• Title/Summary/Keyword: Post Opening Project Evaluation

Search Result 6, Processing Time 0.022 seconds

Impact of Highway Construction on the Regional Economy: Gangil-Chuncheon Highway (고속도로 건설이 지역경제에 미치는 기여도 분석연구: 강일~춘천 고속도로)

  • Na, Sung-Yong;Lee, Du-Heon;Kim, Hyun-Woo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_3
    • /
    • pp.1183-1190
    • /
    • 2022
  • Recently, the Ministry of Strategy and Finance announced a plan to reduce the proportion of economic evaluation in non-metropolitan areas and strengthen balanced development evaluation through the reorganization of the preliminary feasibility study system. In addition, the social value of the quality of life, such as job, environment, and safety, which may be affected by the implementation of transportation facility investment projects, was reflected as the main item of policy evaluation. In this study, the ripple effect of the project in terms of social value was reviewed for the Gangil-Chuncheon. The effect of highway opening was investigated by reviewing the feasibility report, post-evaluation report, and statistical indicators. Recently, the Gangil-Chuncheon highway is getting used by around 110,000 people per day. The number of tourists in Chuncheon rapidly has increased from 5 million a year to more than 11 million now. In addition, it was confirmed to produce effects such as population migration, net inflow and land price increase, improvement of living convenience, and expansion of emergency medical care. Although this ripple effect was influenced by various socio-economic factors as well as the opening of the highway, it is clear that it is difficult to occur without the opening of the highway. It is judged that the evaluation of indirect benefits and social values due to the opening of the highway can be quantified through continuous research and data construction. Post-evaluation of construction works, including project efficiency evaluation and ripple effect evaluation, is performed for construction works with a construction cost of more than 50 billion won. In the future, we will continuously improve the evaluation system in order to evaluate the indirect benefits and social values of public investment projects.

Clinical evaluation of $Br{\aa}nemark$ Ti-Unite implant and ITI SLA implant in the post maxillary area with sinus elevation technique. (상악동 거상술을 이용하여 구치부에 식립된 $Br{\aa}nemark$ Ti-Unite와 ITI SLA 임플란트의 임상적 평가)

  • Hong, Seong-Bae;Chai, Gyung-Joon;Jung, UI-Won;Kim, Chang-Sung;Chim, Joon-Sung;Choi, Seong-Ho;Cho, Kyoo-Sung;Kim, Chong-Kwan
    • Journal of Periodontal and Implant Science
    • /
    • v.35 no.4
    • /
    • pp.813-822
    • /
    • 2005
  • The predictable outcome of implant placement in the atrophic maxilla with sinus floor elevation procedure(osteotome sinus floor elevation technique and window opening technique) is well documented. Aim of this study was to evaluate the efficacy of $Br{\aa}nemark$ Ti-Unite implant system and ITI SLA implant system placed in the atrophic posterior maxilla with sinus floor elevation procedure. Eighty patients received placement of $Br{\aa}nemark$ Ti-Unite implants(195 implants) in their atrophic posterior Maxilla with sinus floor elevation procedure(153 osteotome sinus floor elevation technique and 42 window opening procedure). Fifty patients received placement of ITI SLA implants(83 implants) in their atrophic posterior Maxilla with sinus floor elevation procedure(77 osteotome sinus floor elevation technique and 6 window opening procedure). Chart review were taken from each patient. The total failed implants were seven and the total implant survival rate was 96.4% in $Br{\aa}nemark$ Ti-Unite system. The total failed implants were one and the total implant survival rate was 98.8% in ITI SLA system. The implant survival rate with osteotome technique was 96% and 97.6% with window opening in $Br{\aa}nemark$ Ti-Unite system. The implant survival rate with osteotome technique was 98.7% and 100% with window opening. The implant survival rate with osteotome technique was 96% and 97.6% with window opening in ITI SLA system. The results of this evaluation show that the placement of $Br{\aa}nemark$ Ti-Unite system as well as ITI SLA system is a reasonable treatment option for patients with the atrophic posterior maxillary area.

Tax Exemption Grant Proposal to Promote Green Remodeling Project Implementation (그린리모델링 사업시행유도를 위한 조세혜택 부여 방안)

  • Jung, Seoyoung;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.66-75
    • /
    • 2016
  • Korean Government is implementing green remodeling projects on existing buildings and structures in a way of promoting low carbon green growth. However, the current regulations and systems do not clearly define the scopes and contents of the green remodeling. Also, the lack of the inducement measure is another reason of the low engagement of the private enterprises to the green remodeling business. Therefore, this study proposes a tax exemption plan to promote green remodeling business implementation, with the consideration on practical applicability. And the proposed plan was applied to the green remodeling pilot project case in2 014 and the effect was quantitatively analyzed. The result is expected to be used as a base data to improve the tax exemption benefit system to invigorate green remodeling later.

Effectiveness Analysis of Preliminary Evaluation of Public Library Establishment Feasibility Based on the Revised Library Act (도서관법 개정에 따른 공공도서관 설립 타당성 사전평가의 실효성 분석)

  • Kim, Hyo-Yoon
    • Journal of Korean Library and Information Science Society
    • /
    • v.53 no.3
    • /
    • pp.119-135
    • /
    • 2022
  • The purpose of this study is to determine whether the pre-evaluation of the feasibility of establishing a public library, which is mandatory according to the revision of the Library Act, can improve the quality of the library. Therefore, the effectiveness of the preliminary evaluation was analyzed through the case analysis of the preliminary evaluation of the public library construction support project, which was implemented for the same purpose before the revision of the Library Act. In the case of libraries built after preliminary evaluation, most of the minimum standards for legal librarians required by the Enforcement Decree of the Library Act were secured, which helped secure basic library personnel. However, there were few libraries that secured and operated as much manpower as originally planned, and in some cases, the application applied to operate the library directly, but it was changed to consignment operation at the time of opening, so the pre-review details were not faithfully reflected. This study proposed re-establishing realistic librarian placement standards according to the revision of the law and introducing a post-evaluation using the library registration system so that it would not be a formal pre-process through case analysis.

Reassessment on the Four Major Rivers Restoration Project and the Weirs Management (4대강 살리기사업의 재평가와 보의 운용방안)

  • Lee, Jong Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.30 no.4
    • /
    • pp.225-236
    • /
    • 2021
  • The master plan for the Four Rivers Restoration Project (June 2009) was devised, the procedure of pre-environmental review (June 2009) and environmental impact assessment (Nov. 2009), and post-environmental impact survey were implemented, and 4 times audits also inspected. and finally the Ministry of Environment's Four Rivers Investigation and Evaluation Planning Committee proposed the dismantling or partial dismantling of the five weirs of the Geum River and Yeongsan River. But controversies and conflicts are still ongoing. Therefore, this study intend to reestablish the management plan for the four major rivers by reviewing and analyzing the process so far. The results are as follows. First, a cost-benefit analysis should be performed by comparing the water quality impact of weir operation and weir opening. Therefore, it is inevitably difficult to conduct cost-benefit analysis. Second, according to the results of cost-benefit analysis on the dismantling of the Geum River and the Yeongsan River, the dismantling of the weir and the regular sluice gate opening was decided. However, there is a problem in the validity of the decision to dismantle the weir because the cost-benefit analysis for maintaining the weir is not carried out. Third, looking at the change in water quality of 16 weirs before and after the Four Major Rivers Restoration Project, COD and Chl-a were generally deteriorated, and BOD, SS, T-N, and T-P improved. However, in the cost-benefit analysis related to water quality at the time of weir dismantling, only COD items were targeted. Therefore, the cost of BOD, SS, T-N, and T-P items improved after the project were not reflected in the cost-benefit analysis of dismantling weirs, so the water quality benefits were exaggerated. Fourth, in the case of Gongju weir and Juksan weir, most of them are movable weirs, so opening the weir alone can have the same effect as dismantling when the water quality deteriorates. Since the same effect can be expected, there is little need to dismantle the weirs. Fifth, in order to respond to frequent droughts and floods, it is desirable to secure the agricultural water supply capacity to the drought areas upstream of the four majorrivers by constructing a waterway connected to the weir. At present it is necessary to keep weirs rather than dismantling them.

Data issue and Improvement Direction for Marine Spatial Planning (해양공간계획 지원을 위한 정보 현안 및 개선 방향 연구)

  • CHANG, Min-Chol;PARK, Byung-Moon;CHOI, Yun-Soo;CHOI, Hee-Jung;KIM, Tae-Hoon;LEE, Bang-Hee
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.21 no.4
    • /
    • pp.175-190
    • /
    • 2018
  • Recently, policy of the marine advanced countries were switched from the preemption using ocean to post-project development. In this study, we suggest improvement and the pending issues when are deducted to the database of the marine spatial information is constructed over the GIS system for the Korean Marine Spatial Planning (KMSP). More than 250 spatial information in the seas of Korea were processed in order of data collection, GIS transformation, data analysis and processing, data grouping, and space mapping. It's process had some problem occurred to error of coordinate system, digitizing process for lack of the spatial information, performed by overlapping for the original marine spatial information, and so on. Moreover, solution is needed to data processing methods excluding personal information which is necessary when produce the spatial data for analysis of the used marine status and minimized method for different between the spatial information based GIS system and the based real information. Therefore, collection and securing system of lacking marine spatial information is enhanced for marine spatial planning. it is necessary to link and expand marine fisheries survey system. It is needed to the marine spatial planning. The marine spatial planning is required to the evaluation index of marine spatial and detailed marine spatial map. In addition, Marine spatial planning is needed to standard guideline and system of quality management. This standard guideline generate to phase for production, processing, analysis, and utilization. Also, the quality management system improve for the information quality of marine spatial information. Finally, we suggest necessity need for the depths study which is considered as opening extension of the marine spatial information and deduction on application model.