• Title/Summary/Keyword: Policy Delay

Search Result 309, Processing Time 0.03 seconds

Optimal Stochastic Policies in a network coding capable Ad Hoc Networks

  • Oh, Hayoung
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.8 no.12
    • /
    • pp.4389-4410
    • /
    • 2014
  • Network coding is a promising technology that increases system throughput by reducing the number of packet transmissions from the source node to the destination node in a saturated traffic scenario. Nevertheless, some packets can suffer from end-to-end delay, because of a queuing delay in an intermediate node waiting for other packets to be encoded with exclusive or (XOR). In this paper, we analyze the delay according to packet arrival rate and propose two network coding schemes, iXOR (Intelligent XOR) and oXOR (Optimal XOR) with Markov Decision Process (MDP). They reduce the average delay, even under an unsaturated traffic load, through the Holding-${\chi}$ strategy. In particular, we are interested in the unsaturated network scenario. The unsaturated network is more practical because, in a real wireless network, nodes do not always have packets waiting to be sent. Through analysis and extensive simulations, we show that iXOR and oXOR are better than the Distributed Coordination Function (DCF) without XOR (the general forwarding scheme) and XOR with DCF with respect to average delay as well as delivery ratio.

Improvement of the delay declaration of the traffic insurance accident -focus on a business truck- (자동차 보험사고 지연신고 개선방안연구 -사업용화물자동차를 중심으로-)

  • Lee, Seog-Hyeon;Jung, Jae-Jung;Lee, Jong-Eun;Kwon, Young-Jin;Kang, Kyong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.04a
    • /
    • pp.557-564
    • /
    • 2013
  • This study investigates the delay declaration of the traffic insurance accident which is focused on a business truck causing the traffic insurance accident. The type of the delay declaration is classified as 15 types and it differs in level of payment of insurance money. It is most important that the support policy of government and the self-help of related business to reduce the delay declaration and pursue progressive solution. Moreover, it is essential not only introducing the strict regulation system but also adapting the various victim protection system.

  • PDF

Downtime Optimization for Fishing Vessel Equipment Using Delay Time Analysis

  • Jung, Gi-Mun;Kwon, Young-Sub;Anand Pillay;Jin Wang
    • International Journal of Reliability and Applications
    • /
    • v.2 no.2
    • /
    • pp.99-105
    • /
    • 2001
  • Delay time analysis is a pragmatic mathematical concept readily embraced by engineers which has been developed as a means to model maintenance decision problem. This paper considers an inspection period using delay time analysis for fishing vessel equipment. We assume that delay time has a Weibull distribution. In this paper, we determine the optimal inspection period which minimize the expected downtime per unit time. Explicit solutions for the optimal inspection are presented for illustrative purposes.

  • PDF

Inventory policy comparison on supply chain network by simulation technique

  • Park, Nam-Kyu;Choi, Woo-Young
    • Journal of Navigation and Port Research
    • /
    • v.34 no.2
    • /
    • pp.131-136
    • /
    • 2010
  • The aim of the paper is to solve the problem of customer reduction due to the difficulty of parts sourcing which impacts production delay and delivery delay in SC networks. Furthermore, this paper is to suggest the new inventory policy of MTS in order to solve the problem of current inventory policy. In order to compare two policies, a LCD maker is selected as a case study and the real data for 2007 years is used for simulation input. The maker uses MTO policy for parts sourcing which has the problem of lead time even if it has some advantage of inventory cost. Based on current process. The simulation program of AS-IS model and TO-BE model using ARENA 10 version is developed for evaluation. In a result, the order number of two policies shows that MTO is 52 and MTS is 53. However the quantity of order shows big difference such that MTO is 168,460 and MTS is 225,106. Particularly, the lead time of new inventory policy shows much shorter that that of MTO such that MTO 100 is days and MTS is 16 days. In spite of short lead time by MTS policy, new policy has to take burden of inventory cost per year. Total inventory cost per year by MTS policy is US$ 11,254 and each part inventory cost is that POL is US$ 1,807, LDI is US$ 2,166 and Panel is US$ 7,281. The implication of the research is that the company has to consider the cost and the service simultaneously in deciding the inventory policy. In the paper, even if the optimal point of deciding is put into tactical area, the ground of decision is suggested in order to improve the problem in SC networks.

CONSTRUCTION SCHEDULE DELAY RISK ASSESSMENT BY USING COMBINED AHP-RII METHODOLOGY FOR AN INTERNATIONAL NPP PROJECT

  • HOSSEN, MUHAMMED MUFAZZAL;KANG, SUNKOO;KIM, JONGHYUN
    • Nuclear Engineering and Technology
    • /
    • v.47 no.3
    • /
    • pp.362-379
    • /
    • 2015
  • In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs.

Critical Factors Causing Delay on State-Funded Construction Projects in Vietnam

  • Luu, Van Truong;Kim, Soo-Yong;Pham, Nguyen-The-Thanh;Nguyen, Thanh-Long;Nguyen, Tuan-Kiet
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.104-108
    • /
    • 2015
  • Delay on State-Funded Construction Projects (SFCPs) in Dong Thap - a province in Mekong Delta of Vietnam, as many provinces of Vietnam, have caused budget overrun through many recent years. The budget-overrun situations, in turn, have deepened the delay. Identifying critical factors affecting delay SFCPs plays a key role to mitigate negative impact of delay. 134/160 questionnaires were collected from personals working for project owners, consultants, supervisors and contractors in Dong Thap Province. Convenient sampling method was used. EFA was resulted in critical 04 factors with 20 variables caused delay in SFCPs, including: "Project technic, contractor's financial capacity and adjustment role of the government", "Regulation and Policy", "Mutual benefit support and concern between the government and residents", and "Disadvantage of construction site and weather season". Reliable measures to reduce delay on SFCPs are discussed to establish legal corridors to strictly controlling the process, consider mutual benefit between the government and its residents, and evaluating construction conditions. Those measures are considered could be applied in not only Dong Thap province, but most provinces of Vietnam as well.

  • PDF

Periodic Packet Discard Policy for Frame Based Scheduler (프레임 기반 스케줄러를 위한 주기적 패킷 폐기 기법)

  • Lee, Sung-Hyung;Lee, Hyun-Jin;Cha, Jae-Ryong;Kim, Jae-Hyun;Kum, Dong-Won;Baek, Hae-Hyeon;Shin, Sang-Heon;Jun, Jehyun
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.38B no.2
    • /
    • pp.97-104
    • /
    • 2013
  • This paper introduces waiting time based periodic packet discard policy for frame based scheduler. This policy can be used with conventional packet discard policy or buffer management schemes, such as drop-tail or random early detection. Proposed discard policy discards packets, which are stayed in the buffer longer than threshold, at every period of scheduling. This decision of discard is based on waiting time of packet. In this paper, mathematical analysis is performed with situation of network congestion. Also, the simulation is performed to evaluate the performance of proposed discard policy. In the result, proposed discard policy can limit queuing delay by threshold. Also, if the packet discard is performed before scheduling and threshold is set with smaller value than frame length, it can limit the throughput of traffic.

Delay characteristics of speech packets in virtual cellular network(VCN) (가상 셀룰라 망(VCN)에서의 음성 패킷 지연 특성)

  • 정명순;김화종
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.23 no.9A
    • /
    • pp.2305-2312
    • /
    • 1998
  • This paper analyzed the delay characteristics of speech packets in virtual cellular network(VCN). The probability distribution of packet delay is obtained using the markov chain model when periodic speech packets are transmitted by slotted-ALOHA protocol. The effects of probility of capture and retransmission policy on the performance were also analyzed. At first, the probability cumulative function of packet delay is calculated from the probability of capture as a function of location of mobile terminal. In order to investigate the effects of backoff delay, we defined a parameter NPr, where N is the period (frame size) of the speech packets and Pr is the retransmission probability for each speech packet. We also obtained the 1% outage delay for various frame size N.

  • PDF

Applicability of Appropriateness Evaluation Protocol and Delay Tool (적절성 평가지침과 이유목록의 적용 가능성 평가)

  • Shin, Youngsoo;Kim, Yong-Ik;Kim, Chang-Yup;Kim, Yoon;Kim, Eun Gyung;Song, Yun Mi;Lee, Young Seong
    • Quality Improvement in Health Care
    • /
    • v.1 no.1
    • /
    • pp.96-108
    • /
    • 1994
  • Background: An appropriate use of hospital beds can improve productivity of hospital significantly. The authors' previous study revealed that approximately one third of Korean hospital bed days and one sixth of admissions were inappropriately used, when it was measured by Appropriateness Evaluation Protocol(AEP) and Delay Tool modified into Korean situation by the authors. This study aims to evaluate applicability of the instruments in a new hospital. More specifically the study aims to measure appropriateness of the instruments used by newly trained nurse reviewers at a new hospital setting. Methods: In order to evaluate applicability of these instruments, agreement rates of the scores recorded by newly trained nurse reviewers with by skilled nurse reviewer and also compared with the scores recorded by physician's implicit decision were assessed. Agreement rates were derived from concurrent application of AEP and Delay Tool to 52 admissions and 104 patient days from internal medicine, pediatrics, and general surgery of one university hospital. Overall agreement rate, specific nonacute agreement rate, and kappa statistics were used to indicate level of agreement. Results: Overall agreement rates on appropriateness between newly trained nurse reviewers and skilled nurse reviewer were 100% in admission and 98% in bed days. Overall agreement rates on reason for inappropriateness between newly trained nurse reviewers and skilled nurse reviewer were 96% in admission and 91% in bed days. Overall agreement rates between newly trained nurse reviewers and physician reviewer were 86% in admission and 87% in bed days. Conclusion: Results indicated that AEP and Delay Tool were applicable to a new hospital in detecting inappropriate utilization of beds and reasoning of the inappropriateness. These instruments could contribute to enhance efficiency of hospital use, through continuous monitoring of level of inappropriate hospital use at national or individual hospital level.

  • PDF

Towards an Innovation Policy in the Post Catch-Up Era

  • Hwang, Hye-Ran;Choung, Jae-Yong
    • Asian Journal of Innovation and Policy
    • /
    • v.2 no.1
    • /
    • pp.1-19
    • /
    • 2013
  • As the catch-up innovation system was exposed to a new competition environment in which second-tier catch-up countries reduced the gap with Korea and advanced Korean firms entered into the frontier product market, it is experiencing system delay in terms of organizational and policy change. Therefore, innovation policy needs to be reorganized from a dynamic perspective to analyze the problems in the transition period and enable the system to overcome organizational and institutional delays. This article investigates the characteristics of transition periods in terms of external environment changes and internal socio-economic pressures. Based on the analysis of environment changes and catch-up system characteristics, it suggests the framework for policy intervention, direction, and practical principles for post catch-up innovation policy. In particular, it suggests the network-based developmental state and policy implementation in order to overcome the limitation of centralized developmental state of catch-up periods.