• 제목/요약/키워드: Pollutant delivery ratio

검색결과 25건 처리시간 0.031초

낙동강 오염총량관리 단위유역 유달율 경험공식 (Empirical Equation for Pollutant Loads Delivery Ratio in Nakdong River TMDL Unit Watersheds)

  • 김문성;신현석;박주현;김상단
    • 한국물환경학회지
    • /
    • 제25권4호
    • /
    • pp.580-588
    • /
    • 2009
  • In this study daily flow rates and delivered pollutant loads of Nakdong river basin are simulated with modified TANK model and minimum variance unbiased estimator. Based on the simulation results, flow duration curves, load duration curves, and delivery ratio duration curves have been established. Then GIS analysis is performed to obtain several hydrological geomorphic characteristics such as watershed area, stream length, watershed slope and runoff curve number. Finally, multiple regression analysis is carried out to estimate empirical equations for pollutants delivery ratio. The results show that there is positive relation between the flow rates and delivery ratios, and the proposed empirical formulas for delivery ratio can predict well river pollutant loads.

HSPF 모형을 이용한 옥동천 유역의 유달율 분석 (Pollutant Delivery Ratio of Okdong-cheon Watershed Using HSPF Model)

  • 이현지;김계웅;송정헌;이도길;이한필;강문성
    • 한국농공학회논문집
    • /
    • 제61권1호
    • /
    • pp.9-20
    • /
    • 2019
  • The primary objective of this study was to analyze the delivery ratio using Hydrological Simulation Program - Fortran (HSPF) in Okdong-cheon watershed. Model parameters related to hydrology and water quality were calibrated and validated by comparing model predictions with the 8-day interval filed data collected for ten years from the Korea Ministry of Environment. The results indicated that hydrology and water quality parameters appeared to be reasonably comparable to the field data. The pollutant delivery loads of the watershed in 2015 were simulated using the HSPF model. The delivery ratios of each subwatershed were also estimated by the simple ratio calculation of pollutant discharge load and pollutant delivery load. Coefficients of the regression equation between the delivery ratio and specific discharge were also computed using the delivery ratio. Based on the results, multiple regression analysis was performed using the discharge and the physical characteristics of the subwatershed such as the area. The equation of delivery ratio derived in this study is only for the Okdong-cheon watershed, so the larger studies are needed to apply the findings to other watersheds.

추령천 유역의 유황별 유달율 계산 (Pollutant Load Delivery Ratio for Flow Duration at the Chooryeong-cheon Watershed)

  • 김영주;윤광식;손재권;최진규;장남익
    • 한국농공학회논문집
    • /
    • 제52권4호
    • /
    • pp.19-26
    • /
    • 2010
  • To provide the basic information for the water quality management of the Sumjin River Basin, delivery ratios for flow duration were studied. Using the day-interval data set of discharge and water quality observed from the Chooryeong-cheon watershed, the flow-duration and discharge-load relation curves for the watershed were established, then the load-duration curve was constructed. Delivery ratios for flow duration were also developed. Delivery ratios showed wide variation according to flow conditions. In general, delivery ratio of high flow condition showed higher value reflecting nonpoint source pollution contribution from the forest dominating watershed. To resolve this problem, a regression model explaining the relation between flow rate and delivery ratio was suggested. The delivery ratios for different flow regime could be used for pollutant load estimation and TMDL (Total maximum daily load) development.

회귀식을 이용한 황룡A 유역에서의 유황별 유달율 산정 (Estimation of Pollutant Loads Delivery Ratio by Flow Duration Using Regression Equation in Hwangryong A Watershed)

  • 정재운;윤광식;주석훈;최우영;이용운;류덕희;이수웅;장남익
    • 한국농공학회논문집
    • /
    • 제51권6호
    • /
    • pp.25-31
    • /
    • 2009
  • In this study, pollutant loads delivery ratio by flow duration in Hwangryoung A watershed was estimated. The delivery ratio was estimated with measured data by Ministry of Environment(MOE) and the regression equation based on geomorphic parameters. Eight day interval flow data measured by the MOE were converted to daily flow to calculate daily load and flow duration curve by correlating data of neighboring station which has daily flow data. Regression equation developed by previous study was tested to study watershed and found to be satisfactory. The delivery ratios estimated by two methods were compared. For the case of Biochemical oxygen demand(BOD), the delivery ratios of low flow condition were 7.6 and 15.5% by measured and regression equation, respectively. Also, the delivery ratios of Total phosphorus(T-P) for normal flow condition were 13.3 and 6.3% by measured and regression equation, respectively.

물리적 기반의 유역모형을 이용한 오염물질 유달 특성 규명 (Investigation on the Pollutant Delivery Characteristics using Physically Based Watershed Model)

  • 김철겸;김남원
    • 한국물환경학회지
    • /
    • 제25권2호
    • /
    • pp.256-267
    • /
    • 2009
  • A method of estimating pollutant delivery ratios considering watershed physical and meteorological characteristics and flow conditions using SWAT-K watershed model was described, and pollutant delivery characteristics during dry and rainy seasons, for monthly and seasonally, and with flow regimes were investigated for the Chungju dam watershed. Delivery ratios for sediment, T-N, and T-P showed higher values over 100% during dry and winter seasons with low pollutant loads and flows, and showed relatively uniform ones under 100% during rainy and summer seasons with concentrated loads and flows. It was found that mainly wet flows during summer seasons played very important roles in investigating the delivery characteristics of total or nonpoint pollutant loads, because more than 90% of total loads were influenced by nonpoint source, and discharged with the flows. From the results, we could find out the delivery characteristics with various watershed and flow conditions which are difficult to consider by actual measurement, and could get a foothold of estimating more reasonable and scientific allocated loads for water quality standard using the reliable method of estimating delivery ratios with a watershed model.

농촌유역 유량-유달율 단순회귀식을 이용한 주암호 상류유역의 유달율 추정가능성 평가 (Evaluation of Flow-Pollutant Load Delivery Ratio Equations on Main Subwatersheds within Juam Lake)

  • 정재운;임병진;최동호;최유진;이경숙;김영주;김갑순;장남익;윤광식
    • 한국환경과학회지
    • /
    • 제21권10호
    • /
    • pp.1235-1244
    • /
    • 2012
  • The objective of this study is to evaluate Flow-Pollutant load delivery ratio equations developed from rural watershed on main subwatersheds within Juam Lake. Two regression equations for BOD and three equations for T-P were evaluated on Bosung cheon, Dongbok cheon, Songgwang cheon, Naenam cheon, and Sinpyeon cheon. The results show that estimation of BOD delivery ratio using flow-delivery equation is reliable when relative composition of discharge load of pollutant sources of a watershed is similar to those of watershed where the equation developed. On the other hand, application of regression equation for T-P was feasible when the landuse pattern and relative composition of discharge load of pollutant sources of a watershed is similar to those of watershed where the equation developed.

유량-부하량관계식을 이용한 주암호 외남천 유역의 유황별 유달율 산정 (Estimation of Pollutant Load Delivery Ratio for Flow Duration Using L-Q Equation from the Oenam-cheon watershed in Juam Lake)

  • 최동호;정재운;이경숙;최유진;윤광식;조소현;박하나;임병진;장남익
    • 한국환경과학회지
    • /
    • 제21권1호
    • /
    • pp.31-39
    • /
    • 2012
  • The objective of this study is to provide pollutant loads delivery ratio for flow duration in Oenam-cheon watershed, which is upstream watershed of Juam Lake. To calculate the delivery ratio by flow duration, rating curves and discharge-loads curves using measured data were established, then Flow Duration Curve(FDC) and pollutant loads delivery ratio curves were constructed. The results show that the delivery ratios for $BOD_5$ for abundant flow($Q_{95}$), ordinary flow($Q_{185}$), low flow($Q_{275}$), and drought flow($Q_{355}$) were 23.9, 12.7, 7.1, and 2.9%, respectively. The delivery ratios of same flow regime for T-N were 58.4, 31.2, 17.2 and 7.1%, respectively. While, the delivery ratios T-P were 17.3, 7.5, 3.4, and 1.1% respectively. In general, delivery ratio of high flow condition showed higher value due to the influence of nonpoint source pollution. Based on the study results, generalized equations were developed for delivery ratio and discharge per unit area, which could be used for ungaged watershed with similar pollution sources.

팔당호 상류의 단위유역별 오염물질 유출특성 분석을 통한 중점관리 오염원 선정 (Determination of Focused Control Pollutant Source by Analysis of Pollutant Delivery Characteristics in Unit Watershed Upper Paldang Lake)

  • 김동우;장미정;한인섭
    • 대한환경공학회지
    • /
    • 제36권5호
    • /
    • pp.367-377
    • /
    • 2014
  • 국내 최대 상수원인 팔당호는 하천형 호소로 분류되며, 팔당호 수질은 외부오염원의 영향이 크다. 이에 본 연구에서는 팔당호 상류지역의 오염원 분포와 오염물질 유출특성을 분석하여 BOD와 TP 관리를 위한 중점관리 오염원을 선정하고자 하였다. 이를 위해 11개 단위유역에 대한 오염원별 발생부하량과 배출부하량을 조사하고, 74개 소하천의 수질 유량 측정결과를 이용하여 유달부하량과 유역면적당 유달부하 밀도를 분석하였다. 오염원별 BOD, TP 발생부하량과 배출부하량, 유달부하량을 분석한 결과, BOD 발생부하량은 축산계가 66.0%로 가장 높은 비율을 차지하였고, BOD 배출부하량은 생활계가 42.7%를 차지하였으며, BOD 유달부하량은 축산계와 생활계가 각각 36.4%, 34.3%를 차지하는 것으로 나타났다. TP 발생부하량과 배출부하량, 유달부하량 모두 축산계에서 가장 높은 비율을 차지하였으며, 각각 82.5%, 44.4%, 46.7%로 나타났다. 또한 BOD 유달부하밀도는 인구밀도가 높은 경안천 유역이 $14.6kg/km^2/d$으로 가장 높았고, TP 유달부하밀도는 가축사육두수가 많은 청미천 유역이 $1.23kg/km^2/d$이 가장 높게 나타났다. 이러한 연구결과를 통해 팔당호 수질개선을 위해서는 생활오수와 가축분뇨를 중심으로 오염원관리가 필요하며 경안천 유역은 생활오수에 대한 관리가 필요하고 남한강 유역, 특히 청미천 유역은 가축분뇨에 대한 관리가 필요한 것으로 판단되었다.

수질오염총량관리계획 수립을 위한 유달부하량 추정방법 연구 (A Study on Estimated Pollutant Delivery Load for the Basic Plan of TPLC)

  • 황하선;이한필;안기홍;박지형;김용석;이성준
    • 한국물환경학회지
    • /
    • 제32권4호
    • /
    • pp.375-383
    • /
    • 2016
  • Total Pollution Load Control (TPLC) calculates and manages the allowable pollutant load that is discharged from the watershed, which can meet the water quality target. Delivery Ratio (DR) is generally used for predicting the variation of pollutant mass balance between the pollutants discharged from the watershed and a certain point in the stream, and it is very important for estimation of accurate allowable pollutant load. The concept of DR in TPLC is different from prevalent DR, because DR in TPLC includes both the discharge of pollutants from the watershed and the delivery mechanism. Therefore, DR in TPLC should be estimated by using a proper and unified methodology. The appropriate method and equation for estimation of DR in TPLC was developed through the review of various methodologies, and the applicability of the equation was evaluated in a study area (Geumho A). Determination coefficients (R2) of regression were shown to be relatively high (BOD 0.71~0.87, T-N 0.86~0.90, T-P 0.62~0.69). Applicability of the developed methodology and equations was evaluated as appropriate for TPLC, and it is suggested.

수질오염총량관리계획 수립을 위한 유달율 적용방안 검증 연구 (A Study on Verification of Delivery Ratio Methodology for Basic Plan at TPLMs(Total Pollutant Load Management System))

  • 이성준;이한필;박지형;김용석;황하선
    • 대한환경공학회지
    • /
    • 제39권12호
    • /
    • pp.714-722
    • /
    • 2017
  • 수질오염총량관리제도(이하 총량제)는 하천의 목표수질을 달성하기 위해 유역에서 배출되는 오염물질의 총량을 관리하는 제도이다. 유역에서 배출되는 오염물질의 허용총량은 수질모델을 활용하여 산정하며, 이과정에서 오염부하량은 발생, 배출, 유달부하량으로 구분할 수 있다. 유달부하량은 배출부하량과 유달율의 곱으로 계산되며 유달율은 유역에서 배출된 오염물질이 하천의 특정지점에 도달하는 비율로 정의된다. 본 연구에서는 Hwang(2016) 등이 제시한 기준유량 조건의 유달율 추정방법을 영강유역에 적용하고 QUALKO2 수질모델의 수질 입력자료를 생성하여 기준유량 조건의 유달율 산정방법(식 (3))과 평균 개념의 유달율 산정 방법(식 (2))의 비교분석을 통해 유달율 추정방법에 대한 검증 연구를 수행하였다. 연구결과, 유달율 함수식은 식 (2)와 식 (3) 모두 사용 가능하나, 배출계수 적용에 따라 방법론을 달리할 필요가 있다. 식 (2)를 사용할 경우는 배출계수를 저수량, 평수량 구분없이 1로 동일하게 사용해야 하며, 식 (3)을 사용할 경우는 기술지침에서 정한 배출계수(저수량 0.15, 평수량 0.5)를 적용해야 할 것으로 판단된다.