 효율적인 방법이라고 사료된다.

  • PDF