• 제목/요약/키워드: Plant Performance

검색결과 3,375건 처리시간 0.039초

Towards Improved Performance on Plant Disease Recognition with Symptoms Specific Annotation

  • Dong, Jiuqing;Fuentes, Alvaro;Yoon, Sook;Kim, Taehyun;Park, Dong Sun
    • 스마트미디어저널
    • /
    • 제11권4호
    • /
    • pp.38-45
    • /
    • 2022
  • Object detection models have become the current tool of choice for plant disease detection in precision agriculture. Most existing research improves the performance by ameliorating networks and optimizing the loss function. However, the data-centric part of a whole project also needs more investigation. In this paper, we proposed a systematic strategy with three different annotation methods for plant disease detection: local, semi-global, and global label. Experimental results on our paprika disease dataset show that a single class annotation with semi-global boxes may improve accuracy. In addition, we also studied the noise factor during the labeling process. An ablation study shows that annotation noise within 10% is acceptable for keeping good performance. Overall, this data-centric numerical analysis helps us to understand the significance of annotation methods, which provides practitioners a way to obtain higher performance and reduce annotation costs on plant disease detection tasks. Our work encourages researchers to pay more attention to label quality and the essential issues of labeling methods.

접시형 태양열 발전시스템에서 사용하는 여러 가지 형태의 태양추적시스템의 태양추적성능 분석 (Analysis of Sun Tracking Performance of Various Types of Sun Tracking System used in Parabolic Dish Type Solar Thermal Power Plant)

  • 서동혁;박영칠
    • 제어로봇시스템학회논문지
    • /
    • 제17권4호
    • /
    • pp.388-396
    • /
    • 2011
  • Sun tracking system is the most important subsystem in parabolic dish type solar thermal power plant, since it determines the amount of thermal energy to be collected, thus affects the efficiency of solar thermal power plant most significantly. Various types of sun tracking systems are currently used. Among them, use of photo sensors to located the sun(which is called sensor type) and use of astronomical algorithm to compute the sun position(which is called program type) are two of the mostly used methods. Recently some uses CCD sensor, like CCD camera, which is called image processing type sun tracking system. This work is concerned with the analysis of sun tracking performance of various types of sun tracking systems currently used in the parabolic dish type solar thermal power plant. We first developed a sun tracking error measurement system. Then, we evaluate the performance of five different types of sun tracking systems, sensor type, program type, hybrid type(use of sensor and computed sun position simultaneously), tracking error compensated program type and image processing type. Experimentally obtained data shows that the tracking error compensated program type sun tracking system is very effective and could provide a good sun tracking performance. Also the data obtained shows that the performance of sensor type sun tracking system is being affected by the cloud significantly, while the performance of a program type sun tracking system is being affected by the sun tracking system's mechanical and installation errors very much. Finally image processing type sun tracking system can provide accurate sun tracking performance, but costs more and requires more computational time.

Syngas및 수소를 연료로 사용하는 발전용 가스터빈 성능해석 (Performance Analysis of a Gas Turbine for Power Generation using Syngas as a Fuel)

  • 이종준;차규상;손정락;김동섭
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2007년도 춘계학술대회B
    • /
    • pp.3241-3246
    • /
    • 2007
  • Integrated Gasification Combined Cycle (IGCC) power plant converts coal to syngas, which is mainly composed with hydrogen and carbon monoxide, by the gasification process and produces electric power by the gas and steam turbine combined cycle power plant. The purpose of this study is to investigate the influence of the syngas to the performance of a gas turbine in a combined cycle power plant. For this purpose, a commercial gas turbine is selected and its performance characteristics are analyzed with three different fuels, i.e., natural gas ($CH_4$), syngas and hydrogen. It is found that different heating values of those fuels and chemical compositions in their combustion gases are the causes in the different performance characteristics.

  • PDF

소수력발전소의 성능예측 (A Study on the Performance Prediction for Small Hydro Power Plants)

  • 박완순;이철형
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2005년도 춘계학술대회
    • /
    • pp.448-451
    • /
    • 2005
  • This paper presents the methodology to analyze flow duration characteristics and performance prediction for small hydro power(SHP) plants and its application. The flow duration curvecan be decided by using monthly rainfall data at the most of the SHP sites with no useful hydrological data. It was proved that the monthly rainfall data can be characterized by using the cumulative density function of Weibull distribution and Thiessen method were adopted to decide flow duration curve at SHP plants. And, the performance prediction has been studied and development. One SHP plant was selected and performance characteristics was analyzed by using the developed technique. Primary design specfications such as design flowrate, plant capacity, operational rate and annual electricity production for the SHP plant were estimated. It was found that the methodology developed in this study can be a useful tool to predict the performance of SHP plants and candidate sites in Korea.

  • PDF

석탄가스화 복합화력 발전용 가스터빈 성능해석 (Performance Analysis of a Gas Turbine for Integrated Gasification Combined Cycle)

  • 이종준;차규상;손정락;김동섭
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2007년도 춘계학술대회
    • /
    • pp.771-774
    • /
    • 2007
  • Integrated Gasification Combined Cycle (IGCC) power plant converts coal to syngas, which is mainly composed with hydrogen and carbon monoxide, by the gasification process and produces electric power by the gas and steam turbine combined cycle power plant. The purpose of this study is to investigate the influence of the syngas to the performance of a gas turbine in a combined cycle power plant. For this purpose, a commercial gas turbine is selected and its performance characteristics are analyzed with syngas. It is found that different heating values of those fuels and chemical compositions in their combustion gases are the causes in the different performance characteristics. Also, Changing of turbine inlet Mass flow lead to change the turbine matching point, in the event the pressure ratio is changed.

  • PDF

Performance evaluation of safety-critical systems of nuclear power plant systems

  • Kumar, Pramod;Singh, Lalit Kumar;Kumar, Chiranjeev
    • Nuclear Engineering and Technology
    • /
    • 제52권3호
    • /
    • pp.560-567
    • /
    • 2020
  • The complexity of safety critical systems of Nuclear Power Plant continues to increase rapidly due its transition from analog to digital systems. It has thus become progressively more imperative to model these systems prior to their implementation in order to meet the high performance, safety and reliability requirements. Timed Petri Nets (TPNs) have been widely used to model such systems for non-functional analysis. The paper presents a novel methodology for the analysis of the performance metrics using PN modeling. The paper uses the isomorphism property of the TPNs and the Markov chains for the performance analysis of the safety critical systems. The presented methodology has been validated on a Shutdown System of a Nuclear Power Plant.

시스템엔지니어링을 이용한 턴키방식 플랜트 건설계약의 기술적 위험요인 효과적 분석 및 관리 (An Effective Analysis and Management of Technical Risk to Turn-key based Plant Construction Contracts using Systems Engineering)

  • 홍대근;변희철;서석환
    • 시스템엔지니어링학술지
    • /
    • 제10권2호
    • /
    • pp.59-69
    • /
    • 2014
  • In the bidding stage of turn-key based plant construction contracts, owners provide design and performance basis for contractors instead of giving design drawing. To win the bid for a plant construction, the contractors should be obliged to satisfy and ensure owners'requirements such as design and performance basis in a plant construction project, In other words, owners imposes technical risk of the design to the contractors by specifying responsibility for the analysis and verification of the plant construction. Thus, it is very important that contracters make accurate and realistic basic design plan in a short period of time. To deal with such a situation, we propose a systems engineering approach for the analysis and management of the technical risk. Specifically, we first: 1) Analyzes technical risk related with the plant design information for the bidders, followed by 2) Developing stakeholder requirements for the basic engineering design, and 3) System requirements for dealing with technical risk. Also, in this paper, we proposed converting method from MOE(Measure of Effectiveness) to MOP(Measure of Performance) in the risk analysis. To show the effectiveness of the proposed method, we carried out a case study.

냉각공기 예냉각을 통한 가스터빈 설계변수 변화에 의한 복합발전시스템 성능향상 분석 (Analysis of Performance Enhancement of a Combined Cycle Power Plant by the Change of Design Parameters of Gas Turbine Using Coolant Pre-cooling)

  • 권현민;김동섭;강도원;손정락
    • 한국유체기계학회 논문집
    • /
    • 제19권5호
    • /
    • pp.61-67
    • /
    • 2016
  • Turbine blade cooling is one of the major technologies to enhance the performance of gas turbine and combined cycle power plants. In this study, two cases of coolant pre-cooling schemes were applied in combined cycle power plant: decrease of coolant mass flow needed to cool turbine blade and increase of turbine inlet temperature (TIT). Both schemes are benefited by the decrease of coolant temperature through coolant pre-cooling. Under the same degree of pre-cooling, increasing TIT exhibits larger plant power boost and higher plant efficiency than reducing coolant flow. As a result, the former produces the same gas turbine power with a much smaller degree of pre-cooling than the latter. Another advantage of increasing TIT is a higher plant efficiency. Even with an assumption of partial achievement of the theoretically predicted TIT, the method of increasing TIT can provide considerably larger power output.

Silkworm-food plant-interaction: search for an alternate food plant for tasar silkworm (Antheraea mylitta Drury) rearing

  • Deka, Manabendra;Gargi, Gargi;Kumar, Rajendra;Yadav, Harendra;Sahay, Alok
    • International Journal of Industrial Entomology and Biomaterials
    • /
    • 제30권2호
    • /
    • pp.58-63
    • /
    • 2015
  • An experimental rearing of tropical tasar silkworm, Antheraea mylitta Drury was conducted to study silkworm-food plant-interaction and thereby to search for an alternate silkworm food plant. The silkworm-food-plant-interaction was studied with six different food plant species viz. Terminalia tomentosa, Terminalia arjuna, Terminalia belerica, Terminalia chebula of Combretaceae family and Lagerstroemia speciosa, Lagerstroemia parviflora of Lythraceae family. The rearing performance of silkworm on Lagerstroemia speciosa in terms of cocoons per DFL and silk ratio was found comparable with Terminalia tomentosa and Termonalia arjuna, the primary tasar silkworm food plant species. These three plant species also possessed better results in terms of physiological (leaf moisture content and net photosynthesis rate) and biochemical (Chlorophyll, protein, carbohydrate and crude fibre contents) characteristics to support silkworm rearing than Terminalia belerica, Terminalia chebula and Lagerstroemia parviflora. The correlation study between silkworm rearing performance and food plant's constituents indicates commercial perspective of Lagerstroemia speciosa as an alternate food plant for tasar silkworm rearing.

Comparative performance evaluation of two UF pilot plants at the Alto da Boa Vista WTP (São Paulo, Brazil)

  • Oliveira, T.F.;Mierzwa, J.C.
    • Membrane and Water Treatment
    • /
    • 제2권3호
    • /
    • pp.175-185
    • /
    • 2011
  • Ultrafiltration is an emerging technology for drinking water treatment because it produces better water quality as compared with conventional treatment systems. More recently, the combination of UF technology with other processes in order to improve its performance has been observed. These associations aim to maximize the contaminants removal and reduce membrane fouling. The operational performance of contaminants removal and water production of two UF pilot plants was compared. The first plant (Guarapiranga) was fed with raw water and the second plant (ABV) with pre-treated water by the coagulation, flocculation and sedimentation processes at Alto da Boa Vista WTP (Sao Paulo, Brazil). Both units operated continuously for approximately 2,500 hours, from September/2009 to January/2010. The results showed that the ABV UF pilot plant was able to operate at higher specific fluxes (6.2 $L.d^{-1}.m^{-2}.kPa^{-1}$ @ $25^{\circ}C$) than Guarapiranga (3.1 $L.d^{-1}.m^{-2}.kPa^{-1}$ @ $25^{\circ}C$). However, the number of chemical cleanings conducted in both pilot units during the considered operation period was the same (4 chemical cleanings for each plant), which shows that the pre-treatment reduced the membrane fouling. The water quality at ABV for all the variables analyzed was better, but the feed water quality was also better due to pretreatment. The rejection values for the different contaminants were higher at Guarapiranga mainly because of a pollution load reduction after pre-treatment at ABV. Even with the better performance of the ABV UF pilot plant, it is necessary to take into consideration the complexity of the complete treatment system, and also the costs involved in the construction and operation of a full-scale treatment unit.