• Title/Summary/Keyword: Plant Management

Search Result 3,495, Processing Time 0.033 seconds

A Fundamental Research for Technology area of SCM in Korean Nuclear Power Plant Construction (원전건설 공급망관리 기술영역 도출을 위한 기초연구)

  • Park, Hang-Soon;Kim, Woo-Jung;Chong, Young-Whan;Won, Seo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.268-270
    • /
    • 2013
  • The construction project can be defined as a network combined between elements which are engineering, procurement, construction, start-up, and has a plenty of subjects and partners. For the successful project management in construction industry, it is necessary to adopt various management methods, such as lean production, information network system, SCM(Supply Chain Management), which can increase the efficiency of project management. During recent years, even though various management techniques have been applied, the SCM system has not formulated in construction industry. Especially, the Nuclear Power Plant Construction which requires high regulations of the safety and security has not applied SCM. Therefore, this study aimed to propose technology area of SCM in Korean Nuclear Power Plant Construction.

  • PDF

Steel Plant Construction (EPC) Project Case Study : Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation

  • Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.145-150
    • /
    • 2013
  • As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.

  • PDF

A Presentation of a Cost Classification System for Gas Plant Construction Projects

  • Park, Moonsun;Kim, Yongsu
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.625-626
    • /
    • 2015
  • The purpose of this study is to present a cost classification system that can be used in gas plant construction projects. Towards this end, it examined the detailed statements of the construction companies which had experience in carrying out plant construction projects. Based on the above, it also presented a life-cycle (i.e., EPCC) cost classification system for the gas plant construction projects by conducting the Delphi analysis through the expert opinions.

  • PDF

AGING ASSESSMENT OF CANDU PLANT MAJOR COMPONENTS

  • Jeong, Il-Seok;Lee, Kyoung-Soo;Kim, Tae-Ryong
    • Proceedings of the Korea Society for Energy Engineering kosee Conference
    • /
    • 2003.05a
    • /
    • pp.415-423
    • /
    • 2003
  • Korea Electric Power Research Institute(KEPRI) had worked a comprehensive Plant Lifetime Management (PLiM) project for a CANDU plant in corporation with Korea Hydro and Nuclear Power(KHNP). The project had been performed to understand the aging status of major components screened from the plant and to address provisions for the continued operation over its design life. A feasibility of the continued operation was reviewed in the aspects of technology, economics, and regulatory environments. This paper introduces general approach of aging assessment, screening of critical components and an experience of aging assessment for an example of fuel channel that is the most critical component in CANDU plant.

  • PDF

Performance assessment and improvement plan of the regulatory management system of veterinary medical devices in Korea (국내 동물용 의료기기 관리실태 평가 및 개선방안 연구)

  • An, Hyo-Jin;Yoon, Hyang-Jin;Kim, Chung-Hyun;Wee, Sung-Hwan;Moon, Jin-San
    • Korean Journal of Veterinary Research
    • /
    • v.55 no.2
    • /
    • pp.97-103
    • /
    • 2015
  • In this study, the Korean veterinary medical devices management system was evaluated relative to systems in the USA, EU, and Japan. Veterinary medical devices are regulated in Korea based on the Medical Appliance Act of 1997. This was initially supervised by the Ministry of Agriculture, Food and Rural Affairs and Korea Animal Health Products Association, and subsequently by the Animal and Plant Quarantine Agency (QIA) in 2000. These devices were classified approximately 1,400 categories as instruments, supplies, artificial insemination apparatus, and other categories. Each of these devices was assigned to four regulatory grades by the QIA in 2007. The ranking system for veterinary medical devices was implemented in 2014 with 820 products from 162 companies registered by that year. However, in vitro diagnostic devices (IVDDs) for animals were managed as medical devices and biological medicine. In vitro diagnostic reagents for treating infection diseases are not subjected to either a classification or grading system. Veterinary medical devices are currently exempt from good manufacturing practices (GMP) and device tracking requirements. Due to gradual growth of the domestic veterinary medical devices market since 2008, regulation of these devices should be improved with re-examination of IVDDs and GMP certification for the effective operating system.

A Real-Time PCR Assay for the Quantitative Detection of Ralstonia solanacearum in Horticultural Soil and Plant Tissues

  • Chen, Yun;Zhang, Wen-Zhi;Liu, Xin;Ma, Zhong-Hua;Li, Bo;Allen, Caitilyn;Guo, Jian-Hua
    • Journal of Microbiology and Biotechnology
    • /
    • v.20 no.1
    • /
    • pp.193-201
    • /
    • 2010
  • A specific and rapid real-time PCR assay for detecting Ralstonia solanacearum in horticultural soil and plant tissues was developed in this study. The specific primers RSF/RSR were designed based on the upstream region of the UDP-3-O-acyl-GlcNAc deacetylase gene from R. solanacearum, and a PCR product of 159 bp was amplified specifically from 28 strains of R. solanacearum, which represent all genetically diverse AluI types and all 6 biovars, but not from any other nontarget species. The detection limit of $10^2\;CFU/g$ tomato stem and horticultural soil was achieved in this real-time PCR assay. The high sensitivity and specificity observed with field samples as well as with artificially infected samples suggested that this method might be a useful tool for detection and quantification of R. solanacearum in precise forecast and diagnosis.

Development of a Decision Making Model for Construction Management in LNG Plant Construction - Focused on Construction Stage - (LNG 공사의 건설사업관리 의사결정지원모델 개발 - 시공단계 중심 -)

  • Park, Hwan Pyo;Han, Jae Goo;Chin, Kyung Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.47-57
    • /
    • 2014
  • LNG plant projects tend to be implemented in overseas owing to its characteristics, so their project management scheme is somewhat different from those of general projects. Value chain in a LNG plant project includes exploration/production of gases, physical liquefaction/chemical conversion processes, transportation and storage. Key factors in the chain include liquefaction process (including ultra-low temperature liquefaction) to convert natural gas into liquid materials or fuel, and Front End Engineering Design (FEED) package, as well as Engineering, Procurement and Construction (EPC) technology comprising control, operation and construction. Success of a complex LNG plant project implemented in overseas depends on decision-making process in project management. Accordingly, to develop a decision-making model in of plant construction, the study extracted none factors in project management by EPC stage and assessed importance of each factor. The result showed that items in both project management and project risk management are important. Especially, the study developed a decision-making model in the construction stage of a LNG plant project based on the project management factors and importance assessment. The developed decision-making model would lay groundwork in building a decision-making system in construction stage of project management.

Implementation of Customized EPM for Collaborative Resource Procurement in Small and Medium Size Plant Construction Enterprises (중소플랜트기업의 협업자원조달을 위한 Customized EPM구현)

  • Nam, Jung-Tai;Kim, Sung-Hun;Han, Young-Geun
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.2
    • /
    • pp.133-141
    • /
    • 2008
  • The need for total enterprise management that covers from accepting orders, design, cost, procurement, manufacture, and delivery has been recently raised in order for efficient project management of small and medium size plant construction enterprises. This trend is reflected in the introduction of EPM(Enterprise Project Management) solutions by some shipbuilding enterprises and large construction corporations. In step with the trend, small and medium size plant construction enterprises are enabled to provide knowledge base in terms of reducing cost and production period and managing portfolio for accepting orders and attaining contract by inducing customized EPM This study presents a design of customized EPM based on a case study of a company. It exhibits a collaborative/collaboration resource-supply model which can be universally applied to small and medium size job-order production enterprises. The research discusses that under the assumption that information is shared internally between departments on planning, supply, manufacture, and quality control in order to create collaborative environment and close participation is created externally between suppliers and orderers, productivity can be improved in cost reduction through planning efficient collaborative supply model.

A Study on Application of Systems Engineering Technical Process to FEED in Plant construction Industry - focused on a case of Environmental Plant (플랜트 FEED 설계를 위한 시스템엔지니어링 기술프로세스 적용방안 연구 - 환경플랜트 사례를 중심으로)

  • Ki, Wan Wook;Kim, Jun Pil;Hong, Dae Geun;Suh, Suk-Hwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.9 no.2
    • /
    • pp.37-53
    • /
    • 2013
  • With rapid growth of the world plant market, an increasing attention is paid on the plant engineering. Up to present time, Korean plant engineering technology has been concerned with the down stream part of the plant engineering, so called EPC, considered as a lower value chain compared with the up stream, composed of FEED(Front End Engineering Design) and PMC(Project Management Consultancy). In other words, a key issue for Korean plant industry is how to catch up the FEED technology, currently occupied by the advanced countries. In this paper, we propose an SE(Systems Engineering) approach, conventionally applied for aerospace and defense industry, to the FEED for plant engineering. Specifically, we proposed a new SE process composed of: 1) SPA matrix for reverse systems engineering, and 2) PPA matrix for forward systems engineering. To illustrate the proposed method, a case study for an environmental plant is performed.