Adoption of Virtual Technology to the Development of a BIM based PMIS

  • Suh, Bong-Gyo;Lee, Ghang;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.333-340
    • /
    • 2013
  • As construction projects become bigger, PMIS is being used as a project collaboration tool for project participants, owners, designers, inspectors and contractors. As the data type used in PMIS is usually text and most PMIS have no standard information classification system, there is a problem with data usability, such as the capacity for data search and analysis. BIM uses Objects and Properties, and this information might be used for relating with other construction information. As such, BIM technologies can be used with PMIS to enhance the data usability. The web environment is very convenient for multiple users, but the problem is that the data transfer speed is low for big files such as BIM model files. In this study, we suggested a Virtual Technology (VT) application to enhance the performance of BIM data exchange in PMIS, and tested and analyzed its efficiency when it is used to integrate BIM and PMIS in the web environment. The results of the study showed that VT can be used to enhance the efficiency of BIM data exchange in the web environment.

RFID Technology Applications with PMIS for Managing RMC Truck Operations

  • Kim, Seung-Ho;Kim, Sang-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.5
    • /
    • pp.468-481
    • /
    • 2011
  • This research presents a strategy and information system to manage the logistics of delivery ready mixed concrete (RMC) under the integrated environment of PMIS+RFID. PMIS is system tool and technique used in construction sectors to delivery information. Information that can be extracted electronically in real time is more valuable than data gathered and maintained manually. RFID technology can help to improve data accuracy through supply chains and by identifying products and objects at specific points through automatic identification. The objectives of these two implementations can be able to improve the efficiency of logistics management for RMC truck process, and to verify the technical and practical feasibility of PMIS+RFID application in construction industry. This may be realistic given the dynamics of daily activities on construction sites. This research is focused on examples on real world case study, applications and research theme related and connected to PMIS+RFID technology. It demonstrated that PMIS+RFID technology has been automatically implemented and has shown process information about the RMC truck and the overall status information about it, both quickly and accurately. As a result, the construction site where needs 300 $m^3$ pouring (50 RMC trucks) per day can be reduced total 250 minutes. Moreover, this time saving is related to the labour cost saving. From the case studies, RFID+PMIS system was proven in terms of effectiveness rather than current method.

The Effect of PMIS Quality on Project Management Success (PMIS의 품질이 프로젝트관리의 성공에 미치는 영향 분석)

  • Lee, Seul-Ki;Lee, Hyoung-Lak;Yu, Jung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.117-126
    • /
    • 2010
  • As one of the key IT applications, the project management information system (PMIS) has played a significant role in construction management processes. This is because PMIS is an information system that gathers, integrates, and disseminates the output of project management processes among project participants, and is used to support all aspects of a project, from initiation through closing. This paper aims to identify the CSFs(Critical Success Factor) of Project Management and quality associated with Project Management Information System (PMIS) in construction projects, to analyze the Effect of PMIS quality on Project Management Success. The CSFs of Project Management and the quality components for PMIS are identified through a review of the literature, and consolidated through interviews with professionals in the construction industry. A questionnaire instrument was sent out to experienced users (Construction Manager and Constructor), and 253 completed questionnaires were retrieved. To increase the applicability of the results, the respondents consisted of workers spread across various parts of the construction site. Using SPSS 12.0, the data was used to analyze the relationship between PMIS Quality and Project Management Success through multiple regression analysis. These findings help to clarify what the highly prioritized factors are, and could also be used as an assessment tool to evaluate the performance of PMIS and thus help to identify areas for improvement.

Assessment Model for Project Management Information System Based on User Satisfaction and Importance (사용자 만족도 및 중요도를 고려한 건설 정보화 시스템 평가모형 개발)

  • Park, Kyoung-Ah;Lee, Jeong-Ho;Kim, Young-Suk;Han, Seung-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.137-148
    • /
    • 2008
  • Using PMIS(Project Management Information System) plays an important role in systematically planning and effectively managing the complex and large-sized construction projects. In spite of the importance of PMIS, on-site engineers, who are the main users of PMIS, have not used PMIS enthusiastically because PMIS has been evaluated and improved by not the viewpoint of the system users but the viewpoint of system managers and head office manager. Therefore, this study developed an assessment model to evaluate PMIS with the viewpoint of the on-site engineers, so previously developed PMIS can be evaluated by the on-site engineers with importance and satisfaction elements. It is anticipated that the effective use of the developed assessment model might increase the utilization of existing PMIS as well as develop the construction industry.

A Strategy for Building BIM+PMIS System (BIM+PMIS 시스템 구축 전략)

  • Yoon, Su-Won;Chin, Sang-Yoon;Shin, Tae-Hong;Choi, Cheol-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.61-67
    • /
    • 2008
  • BIM has been increasingly deployed to the construction industry in order to minimize ambiguity and to reduce errors of the communicated engineering information, for which poor communication due to fragmented industrial structure is mainly responsible. Known BIM use cases and related researches are focusing either (1) on a specialized solution for a given specialty area (e.g. structural engineering planning and early design, material take-off, constructability simulation, etc.), or (2) on handling interoperabillty issues with Industrial Foundation Classes (IFC); Neither of these approaches have sufficiently catered for collaboration and information management in actual construction projects. This paper proposes the strategy for BIM+PMIS (project management information system) system focused on improving PMIS which has been commercially provided with ASP(Application Service Provider). It also describes the architecture of the BIM-based information management module prototype, which is a key component of the BIM+PMIS system.

  • PDF

A Case Study on Information Strategy Plan of the Web Based on Project Management Information System for Construction Company (전사 웹기반 사업관리시스템 구축을 위한 정보화전략계획에 관한 사례연구)

  • Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.2D
    • /
    • pp.259-267
    • /
    • 2008
  • Nowadays PMIS (Project Management Information System) based on web is widely applied to communication, collaboration and community in construction jobsite for various organization such as subcontractors, general contractor, engineering company, supervisors and client. However, individual PMIS in jobsite is prone to be troublesome issue for integration and exchange of information regarding project management in corporate and may result in conflict of data application. The main reason should be lack of information strategy plan such as company master plan for information. This research shows a critical success factor that a big construction company of Korea establishes procedure and method for information strategy plan. In addition, It is to suggest how to be implemented PMIS architecture and execute business process innovation in corporate level. This research expects contribution that many construction companies reduce mistakes to be implemented management information system and to optimize system in corporate level.

A Development Plan for PMIS based on Total Life Cycle (전수명주기를 고려한 PMIS개발 방안)

  • Park, Soo-Choong;Lee, Seong-Gwon;Jung, Kye-Young;Kim, Jae-Jin
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1282-1288
    • /
    • 2011
  • Recently, the demand regarding reliability and safety of the railroad are increased as built to high-speed railway and Driverless LRT systems. Accordingly, effective management of construction projects is being applied, with the introduction and use of PMIS computerized systems. Due to the construction of railways, from the start of PMIS research planning, design, procurement, to construction and commissioning, various expertise is being carefully gathered, and by integrating it into the unified budget ideas and processes, rational, efficient, organized, and manageable financial plans are developed for the computerized system. However, the current PMIS does not take into account the life-cycle. Therefore, this study is to bring attention to the BIM smart BOM-based configuration management for life-cycle through the consideration for railway construction project management.

  • PDF

The Establishing of the Self-regulation System for Quality and Safety Management (현장(現場) 자율(自律) 품질안전관리(品質安全管理) 시스템 구축(構築))

  • Baik, In-Whee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.81-87
    • /
    • 2007
  • PMIS (Project Management Information System) has been applied in the R4-PROJECT This construction project has been controlled and managed by PMIS for the whole process of project. Moreover, this PMIS is updated to the Self-regulation System for Quality and Safety Management which is integrated and developed from PMIS in R4-PROJECT. So, The Self-regulation System for Quality and Safety Management has been delivering effective communication and information distribution with various stakeholders related to project and also brought the achievement of efficient construction management. As the system is successfully utilize, the satisfaction of costumer request and the performance of no accident for 550 million hours could be attained.

  • PDF

A Study on Performance Measurement Indicators of Nursing Department in a Hospital (병원 간호조직 성과관리지표 개발에 관한 연구)

  • Kang, Kyeong-Hwa;Han, Yong-Hee
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.15 no.1
    • /
    • pp.106-115
    • /
    • 2009
  • Purpose: The purpose of this study was to investigate the contribution score of nursing organizational level for Performance Management Indicators (PMIs) in the nursing department in a hospital. Methods: The process consisted of three stages. Stage I: The strategies based on 4 perspectives of Balanced Scorecard (BSC) were identified by BSC committee in the hospital nursing department. Stage II : PMIs according to the strategies were developed. Stage III : The contribution score according to nursing organizational level (nursing department, nursing unit, nurse) for PMIs were surveyed by questionnaire. Data was analyzed using descriptive statics and ANOVA test. Results: Eight strategies were defined according to 4 perspectives of BSC. Eighteen PMIs were determined according to the strategies. The nurse considered the contribution of nursing department most highly on the 13 among 18 PMIs. Conclusion: This study provided basic data for further study to identify the subject of responsibility on the strategic management of performance.

  • PDF

Analysis of PMIS Users Satisfaction and Loyalty Using Structural Equation Model

  • Kim, Min-Cheol;Lee, Hyung-Il;Cho, Sang-Ho;Kim, Ju-Hyung
    • Architectural research
    • /
    • v.23 no.1
    • /
    • pp.1-10
    • /
    • 2021
  • Project management information systems (PMIS) have been implemented to support cooperation among the participants of construction projects. Unlike other information systems used by members from an organization with similar culture and business environment, the PMIS are members from one-off fragmented project organization with diverse professional background. Successful operation is significantly affected by the tendencies of client's side and individual awareness of participants. In this regard, it is imperative to evaluate the success of the system based on the individual characteristics of PMIS users. Thus, this study proposes a method for determining the system success by analyzing the extent of the effects of system factors such as System Quality, Information Quality, and Service Quality and individual factors such as a user's IT application ability, Extrinsic Motivation to achieve User Satisfaction, and loyalty. Accordingly, a structural equation model (SEM), an effective tool to examine of the comprehensive structure of a causal relationship, is applied for analysis because the internal awareness of individuals is established as a variable.