• Title/Summary/Keyword: Pohang Light Source (PLS)

Search Result 47, Processing Time 0.227 seconds

KICKER MAGNET MODULATOR IN PLS (포항방사광가속기 킼커 대출력 펄스전원장치)

  • Nam, S.H.;Jeong, S.H.;Han, S.H.;Suh, J.H.;Ha, K.M.
    • Proceedings of the KIEE Conference
    • /
    • 1997.07e
    • /
    • pp.1779-1781
    • /
    • 1997
  • The 2.0 GeV Pohang Light Source (PLS) is consisted of a full energy Linac and a storage ring. Four kicker magnets are installed in the storage ring tunnel to move the stored beam orbit in the storage ring closer to the injected beam from the beam transfer line. The injected beam then falls into the storage ring beam dynamic aperture. A kicker magnet modulator drives all four kicker magnets to maintain field balance and also synchronized kick of the beam. The kicker modulator can handle 2 GeV full energy beam. The kicker magnet modulator is installed in the storage ring tunnel and under stable operation. Specification of the kicker magnet modulator is ${\sim}6.0{\mu}s$ pulse-width, 200 ns flat-top width with ${\pm}0.2%$ regulation, ${\sim}24\;kA$ peak current, and 10 Hz repetition rate. Two thyratron switches (EEV CX-1536AX) are used in the system. In this article, design, and experimental results of the kicker magnet modulator are discussed.

  • PDF

Design of High Power RF Amplifier (고출력 고주파 증폭기의 설계)

  • Nam, S.H.;Jeon, M.H.;Kim, Y.S.
    • Proceedings of the KIEE Conference
    • /
    • 1994.07a
    • /
    • pp.180-182
    • /
    • 1994
  • In an electron storage ring of Pohang Light Source (PLS), electrons lose their energy in every turn by the synchronous radiation. A high power RF amplifier is employed to compensate the electron energy that is lost by the synchronous radiation. The specification of RF amplifier is an continuous output power of 60 kW at 500.082 MHz operating frequency. The power is supplied to RF cavities in the storage ring tunnel. Total number of amplifier system currently required is three. Tile total number will be increased upto five as the operating condition of storage ring is upgraded. The RF amplifier is mainly consisted of a high voltage DC power supply, an intermediate RF power amplifier (IPA), and a klystron tube. In this article, the design of RF amplifier system and characteristics of the klystron tube will be discussed.

  • PDF

Experimental Verification of Transverse Electric Mode Controlled Vacuum Chamber of PLS-II Storage Ring

  • Ju, Yeong-Do;Ha, Tae-Gyun
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 2012.02a
    • /
    • pp.229-229
    • /
    • 2012
  • It is significant issue to control the unwanted transverse electric (TE) modes in the vacuum chamber for preventing the position reading noise from the beam position monitor (BPM) of storage ring. We introduce shunt structure to control the frequency distribution of TE resonance modes excited in the vacuum chambers of the Pohang Light Source II (PLS-II). The design of shunt structure is performed using the full three dimensional finite-difference time-domain (FDTD) simulation. It is verified that the sympton of the BPM noise is not oberved up to the beam current of 190 mA in the commmissioning of PLS-II.

  • PDF

Experimental Analysis on Temperature Compensation of Capacitive Voltage Divider for a Pulsed High Voltage Measurement (고전압 펄스신호 측정용 분압기의 온도보상에 관한 실험)

  • Jang, S.D.;Son, Y.G.;Kwon, S.J.;Oh, J.S.;Cho, M.H.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07b
    • /
    • pp.1530-1533
    • /
    • 2005
  • Total 12 units of high power klystron-modulator systems as microwave source is under operation for 2.5-GeV electron linear accelerator in Pohang Light Source(PLS) linac. RF power and beam power of klystron are precisely measured for the effective control of electron beam. A precise measurement and measurement equipment with good response characteristics are required for this. Input power of klystron is calculated from the applied voltage and the current on its cathode. Tiny measurement error severely effects RF output power value of klystron. Therefore, special care is needed to measure precise beam voltage. Capacitive voltage divider(CVD) unit is intended for the measurement of beam voltage of 400 kV generated from the pulsed klystron-modulator system. Main parameter to determine the standard capacitance in the high arm of CVD is dielectric constant of insulation oil. Therefore CVD should be designed to have a minimum capacitance variation due to voltage, frequency and temperature in the measurement range. This paper will discuss the analysis of capacitive voltage divider for a pulsed high-voltage measurement, and the empirical relations between capacitance and oil temperature variation.

  • PDF

Performance Test of 4Cl Beamline for Protein Solution Scattering at the PLS (용액상의 단백질 구조 분석을 위한 PLS 4Cl빔라인의 성능 테스트)

  • Yu Chung-Jong;Kim Jehan;Kim Kwang-Woo;Kim Ghyung-Hwa;Lee Heung-Soo;Ree Moonhor;Kim Kyung-Jin
    • Journal of the Korean Vacuum Society
    • /
    • v.14 no.3
    • /
    • pp.138-142
    • /
    • 2005
  • We tested performance of the 4C1 beamline for analyzing structures of proteins in solution using small angle X-ray scattering (SAXS) at the Pohang Light Source(PLS). Structurally well-known proteins such as lysozyme and $Bcl-XL(\vartriangle TM/\vartriangle loop)$ were used for the study. Low resolution solution structures of lysozyme and $Bcl-XL(\vartriangle TM/\vartriangle loop)$ were obtained at a resolution of at least i.2 nm, and the structures were basically same as those calculated from the crystal structures of the proteins. We also used $Bcl-XL(\vartriangle TM/\vartriangle loop)$ with a long flexible loop attached [$Bcl-XL(\vartriangleTM))$] and obtained significantly different data from $Bcl-XL(\vartriangle TM/\vartriangle loop)$, although the electron density map of the loop is known to be invisible from the crystal structure of $Bcl-XL(\vartriangleTM))$. We confirm that SAXS experiment is a powerful tool for the structural study of proteins in solution and the 4Cl beamline at the PLS is well-equipped and suitable for the protein solution SAXS experiment.

Study on the De-Q'ing System for the Output Voltage Stabilization of a 200MW Modulator (200MW MODULATOR의 출력안정화를 위한 DE-Q'ING SYSTEM에 관한 연구)

  • Son, Y.K.;Oh, J.S.;Cho, M.H.;Namkung, W.
    • Proceedings of the KIEE Conference
    • /
    • 1994.07b
    • /
    • pp.1612-1614
    • /
    • 1994
  • Modulators Installed in PLS(Pohang Light Source) Linac are composed of a DC high voltage section, a charging section and a discharging section. PFN is charged by a resonant charging mechanism, and discharged by a switching device through the primary of the pulse transformer connected to a load. Charged PFN voltage must be well regulated to obtain stable output pulse voltage at the load. For this purpose, DCHV is controlled by a SCR controller with feedback signal, and PFN voltage is regulated by a De-Q'ing circuit. The full power operation test shows the pulse voltage regulation within ${\pm}0.13%$ with SCR feedback control alone, and within ${\pm}0.08%$ together with De-Q'ing. This paper describes the design concept and operational characteristics of the De-Q'ing circuit.

  • PDF

Study On the Pulse Power Supply using Inverter Power Supply for XFEL (XFEL용 인버터 고전압 전원공급장치를 이용한 펄스전원공급장치 연구)

  • Park, S.S.;Kim, S.H.;Kim, S.C.;Han, Y.J.;Hwang, J.Y.;Kim, H.G.
    • Proceedings of the KIPE Conference
    • /
    • 2005.07a
    • /
    • pp.198-200
    • /
    • 2005
  • The 2.5 GeV linac of the Pohang Light Source(PLS) is planed to be converted to a XFEL. The PAL XFEL requires a new 1.2-GeV linac that will be combined to the existing linac to increase a beam energy upto 3.7 GeV. The RF stability of 0.02 % is required for both RF phase and amplitude to get the XFEL output. This stability is mainly determined by a low level RF drive system and klystron-modulators. The stability level of the modulator has to be improved 10 times better to meet the pulse stability of 0.02 %. The regulation methods such as traditional de-Qing and precision inverter charging technology are reviewed to find out suitable upgrade scheme of the modulators.

  • PDF

Fully Digital Controlled Power Supply for PLS (전 디지털제어 전원장치)

  • Ha, Ki-Man;Kim, Y.S.;Lee, S.K.
    • Proceedings of the Korean Society of Marine Engineers Conference
    • /
    • 2005.06a
    • /
    • pp.1011-1015
    • /
    • 2005
  • Fully digital controlled 20-bit magnet power supplies have been developed and successfully tested for closed orbit correction of PLS(Pohang Light Source). The new digital power supply has used fiber optics for 25kHz switching of IGBT drivers, and implemented DSP, ADC, Interlock, DCCT cards in a compact 3U-sized 19" chassis. Input/Output low-pass filters suppress harmonics of 60Hz line frequency and switching frequency noise effectively. Overall performance of the power supplies have been demonstrated as +/- 2ppm short-term stability(<1 min), and +/- 10ppm long-term stability(<36 hours). All the existing 12-bit 70 power supplies for vertical correction magnets will be replaced with new digital power supplies during 2005 summer shutdown period. In this paper, we will describe the hardware structure and control method of the digital power supply and the experimental results will be shown.

  • PDF

Study of Pulse Generator used Inverter HV Power Supply (인버터 고전압 전원공급장치를 이용한 펄스전원공급장치 연구)

  • Park S. S.;Kim S. H.;Hwang J. Y.;Nam S. H.;Lee K. T.;Kim H. G.
    • Proceedings of the KIPE Conference
    • /
    • 2004.07a
    • /
    • pp.64-67
    • /
    • 2004
  • The klystron-modulator(K&M) system of the Pohang Light Source(PLS) had been supplying high power microwaves for the acceleration of 2.5 GeV electron beams since October 2002. There are 12 sets of K&M systems to accelerate electron beams to 2.5GeV nominal beam energy. One module of the K&M system consists of an 80 MV S-band (2856 MHZ) klystron tube and the matching 200 MW modulator. In order to obtain electron beam of the consequently stability for linac, the pulse-to-pulse beam voltage regulation is less than $+/-0.5\%$. To get the reliable stability of the modulator which is less than $+/-0.5\%$, a charging section is improved in a modulator which has been operated with inverter power supply.

  • PDF

Magnetic Measurement of PLS Storage Ring Prototype Dipole Magnet (방사광 가속기용 2극 전자석 특성측정 및 보정)

  • 강봉구;박기현;윤종렬;구양모
    • Journal of the Korean Magnetics Society
    • /
    • v.2 no.2
    • /
    • pp.163-168
    • /
    • 1992
  • Results of magnetic measurement of a prototype Storage Ring dipole magnet for the Pohang Light Source (PLS) are summarized. Hall probe mapping and rotating coil methods are used to measure field profiles and integrated field properties. End chamfering experiments are performed on the as-built magnet, which has four removable pole-end pieces, to meet the specifications set from beam dy-namics requirement. The corrected magnet has efficiency of 99.7% at 2.0 GeV excitation ad higher order multipole error levels less than the specifications for all excitations, showing that the magnet has appropriate properties for the PLS Storage Ring.

  • PDF