• Title/Summary/Keyword: Plant Facility

Search Result 767, Processing Time 0.029 seconds

FMEA for Facility Reliability Analysis of A Hydro-power Plant (수력발전소 설비 신뢰성 분석을 위한 FMEA)

  • Kwon, Chang-Seob;Jeon, Tae-Bo
    • Journal of Industrial Technology
    • /
    • v.26 no.B
    • /
    • pp.135-144
    • /
    • 2006
  • The significance of hydro-power plant is increasing in its public roles such as flood control and water supply as well as electric power production. Even if high level of reliability in facility operation is required, no specific reliability research has been made. This specifically stems from the lack of technology and research investments. The eventual goal of this study is to secure a methodology for reliability analysis of hydro-power plant so that an appropriate decision for operation and investment can be made. Specific effort was put to develop a reliability model for water supply system within hydro-power plant. For this study, we briefly examined the overview of the hydro-power plant including the electric power generation facility system. We then discussed the facility reliability analysis methodology for hydro-power plant. Based on rigorous examination of the water supply system and components roles, we drew major failure modes for each component and examined their effects.

  • PDF

Risk-based Design of On-board Facility for Lifting System Field Test of Deep-sea Mining System (심해저 광물자원 양광시스템 실증 시험을 위한 위험도 기반 선상 설비 설계)

  • Cho, Su-gil;Park, Sanghyun;Oh, Jaewon;Min, Cheonhong;Kim, Seongsoon;Kim, Hyung-Woo;Yeu, Tae Kyung;Jung, Jung Yeul;Bae, Jaeil;Hong, Sup
    • Journal of Ocean Engineering and Technology
    • /
    • v.30 no.6
    • /
    • pp.526-534
    • /
    • 2016
  • This study had the goal of designing onboard structures for a pre-pilot mining test (PPMT), which is required for the commercialization of the deep-sea mining industry. This PPMT is planned to validate the performance of a hydraulic lifting system and verify the concept of operating through a moon-pool in the east sea, Korea. All of the onboard equipment and facility were designed by KRISO. Because the test was performed at the first development, it is difficult to determine what risk will occur in the facility. Therefore, risk-based design is required in the facility for the PPMT, which includes the facility layout, failure mode and effect analysis (FMEA), and risk reduction plan. All of the expected performances of the lifting system itself and the onboard facilities were qualitatively validated using the risk-based design.

A Study on the Workplace Noise Environment of Office Areas in Power Plant (발전소 관리실의 작업환경 소음에 관한 연구)

  • 김병삼
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.7 no.4
    • /
    • pp.35-41
    • /
    • 1998
  • The workplace noise environment is composed of three basic elements : manufacturing (in a generic sense) facilities, office areas, and the community around the facility. Work must be done by all employees , and this involves communication within a variety of locations within the facility ; areas may be extremely noisy, moderately noisy, or quiet, such as an office. At the same time, the facility should not be annoying to the community. In this paper, the workplace environmental noise of office areas in power plant are studied. Turbine generator in power plant generates the noise of 90∼95 dB(A) in the frequency range of 1 kHz, which may cause occupational hearing loss. By abatement method which are made of isolation material and distance damping effect, about 29.5 dB(A) reduction has been obtained in office areas of the Power Plant . But, the workplace environmental noise of office areas in the power plant is not suited to office's purpose.

A Study on Unused Energy Management of Jeju City Waste Environment Center (제주시 폐기물환경사업소의 미활용에너지 활용방안 연구)

  • Kim, S.H.;Kwon, K.R.;Park, Y.C.
    • Journal of Power System Engineering
    • /
    • v.8 no.1
    • /
    • pp.48-54
    • /
    • 2004
  • In this study, waste heat of Jeju City Waste Environment Center is investigated and the utilization method is suggested with economical analysis of additional investment that needed for new facility. Energy balance of the typical facilities is considered in this study such as incineration plant and LFG power plant. The payback period of the investment which is used for the LFG power plant waste heat utilization facility is about 2.4 years and the economic profit of the facility during 10 years operation is up to 926 million won.

  • PDF

Analysis of Life Cycle on Spodoptera exigua by Various Temperatures and Larval Susceptibility against Two Pesticides in Quarantine Pest Research Facility (검역해충실험동에서 파밤나방의 온도별 생활사 및 2종 살충제에 대한 유충 감수성 조사)

  • Lee, Jieun;Park, Youngjin
    • Korean journal of applied entomology
    • /
    • v.60 no.2
    • /
    • pp.185-191
    • /
    • 2021
  • A Quarantine Pest Research Facility (QPRF) had been build in Animal and Plant Quarantine Agency and designed to ensure alien pests are safety contained inside the laboratory. Functions of QPRF including insect rearing, research, and physical containment facility were verified to check suitability as a research laboratory using the beet armyworm, Spodoptera exigua. As insect rearing and laboratory facility, S. exigua completed its development for 32.2 days at 25℃. Egg hatching, pupation, and adult eclosion showed 80, 86.6, and 90%. Two pesticides, fluxametamide and hydramethylnon showed high susceptibility against S. exigua larvae by spraying and dipping methods. As physical containment facility, male adults, which were artificially released from laboratory, did not capture in delta trap installed sex pheromone lure during winter season. Based on these results, QPRF will be used for study on alien insect species.

Effect of Operating Conditions on Drying Efficiency for Coal Drying Facilities in a Steel Making Plant (제철플랜트용 석탄건조설비에서 운전조건 변경이 건조성능에 미치는 영향)

  • Jeon, Hae-Seak;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.4
    • /
    • pp.73-79
    • /
    • 2009
  • Increase of consumption in limited coal reserves leads prices surging. As a result, iron works which produce products with coal are in difficulties. Accordingly, it is required a lot of research of using non-caking coal that is relatively low cost and has abundant reserves. Direct drying and indirect drying are two major methods of drying the coal. Recently, to minimize the needed calories and to save energy, using fluidbed or fluidizing method is a recent main trend of minimizing the size of the facility and maximizing energy efficiency. However there is also disadvantage such as increasing facility investment because of installing additional facilities in the latter part. In this study, we will have theoretical researches on the indirect drying method with heat exchange system which have been traditionally used. As a result it is expected to increase the efficiency of the facility operation.

  • PDF

Cut tree approach for facility layout problem

  • Kim, Chae-Bogk
    • Korean Management Science Review
    • /
    • v.11 no.3
    • /
    • pp.55-65
    • /
    • 1994
  • Given the flow matrix, plant size and department sizes, the algorithms in this paper provide the layout with rectilinear distance. To construct automated facility design, cut tree approach is employed. A branch and bound computer code developed by Tillinghast is modifided to find the feasible fits of departments without shape distortion in the plant rectangle.

  • PDF

Design Study for KSLV Integrated Power Plant Test Facility

  • Kang, Sun-Il;Lee, Jung-Ho;Kim, Young-Han;Oh, Seung-Hyup
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2004.03a
    • /
    • pp.573-576
    • /
    • 2004
  • KARI is achieving the KSLV program according to National Space Technology Development Program. In this paper, the authors are intended to introduce the Integrated Power Plant (abb. IPP) test facility which will be constructed for the variety of tests on KSLV program. IPP test facility refers to comprehensive testing equipment for liquid rocket launch vehicle. Using this facility, KARl can verify the adaptiveness of parts and subsystems for launch vehicle and finally can qualify the system characteristics of launch vehicle doing kinds of test including hot firing test. Using this facility, KARI can simulate the vehicle launching circumstances and it make to predict the performance of launch vehicle when its flight test.

  • PDF

Study of the Environment Priority Facility Operation Concept of 500MW Standard Coal Thermal Power Plant (500MW 표준석탄화력발전소의 환경안전우선 설비운영개념 도입방안 고찰)

  • Lee, Kab-Ju;Chung, Jin-Do;Kim, San
    • Journal of the Korea Safety Management & Science
    • /
    • v.24 no.2
    • /
    • pp.1-9
    • /
    • 2022
  • In korea, 500MW standard coal fired power plants were designed and operated for the initial base load, so facility stability was prioritized from facility problem to treatment, but now we needed to research for minimizing greehouse gas emissions at the operation of coal fired power plants. research on various facilities and technologies was actively conducted to reduce environment pollutants was drastically reduced, but research and attempts on coping measures in the event of a reduction facility problem were in sufficient. this study considered investigated ways to minimized pollutants by quickly responding to logic development and application of the load runback concept in case of serious problems with environmental pollutant reduction facilities such as NOx reduction selective catalytic reduction facilities, SOx reduction wet flue gas desulpherisation facilities, and TSP(Total Suspended Particles) collection low temperature electric precipitator.

A study on the application of the extreme value distribution model for analysis of probability of exceeding the facility capacity (시설용량을 초과하는 폐수량의 유입확률 분석을 위한 극치분포모델의 적용에 관한 연구)

  • Choi, Sunghyun;Yoo, Soonyoo;Park, Taeuk;Park, Kyoohong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.30 no.4
    • /
    • pp.369-379
    • /
    • 2016
  • It was confirmed that the extreme value distribution model applies to probability of exceeding more than once a day monthly the facility capacities using data of daily maximum inflow rate for 7 wastewater treatment plant. The result of applying the extreme value model, A, D, E wastewater treatment plant has a problem compared to B, C, F, G wastewater treatment plant. but all the wastewater treatment plant has a problem except C, F wastewater treatment plant based 80% of facility capacity. In conclusion, if you make a standard in statistical aspects probability exceeding more than once a day monthly can be 'exceed day is less than a few times annually' or 'probability of exceeding more than once a day monthly is less than what percent'.