• Title/Summary/Keyword: Point of view of the arc

Search Result 69, Processing Time 0.023 seconds

Development of Monitoring Program for Detecting Current and Voltage Signals for Series Arc (직렬아크에 대한 전류 및 전압 신호분석이 가능한 Monitoring Program 개발)

  • Kim, Doo-Hyun;Park, Jong-Young;Kim, Sung-Chul;Lee, Jong-Ho
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.2
    • /
    • pp.29-34
    • /
    • 2010
  • This paper is aimed to develop monitoring software for detecting the characteristics of current and voltage signals for series arc on electric wire. In order to attain this purpose, the characteristics of series arc were analyzed by the current and voltage signals on electric wire which were installed, and also analyzed by the changes of RMS, instantaneous of waveform value in time domain and THD in frequency domain. Monitoring program which analyze the signal was developed by Labview which can analyze in time domain and frequency domain, and save data. Experimental setup for detecting verification of monitoring program was composed loads of a lamp, an electric heater and an electric fan loads which were usually using. Measurement points for detecting verification of monitoring program were selected at both the panel board and the arc generator at the same time. As results of the experiments by monitoring program, the arc current waveform showed the same characteristic in all measurement points of all load. But the arc voltage waveform was different in each measurement point. When arc occurred, the THD of current value increased above 20%. The results of this study will be effectively used in developing the preventive system of electric fire by series arc.

The three-dimensional temporal behavior measurement of light emitted from plasma display panel by the Scanned Point-Detecting System (Scanned Point-Detecting System을 이용한 플라즈마 디스플레이 패널에서 방출되는 광의 3차원 시간 분해 측정)

  • 최훈영;이석현;이승걸;김준엽
    • Korean Journal of Optics and Photonics
    • /
    • v.13 no.6
    • /
    • pp.559-563
    • /
    • 2002
  • We measure the 3-dimensional temporal behavior of the light emitted from the discharge cell of a plasma display panel (PDP) by using a scanned point detecting system. The light signal detected by a PM tube is sent to the oscilloscope, and the oscilloscope is connected to a PC with GPIB. From the resultant temporal behaviors, we could analyze the discharge characteristics of the panel with a Ne-Xe (4%) mixing gas at a 400 torr pressure. The top view of the panel shows that discharge moves from the inner edge of the cathode electrode to the outer cathode electrode, forming an arc shape. The side view of the panel shows that the light is detected up to 150 $\mu\textrm{m}$ up the barrier rib. After a trigger pulse is applied, peak intensity is detected at 730 ns and peak intensity position is located at the center of the ITO electrodes.

Analysis of the Characteristics of NPS Runoff and Application of L-THIA model at Upper Daecheong Reservoir (대청호 상류 유역의 비점오염원 유출특성 분석 및 L-THIA 모형 적용성 평가)

  • Shin, Min-Hwan;Lee, Jae-An;Cheon, Se-Uk;Lee, Yeoul-Jae;Lim, Kyoung-Jae;Choi, Joong-Dae
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.52 no.1
    • /
    • pp.1-11
    • /
    • 2010
  • Generation and transportation of runoff and pollutant loads within watershed generated eutrophication at Daecheong reservoir. To improve water quality at Daecheong reservoir, the best management practices should be developed and applied at upper watersheds for water quality improvement at downstream areas. In this study, two small watersheds of upper Daecheong reservoir were selected. The Long-Term Hydrologic Impact Assessment (L-THIA) model has been widely used for the estimation of the direct runoff worldwide. To apply the L-THIA ArcView GIS model was evaluated for direct runoff and water quality estimation at small watershed. And the Web-based Hydrograph Analysis Tool (WHAT) was used for direct runoff separating from total flow. As a result, the $R^2$ (Coefficient of determination) value and Nash-Sutcliffe coefficient value for direct runoff comparison at An-nae watershed were 0.81 and 0.71, respectively. And the $R^2$ value and Nash-Sutcliffe coefficient value at Wol-oe were 0.95 and 0.93. The $R^2$ value of BOD, TOC, T-N and T-P at An-nae watershed were BOD 0.94, TOC 0.81, T-N 0.94 and T-P 0.89. And the $R^2$ value of BOD, TOC, T-N and T-P at Wol-oe watershed were BOD 0.80, TOC 0.93, T-N 0.86 and T-P 0.65. The result that estimated pollutant loadings using the L-THIA ArcView GIS model reflected well the measured pollutant loadings except for T-P in Wol-oe watershed. With L-THIA ArcView GIS model, the direct runoff and non-point pollutant (NPS) loadings in the watershed could be analyzed through simple input data such as daily rainfall, land uses, and hydrologic soil group.

Calculation of Pollutant Loadings from Stream Watershed Using Digital Elevation Model and Pollutant Load Unit Factors (발생부하원단위와 수치표고모형을 이용한 하천유역 오염부하량 산정)

  • Yang, Hong-Mo;Kim, Hyuk
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.29 no.1
    • /
    • pp.22-31
    • /
    • 2001
  • The purpose of this study is to compare calculated pollutant loadings using pollutant load unit factors and vector type coverage, and expected mean concentration(EMC) and raster type of digital elevation model(DEM). This study is also focusing on comparison of the advantages and the disadvantages of the two methods, and seeking for a method of calculation of pollutant loadings using DEM. Estimation of pollutant inputs using pollutant load unit factors has limitations in identifying seasonal variations of pollutant loadings. Seasonal changes of runoffs should be considered in the calculation of pollutant loadings from catchments into reservoirs. Evaluation of pollutant inputs using runoff-coefficient and EMC can overcome these drawbacks. Proper EMC and runoff-coefficient values for the Koeup stream catchments of the Koheung estuarine lake were drawn from review of related papers. Arc/Info was employed to establish database of spatial and attribute data of point and non-point pollutant sources and characteristics of the catchments. ArcView was used to calculate point and non-point pollutant loadings. Pollutant loads estimated with either unit factors-coverages, i.e., pollutant load unit factors and vector coverages f point sources and land use, or EMC and digital elevation mode(DEM) were compared with stream monitoring loads. We have found that some differences were shown between monitoring results and estimated loads by Unit Factors-Coverage and EMC-DEM. Monthly variations of pollutant loads evaluated with EMC-DEM were similar to those with monitoring result. The method using EMC-DEM can calculate accumulated flows and pollutant loads and can be utilized to identify stream networks. A future research on correcting the difference between vector type stream using flow direction grid and digitalizing vector type should be conducted in order to obtain more exact calculation of pollutant loadings.

  • PDF

Database and User Interface for Pollutant Source and Load Management of Yeungsan Estuarine Lake Watershed Using GIS (GIS를 활용한 영산호 수계 오염원 데이터베이스 구축과 오염원관리 사용자 인터페이스)

  • 양홍모
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.28 no.6
    • /
    • pp.114-126
    • /
    • 2001
  • The purpose of this study is to establish the databases of pollutant sources and water quality measurement data by utilizing GIS, and making the user interface for the management of pollutant sources. Yeongsan Estuarine Lake was formed of a huge levee of 4.35 km constructed by an agricultural reclamation project. Water quality of the reservoir has been degraded gradually, which mainly attributes to increase of point and non-point source pollutant loads from the lake's watershed of 33,374.3 $\textrm{km}^2$ into it. Application of GIS to establishment of the database was researched of pint source such as domestic sewage, industrial wastewater, farm wastes, and fishery wastes, and non-pont source such as residence, rice and upland field, and forest runoffs of the watershed of the lake. NT Acr/Info and ArcView were mainly utilized for the database formation. Land use of the watershed using LANDSAT image data was analyzed for non-point source pollutant load estimation. Pollutant loads from the watershed into the reservoir were calculated using the GIS database and BOD, TN, TP load units of point and non-point sources. Total BOD, TN, TP loads into it reached approximately to 141, 715, 2,094 and 4,743 kg/day respectively. The loads can be used as input parameters for water quality predicting model of it. A user-friendly interface program was developed using Dialog Designer and Avenue Script of AcrView, which can perform spatial analysis of point and non-point sources, calculate pollutant inputs from the sources, update attribute data of them, delete and add point sources, identify locations and volumes of water treatment facilities, and examine water quality data of water sampling points.

  • PDF

Experiences with Simulation Software for the Analysis of Inverter Power Sources in Arc Welding Applications

  • Fischer W.;Mecke H.;Czarnecki T.K.
    • Proceedings of the KIPE Conference
    • /
    • 2001.10a
    • /
    • pp.731-736
    • /
    • 2001
  • Nowadays various simulation tools are widely used for the design and the analysis of power electronic converters. From the engineering point of view it is rather difficult to parameterize power semiconductor device models without the knowledge of basic physical parameters. In recent years some data sheet driven behavioral models or so called 'wizard' tools have been introduced to solve this problem. In this contribution some experiences with some user-friendly power semiconductor models will be discussed. Using special simulation test circuits it is possible to get information on the static and dynamic behavior of the parameterized models before they are applied in more complex schemes. These results can be compared with data sheets or with measurements. The application of these models for power loss analysis of inverter type arc welding power sources will be described.

  • PDF

Mitigation of high energy arcing faults in nuclear power plant medium voltage switchgear

  • Chang, Choong-koo
    • Nuclear Engineering and Technology
    • /
    • v.51 no.1
    • /
    • pp.317-324
    • /
    • 2019
  • A high energy arcing fault event occurred in the medium-voltage (13.8 kV and 4.16 kV) metalclad switchgears in a nuclear power plant not only affecting switchgear but also connected equipment due to the arc energy. The high energy arcing fault also causes a fire that influences the safety function of the unit. Therefore, from the safety point of view, it is necessary to evaluate the influences of high energy arcing fault events on the safety functions of nuclear power plants. The purpose of this paper is to elaborate the characteristics of high energy arcing faults and propose a high energy arcing fault mitigation scheme for medium voltage networks in nuclear power plants.

A Comparison of Operation Characteristics for $3\Phi$Boost/Buck Converter to Inverter Arc Welding Machine (인버터 아크용접기를 위한 3상 승압/강압형 컨버터의 운전특성비교)

  • 최해룡;구영모;채영민;최규하;목형수;김규식;원충연
    • Proceedings of the KIPE Conference
    • /
    • 1998.07a
    • /
    • pp.260-264
    • /
    • 1998
  • Three phase Boost/Buck converter which have economical merits and simple control scheme, are analyzed and evaluated through comparative methods and digital simulation for equivalent load. Those play a part of voltage boost/buck as well as power factor correction with single switch. Controller operating in constant and variable frequency is used for rapid output response and stable system condition respectively. Moreover low THD property of single switched converters is available for inverter arc welding machine known as high power and low power factor. So, in this paper a comparison of the characteristics in boost and buck converter is described and then simulation results conforms the merits from point of view of power factor and voltage regulator.

  • PDF

A Study on the Application of Established Digital Spatial Data to Geographic Information Systems (기구축된 공간 데이타의 지리정보시스템 적용에 관한 연구)

  • Kim, Yong-Il;Pyeon, Mu-Wook;Lee, Eung-Kon
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.4 no.1 s.6
    • /
    • pp.57-66
    • /
    • 1996
  • For the effective use of spatial data, it is necessary to translate the diverse digital map data (here, digital map for car navigation system) into common GIS data structure(here, ARC/INFO). For this purpose, analysis on the structure of the established digital map was fulfilled, the data model for effective translation tool was designed. As a result, the possibility to translate diverse digital map structures (database) into GIS tools and to share them, with the users' point of view, was successfully verified.

  • PDF

A Study on the Optimization Strategy using Permanent Magnet Pole Shape Optimization of a Large Scale BLDC Motor (대용량 BLDC 전동기의 영구자석 형상 최적화를 통한 최적화 기법 연구)

  • Woo, Sung-Hyun;Shin, Pan-Seok;Oh, Jin-Seok;Kong, Yeong-Kyung;Bin, Jae-Goo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.5
    • /
    • pp.897-903
    • /
    • 2010
  • This paper presents a response surface method(RSM) with Latin Hypercube Sampling strategy, which is employed to optimize a magnet pole shape of large scale BLDC motor to minimize the cogging torque. The proposed LHS algorithm consists of the multi-objective Pareto optimization and (1+1) evolution strategy. The algorithm is compared with the uniform sampling point method in view points of computing time and convergence. In order to verify the developed algorithm, a 6 MW BLDC motor is simulated with 4 design parameters (arc length and 3 variables for magnet) and 4 constraints for minimizing of the cogging torque. The optimization procedure has two stages; the fist is to optimize the arc length of the PM and the second is to optimize the magnet pole shape by using the proposed hybrid algorithm. At the 3rd iteration, an optimal point is obtained, and the cogging torque of the optimized shape is converged to about 14% of the initial one. It means that 3 iterations aregood enough to obtain the optimal design parameters in the program.