• Title/Summary/Keyword: Plant-availability

Search Result 397, Processing Time 0.039 seconds

A Study on the Availability Evaluation with Failure Density Function of Equipment of Small-scale Plant (소규모 플랜트 기자재의 고장밀도함수가 가용도에 미치는 영향 평가)

  • Lee, Hongcheol;Hwang, Inju
    • The KSFM Journal of Fluid Machinery
    • /
    • v.19 no.3
    • /
    • pp.33-36
    • /
    • 2016
  • The investigation on the verification of availability simulation for small-scale plant has been carried out. This study focuses on the availability variation induced by number of equipment and iteration with failure density function. The equipment classification of small-scale plant and failure type and the methodologies on Monte-Carlo simulation are established. The availability deviation with programs showed under Max. 1.7% for the case of normal function. This method could be used to availability evaluation of small-scale plant, but calibration of the failure density function is necessary for general application.

Availability Analysis on the Multi-Effect Distillation and Adsorptive Desalination Process (다중효용-흡착 방식 담수화 시스템의 가용도 분석)

  • Noh, Hyon-Jeong;Lee, Ho-Saeng;Ji, Ho;Kang, Kwan-Gu
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.24 no.6_2
    • /
    • pp.827-839
    • /
    • 2021
  • Due to climate change and population growth, water scarcity is getting worse all over the world. Among various methods for desalination of seawater, the Multi-Effect Adsorptive Desalination method, which combines the existing Multi-Effect Desalination method and the Adsorptive Desalination method and can produce high-concentration-high-concentration freshwater, is emerging. Because the Multi-Effect Adsorptive Desalination method combines the two different methods, the system becomes complicated and the possibility of failure increases. Therefore, in this study, availability analysis was performed on the Multi-Effect Adsorptive Desalination process. A total of four types of reliability block diagrams were presented, and availability analysis was conducted based on them. The first form of a reliability block diagram is configured in series without any redundancy. The availability of the reliability block diagram composed of the serial system was found to be lower than the required availability. In order to increase availability, the redundancy to pumps and boiler are added to system. As a result of availability analysis, it was confirmed that designing desalination systems with redundancy to pump meets the 93% availability, which is typically required availability for various plants.

A Study on the Availability with Failure Rate of Process for LNG Plant (LNG 플랜트 공정계통의 실패율이 가용도에 미치는 영향에 관한 연구)

  • Kang, Kyung-Won;Yoon, Myung-O;Lee, Hong-Cheol;Hwang, In-Ju
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.24 no.4
    • /
    • pp.358-363
    • /
    • 2012
  • The simulation investigation on the availability of LNG plant with scenario of failure events and failure rate has been carried out. This study focuses on the availability, productivity, criticality induced by failure rate of major equipment. The methodologies for simulation such as the equipment classification of LNG plant and failure type and event schematic are established. The availability and mean time to repair have second order function profile in the all cases except general equipment, but these profiles have different inclination. The production and criticality of the specified LNG plant, simulated by Monte-Carlo algorithm, is located in the range of P = 86~92% and PL = 6~13%.

A Study on the Availability Assessment Method for Instrumentation and Control System of Nuclear Power Plant (원자력발전소의 제어계측 시스템에 대한 가용도 평가 방법 연구)

  • Lee, Dong-Hee;Nam, Kyung-H.
    • Journal of Applied Reliability
    • /
    • v.10 no.2
    • /
    • pp.149-160
    • /
    • 2010
  • This paper presents a study of an availability evaluation for I&C(Instrumentation and Control) System which it applied for nuclear power plant. The system availability assessment have been implemented to the reactor protection system by the adoption of Markov process. Results are satisfied to the requirement of EPRI and APR1400. Based on the research of I&C system assessment, it will contribute to improve the availability of system and impact the design concept with new design optimization.

A Study on the Availability Modelling and Assessment with Failure Density Function of Major Equipment for a Sewage Treatment Plant (하수처리장 주요 기자재의 고장확률밀도함수를 이용한 가용도 모델링 및 평가에 관한 연구)

  • Lee, Hong-Cheol;Kwak, Pilljae;Lee, Hyundong;Hwang, In-Ju
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.35 no.11
    • /
    • pp.763-768
    • /
    • 2013
  • The simulation investigation on the availability with failure density function of major equipment for a sewage treatment plant has been carried out. This study focuses on the availability of the plant and criticality with equipment module induced by component layout and its failure function. The equipment classification of sewage treatment plant and its failure function are established. Also solution methodologies are introduced as Monte-Carlo simulation method and event algorithm for uncertainty problem. The availability in the case of serial connection of equipment with all exponential function is calculated as around 50.4%. In other case of parallel combination with back up equipment, the availability showed over 80.1%. The criticality that a ffects availability showed high value over 77% in the dehydration and concentration process of sludge.

A Study on Simulation Model for RAM Analysis of SWRO Plant (SWRO 플랜트의 RAM 분석을 위한 시뮬레이션 모델 연구)

  • Kim, Yong Soo;Park, Jungwon;Choi, Sukho;Kang, Jun-Gyu
    • Journal of the Korea Society for Simulation
    • /
    • v.28 no.4
    • /
    • pp.1-10
    • /
    • 2019
  • The Sea Water Reverse Osmosis (SWRO) plant should take into account the availability of the plant from the design stage for long-term and continuous fresh water production. As it occurs, it is necessary to establish a corrective maintenance plan and preventive maintenance plan to maintain availability. In the field of complex engineering structures such as seawater desalination plants, it is difficult to estimate the reliability or availability of the system in a mathematical way. This study develops RAM analysis framework and model, and proposes discrete event simulation model as a application sowtware specialized for seawater desalination plant. Considering the characteristics of the plant maintenance, in case of corrective maintenance, we propose a preventive maintenance policy that not only repairs or replaces a single-broken part, but also simultaneously maintains all accessible parts according to the level of overhaul. A case study was conducted to estimate the availability of the system based on the field data of the seawater desalination plant in Korea and Saudi Arabia. The result was close to the expected availability of the plant.

A Study on the Reliability Verification of Availability Simulation for Complex Plant (플랜트 가용도 평가 시뮬레이터의 신뢰성 검증에 관한 연구)

  • Lee, Hongcheol;Hwang, Inju;Lee, Hyundong
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.1
    • /
    • pp.36-43
    • /
    • 2015
  • Recently, a number of evaluation studies on availability of plant were carried out. This study was conducted to verify of the reliability of a simulation with some variable such as configuration of process, failure probability density function and the number of iteration times for the natural gas liquefaction plant. The error rate of the KICT-RAM solution was evaluated as 0.03~1.79% compared with the result of the MAROS(commercial solution). And the error-rate change was observed in the range of 0.03~1.75 on the condition of the iteration times as 30, 100, 250. As a result the plant availability evaluation approach of KICT-RAM solution was verified as reasonable. However, the careful approach was required to use the solution because the error-rate increased according to iteration times change.

Development of earthquake instrumentation for shutdown and restart criteria of the nuclear power plant using multivariable decision-making process

  • Hasan, Md M.;Mayaka, Joyce K.;Jung, Jae C.
    • Nuclear Engineering and Technology
    • /
    • v.50 no.6
    • /
    • pp.860-868
    • /
    • 2018
  • This article presents a new design of earthquake instrumentation that is suitable for quick decision-making after the seismic event at the nuclear power plant (NPP). The main objective of this work is to ensure more availability of the NPP by expediting walk-down period when the seismic wave is incident. In general, the decision-making to restart the NPP after the seismic event requires more than 1 month if an earthquake exceeds operating basis earthquake level. It affects to the plant availability significantly. Unnecessary shutdown can be skipped through quick assessments of operating basis earthquake, safe shutdown earthquake events, and damage status to structure, system, and components. Multidecision parameters such as cumulative absolute velocity, peak ground acceleration, Modified Mercalli Intensity Scale, floor response spectrum, and cumulative fatigue are discussed. The implementation scope on the field-programmable gate array platform of this work is limited to cumulative absolute velocity, peak ground acceleration, and Modified Mercalli Intensity. It can ensure better availability of the plant through integrated decision-making process by automatic assessment of NPP structure, system, and components.

Bioavailability of Phosphorus in Feeds of Plant Origin for Pigs - Review -

  • Weremko, D.;Fandrejewski, H.;Zebrowska, T.;Han, In K.;Kim, J.H.;Cho, W.T.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.10 no.6
    • /
    • pp.551-566
    • /
    • 1997
  • Phosphorus has been known as an essential component of animal body. However, the requirement has not been determined precisely because of the variable bioavailabilities of feedstuffs from plant origin. The bioavailability of P in various feedstuffs of plant origin varies from 10 to 60%. Digestibility and availability of the P differed considerably depending on the feed. The lowest values were found for maize (under 20%), the highest for wheat and triticale (over 50%). This is due to the proportion of phytate and the presence of intrinsic phytase. And the digestive tract of monogastric animals does not contain sufficient amounts of phytase, an enzyme that hydrolyses the unavailable phytate complexes to available, inorganic orthophosphates. Microbial phytase supplementation improves the P availability, and both intrinsic plant and microbial phytase improves the availability of P in feedstuffs of plant origin. In a mixture of feeds with low and high activity of intrinsic phytase and/or supplemented by commercial phytase, the P availability is additive. However, in the light of current results it seems that exceeding the P availability equal to 60-70% is unrealizable even at large microbial phytase doses.

A Study on the Availability Prediction of Start-up Power Supply in Nuclear Power Plant by FTAMethod (FTA기법에 의한 원전기동전원의 이용율 예측에 관한 연구)

  • Che, Gyu-Shik
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.5
    • /
    • pp.517-523
    • /
    • 1999
  • The Start-up transformers or on-site stand-by transformers are installed for the start-up and shut-down of generator and emergency status in unclear power plant. The on-site power supply configuration using these transformers must be detemined by considering configuration requirements, site characteristics, reliability and availability severely because it is remarkably important for safety and benefit of plant. The start-up or stand-by power supply configuration has been determined considering only safety requirements and construction cost up to now in Korea. I study various reliability estimating methods for the prediction of availability, and estimate the unavailability for the start-up power supply system of two 1,000㎿ unclear power plants. I also detemine the reliability and unavailability and unavailavility of equipment, system and configuration using FTA method.

  • PDF