Geotechnical Site Investigation for Designing of Tidal Power Plant Structures (조력발전 구조물 설계를 위한 지반조사;인천만 지반조사 사례)

  • Oh, Myoung-Hak;Lee, Kwang-Soo;Park, Jin-Soon;Yum, Ki-Dai;Cha, Dai-Wook;Yang, Geun-Hun
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.613-616
    • /
    • 2007
  • The main structures that comprise a tidal power plant are turbine structure, sluice structure, tide embankment and gate. Since these structures are founded on seabed ground, an extensive geotechnical site investigation to evaluate the engineering properties of field soils must be conducted prior to design and construction. According to the results of geotechnical site investigation conducted at the planned site for construction of Incheon bay tidal power plant, soft ground generally lie 7 meters below the seabed surface level. This research suggests the reliable and economical design of foundations and ground improvements required for construction of main structures in Incheon bay tidal power plant, with considerations on field conditions.

  • PDF

Analysis of the Productivity and Indirect Cost Rates Estimation in the Steel Plant (철골 공장가공의 생산성 및 공장간접비율 실태분석)

  • Kim, Kyoung-Won;Ahn, Bang-Ryul;Tae, Yong-Ho;Huh, Young-Ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.333-336
    • /
    • 2012
  • In modern Construction Industry, as accumulation of capital and improvement of technology skills, buildings are becoming higher and more enormous, also the portion of steel works has been increasing. In addition, it is necessary to predict the optimum level of construction cost in a reasonable way. The composition of construction is direct construction cost, indirect construction cost and so on. However, it is not enough to study about indirect construction cost rather than direct construction cost. In this study, the state of productivity and indirect construction cost are analyzed in the steel production. As a result, the productivity and ratio of indirect cost in steel plant by inserted per 1ton are suggested.

  • PDF

Development of RCB Exterior Wall Form for Duration Reduction (공사기간 단축을 위한 원자로 건물 외벽 거푸집 개발)

  • Cho, Yerim;Shin, Yoonseok;Ko, Young-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.1
    • /
    • pp.587-595
    • /
    • 2018
  • Countries that have been banned from building nuclear plants are becoming more tolerant in response to global warming and climate change. Thus, the construction of future nuclear plants will increase, and the competition will also intensify. A nuclear power plant has a long construction period compared with conventional construction projects. In order to gain a competitive advantage in nuclear power plant construction, the construction period must be decreased. Therefore, the purpose of this study is to develop an exterior wall form for a reactor containment building to reduce the construction time by increasing the height of the form. The structural safety, constructability, and economic feasibility were analyzed to assess the applicability of the proposed form. The proposed form was determined to be structurally safe. Furthermore, the construction period was shortened by reducing the duration of the construction units, and the total construction cost and interest were also reduced. Therefore, the proposed form could contribute to reducing the construction period for nuclear power plants.

Project Risk Assessment Through Construction Sequence Analyses for Industrial Plant Construction Projects (산업플랜트 건설 프로젝트의 주요 공정 시퀀스 분석을 통한 리스크 평가)

  • Lee, Kyusung;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.140-151
    • /
    • 2013
  • In 2011 and 2012, Korean construction firms awarded around $ 64.5. Billion each year from the overseas market in 2011. This contract value accounted for overwhelming portion of total overseas construction contract values, and this growth is expected to continue for the next decade. However, contract scopes awarded to the Korean construction firms mainly involve detailed design and construction phases due to their competitiveness for the construction techniques. In other words, front-end-engineering-design and construction project management are not considered part of core business due to the lack of project management skills and experience. The researchers focused on development of construction sequence model required to improve construction planning and scheduling skills for the Korean construction firms. The model identifies critical work items and the sequence throughout project execution process. In addition, the researchers developed a risk evaluation method by applying fuzzy theory to the critical construction activities for the industrial plant construction projects. Developed methodology will help project practitioners to develop project schedule in a timely and effe ctive manner and evaluate project risks associated with scheduling process for the industrial plant construction projects.

Optimal location of Batcher Plant using Modified Steiner point (수정된 Steiner Point를 이용한 Batcher Plant의 최적 위치 선정)

  • Ha, Kwon-Yeol;Lee, Sang-Joong
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.10
    • /
    • pp.39-46
    • /
    • 2015
  • REMICON(Ready Mixed Concrete), the most essential material of construction work, is produced from facility called "Batcher plant." In order to produce Remicon, Batcher Plant needs to be supplied with basic raw material such as ballast, sand, cement, admixture and water. In remicon industry, overland transport vehicles are used during the whole manufacturing process from producing to infilling at the construction site. Thus, the transportation cost sums up be to 20 percent of whole manufacturing cost and transport capacity and distance travelled have direct and major effect on manufacturing costs. This paper suggests a method to find optimal location of batcher plant using modified Steiner point, suggesting the most effective and flexible connection through among construction site, aggregate, cement and remicon producing plant. This paper also proposes reducing of transport cost at maximum 60% by calculation through optimized plant location. The modified Steiner point theory proposed in this paper also can be applied to optimal location of a $2^{ry}$ substation or MCC panel for minimizing of power loss, voltage drop, line distance and etc.

A Case Study on Construction Cost Comparison for On-Site Construction and Off-Site Construction of Plant Project (플랜트 건설의 현장시공 및 모듈시공에 대한 공사비 비교 사례연구 - Pipe Rack을 대상으로 공사비 산정 -)

  • Kang, Hyun Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.4
    • /
    • pp.25-34
    • /
    • 2023
  • The purpose of this study is to calculate and compare construction costs for On-Site Construction and Off-Site Construction in Plant Project. For this purpose, the target for calculating the construction cost was limited to the Pipe Rack(Steel Structure and Piping). The results derived according to the purpose of the study are as follows. 1)The direct construction cost for On-Site Pipe Rack construction was KRW 56 billion, with Steel Structure KRW 25.1 billion and Piping KRW 30.8 billion won. 2)Comparing the rate of change between On-Site Construction and Off-Site Construction, material costs increased by 1.9% and expenses by 192.1%, but labor costs decreased by -9.1%, resulting in a total direct construction cost increase of 8.4%. These results can be used as reference data to check the current status of the increase or decrease in construction costs when constructing Pipe Racks as Off-Site Construction.

A Study on the Influential Factors to Power Plant Construction Project Quality Control : Focused on Collective Civil Complaints of Nuclear Power Plant Construction (발전소 건설프로젝트 품질관리에 영향을 미치는 요인에 관한 연구 : 원전 건설 집단민원 사례를 중심으로)

  • Ahn, Seong-Shik;Chung, Jay-M
    • Journal of Korean Society for Quality Management
    • /
    • v.46 no.2
    • /
    • pp.351-374
    • /
    • 2018
  • Purpose: The collective civil complaint problem is considered as important obstructive factor of the nuclear power plant construction project's success and quality. Therefore, this study demonstrate the factors which can affect the settling collective civil complaints, and also suggest the improvement of the resolution. Methods: This study collected the data of Kori Nuclear Power Division staff, local residents and Hanul Nuclear Power Division staff, local residents, and use them for analysis. Results: The results are twofold in the study: First, the 'Situation Recognition' and 'Mutual Cooperation' which are independent variables for solving collective civil complaints have proved to give positive influence on both the nuclear staff and the local residents about the complaint resolution outcome of the dependent variable. Second, the moderation variable 'Expected Benefit' on the influential relationship between the collective civil complaint resolution factor and the civil complaints resolution outcome proved to have a moderating effect only on the nuclear staff. On the other hand, moderation variables 'Time of SOC Business Implementation' and 'Time of Compensation' proved to have a moderating effect only for the local residents. Conclusion: According to the results, the staff have a positive opinion on the benefits of the nuclear power plant construction, while residents feel strongly that they do not get any benefit from the construction despite of tremendous investment and expected benefit in local area. As this results, policy implementation which is superable different understanding is required.

The Mock-Up Test for Applying Rebar Modularization to the Wall of Nuclear Power Plant (원전 벽체구조물의 철근모듈화 적용을 위한 Mock-Up 실험연구)

  • Lee, Byung-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.7-8
    • /
    • 2016
  • We are developing the technology for applying the Rebar Modularization Method to the Nuclear Power Plant Structures. To achieve this, we had developed the elementary technology for applying this method to Nuclear Power Plant Structures efficiently and performed the Mock-Up Test by using the developed elementary technology. By analysing this test result, we deduced the problems and found solutions to solve them.

  • PDF

Which CDM methodology is the best option? A case study of CDM business on S-Water treatment plant

  • Kyung, Daeseung;Lee, Woojin
    • Advances in environmental research
    • /
    • v.1 no.2
    • /
    • pp.125-142
    • /
    • 2012
  • Clean development mechanism (CDM) validity study was conducted to suggest better and more adaptable CDM scenario on water treatment plant (WTP). Potential four scenarios for CDM project; improvement of intake pumping efficiency, hydro power plant construction, solar panel construction and system optimization of mechanical mixing process were evaluated on S-WTP in Korea. Net present value (NPV) of each scenario was estimated based on sensitivity analysis with the variable factors to investigate the CDM validity percentile. Hydro power plant construction was the best option for CDM business with 97.76% validity and $1,127,069 mean profit by 9,813 $tonsCO_2e$/yr reduction. CDM validity on improvement of intake pumping efficiency was 90.2% with $124,305 mean profit by huge amount of $CO_2$ mitigation (10,347 $tonsCO_2e$/yr). System optimization of mechanical mixing process reduced 15% of energy consumption (3,184 $tonsCO_2e$/yr) and its CDM validity and mean profit was 77.25% and $23,942, respectively. Solar panel construction could make the effect of 14,094 $tonsCO_2$ mitigation annually and its CDM validity and mean profit was 64.68% and $228,487, respectively.

A study on the integrated data modeling for the plant design management system and the plant design system using relational database (관계형 데이터베이스를 이용한 PDMS/PDS의 통합 데이터 모델링에 관한 연구)

  • 양영태;김재균
    • Journal of Ocean Engineering and Technology
    • /
    • v.11 no.3
    • /
    • pp.200-211
    • /
    • 1997
  • Most recently, offshore Engineering & Construction field is concerned about integration management technology such as CIM(Computer Integrated Manufacturing), PDM(Product Data Management) and Enterprise Information Engineering in order to cope with the rapid change of engineering and manufacturer specification as per owner's requirement during construction stage of the project. System integration and integrated data modeling with relational database in integration management technology improve the quality of product and reduce the period of the construction project by reason of owing design information jointly. This paper represents the design methodology of system integration using Business Process Reengineering by the case study. The case study is about the offshore plant material information process from front end engineering design to detail engineering for the construction and the basis of monitoring system by integrating and sharing the design information between the 2D intelligent P&ID and 3D plant modeling using relational database. As a result of the integrated data modeling and system integration, it is possible to maintain the consistency of design process in point of view of the material balancing and reduce the design assumption/duration. Near future, this system will be expanded and connected with the MRP(Material Requirement Planing) and the POR (Purchase Order Requisition) system.

  • PDF