• 제목/요약/키워드: Plant Equipment

검색결과 916건 처리시간 0.027초

플랜트 O&M을 위한 기자재 조달방식 의사결정에 관한 연구 - 기술전략 관점을 중심으로 - (A Study on Decision-making of Equipment Procurement for Plant Operations & Maintenance (O&M) - Focused on Technology Strategy perspective -)

  • 홍대근;임용택
    • 시스템엔지니어링학술지
    • /
    • 제15권1호
    • /
    • pp.25-33
    • /
    • 2019
  • In the plant industry, the share of equipment accounts for 45 ~ 75%, which is very high. It is a traditional plant centered on processes and reactions like petroleum and chemical plants. Renewable energy generation plants such as wind power generation and solar power generation are equipment-centric plants. Equipment-centric plants are very important not only in the EPC phase but also in the operation and management phase. The procurement of equipment for plant operation and management can be divided into make and buy. Make is a method of producing equipment itself, and buy is a method of procuring equipment from the outside. The procurement method of the equipment directly affects the plant operation and management cost. In this study, the decision making of equipment procurement method for plant operation and management is defined as 4 phase. Each phase is selection of procurement decision-making objects, technology strategy perspective, finance perspective, and production perspective. In detail, we defined selection process of procurement decision-making objects and technology strategy perspective process. We will contribute to the enhancement of the competitiveness of the plant operation and management area by carrying out researches on the process and application examples of financial and production perspectives in the future.

ISO 15926 국제 표준을 이용한 원자력 플랜트 기자재 분류체계 (Development of the ISO 15926-based Classification Structure for Nuclear Plant Equipment)

  • 윤진현;문두환;한순흥;조광종
    • 한국CDE학회논문집
    • /
    • 제12권3호
    • /
    • pp.191-199
    • /
    • 2007
  • In order to construct a data warehouse of process plant equipment, a classification structure should be defined first, identifying not only the equipment categories but also attributes of an each equipment to represent the specifications of equipment. ISO 15926 Process Plants is an international standard dealing with the life-cycle data of process plant facilities. From the viewpoints of defining classification structure, Part 2 data model and Reference Data Library (RDL) of ISO 15926 are seen to respectively provide standard syntactic structure and semantic vocabulary, facilitating the exchange and sharing of plant equipment's life-cycle data. Therefore, the equipment data warehouse with an ISO 15926-based classification structure has the advantage of easy integration among different engineering systems. This paper introduces ISO 15926 and then discusses how to define a classification structure with ISO 15926 Part 2 data model and RDL. Finally, we describe the development result of an ISO 15926-based classification structure for a variety of equipment consisting in the reactor coolant system (RCS) of APR 1400 nuclear plant.

부생복합발전 소개와 주요설비 국산화를 위한 연구 (Introduction of Off-Gas Power Plant and Localization Development of Auxiliary Equipment)

  • 고민석;김도형;이동수;이성건
    • 한국연소학회:학술대회논문집
    • /
    • 한국연소학회 2013년도 제46회 KOSCO SYMPOSIUM 초록집
    • /
    • pp.127-128
    • /
    • 2013
  • Off-gas power plant is a renewable energy power plant which generate electrical energy using the low calorie FOG and BFG as main fuel. This combined cycle power plant is comprised of gas turbines, gas compressors, steam turbines, generators, and auxiliary equipment such as gas mixer, mixing tank, and gas cooler. In this paper, a off-gas power plant and development of its several equipment using CFD are introduced.

  • PDF

A Study on Automatic Space Analysis for Plant Facilities Based on 3D Octree Argorithm by Using Laser Scanning Information

  • Kim, Donghyun;Kwon, Soonwook;Chung, Suwan;Ko, Hyunglyul
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.667-668
    • /
    • 2015
  • While the plant projects grow bigger and global attention to the plant is increasing, efficient space arrangement is not working in plant project because of the complex structure in installing the equipment unlike the construction project. In addition to this, presently, problem in installation process caused by the disagreement between floor plan and real spot is rising. Therefore the target of this research is to solve the problems and reaction differences, caused by changing the space arrangement in installing the equipment of plant construction. And this research suggests the equipment arrangement method for construction and related processes. To solve the problem, 3D cloud point data of space and equipment is collected by 3D laser scanning and the space matching is operated. In processing the space matching, data is simplified by applying the octree algorithm. This research simplifies the 3D configuration data acquired by 3D scanner equipment through the octree algorithm, and by comparing this data, identifies the space for target equipment, and finally suggests the algorithm that makes the auto space arrangement of equipment possible in construction site and also suggests the process to actualize this algorithm.

  • PDF

Optimum Design of Packaged Skid for Oil & Gas Plant

  • 최황근;신현경
    • 한국해양공학회:학술대회논문집
    • /
    • 한국해양공학회 2006년 창립20주년기념 정기학술대회 및 국제워크샵
    • /
    • pp.269-272
    • /
    • 2006
  • The use of packaged skid in oil and gas plant has increased dramatically over the decades, replacing loose supply equipment. Most equipment is installed on structural skid in manufacturer's shop. As Oil and Gas Plants are constructed at inaccessible area, the demands of packaged skids are increased. The packaged skid have advantages comparing to loose supply equipment in inaccessible area. The packaged skid is small complex plant consists of process, mechanical, piping, instrument, electrical and structural steel. This paper examines advantages and problems of packaged skid, based on previous experience. EPC company consider key factors such as manufacturing period, construction periods, equipment quality and costs.

  • PDF

Applications of online simulation supporting PWR operations

  • Wang, Chunbing;Duan, Qizhi;Zhang, Chao;Fan, Yipeng
    • Nuclear Engineering and Technology
    • /
    • 제53권3호
    • /
    • pp.842-850
    • /
    • 2021
  • Real Time Simulation (RTS) has long been used in the nuclear power industry for operator training and engineering purposes. And, Online Simulation (OLS) is based on RTS and with connection to the plant information system to acquire the measurement data in real time for calibrating the simulation models and following plant operation, for the purposes of analyzing plant events and providing indicative signs of malfunctioning. An OLS system has been developed to support PWR operations for CPR1000 plants. The OLS system provides graphical user interface (GUI) for operators to monitor critical plant operations for preventing faulty operation or analyzing plant events. Functionalities of the OLS system are depicted through the maneuvering of the GUI for various OLS functional modules in the system.

원전 기기 정착부의 내진검증 기법 사례연구 (Seismic Verification of Nuclear Power Plant Equipment Anchorage)

  • 서용표
    • 한국지진공학회:학술대회논문집
    • /
    • 한국지진공학회 2000년도 추계 학술발표회 논문집 Proceedings of EESK Conference-Fall 2000
    • /
    • pp.215-223
    • /
    • 2000
  • In this study, the effect of stiffness ratio between base frame and anchorgae is evaluated and the seismic verification of nuclear power plant equipment anchorage is performed for typical equipment. The stiffness ratio between base frame and anchorage is mainly controlled by the effective height of side wall plate. And, the change of that stiffness ratio cause the large shift or ovreturning axis of equipment base. This shift of overturning axis of equipment base is able to reduce the factor of safety about 10%. Therefore, the adequate method for evaluating of effective height of side wall is required as further study.

  • PDF

소규모 플랜트 기자재의 고장밀도함수가 가용도에 미치는 영향 평가 (A Study on the Availability Evaluation with Failure Density Function of Equipment of Small-scale Plant)

  • 이홍철;황인주
    • 한국유체기계학회 논문집
    • /
    • 제19권3호
    • /
    • pp.33-36
    • /
    • 2016
  • The investigation on the verification of availability simulation for small-scale plant has been carried out. This study focuses on the availability variation induced by number of equipment and iteration with failure density function. The equipment classification of small-scale plant and failure type and the methodologies on Monte-Carlo simulation are established. The availability deviation with programs showed under Max. 1.7% for the case of normal function. This method could be used to availability evaluation of small-scale plant, but calibration of the failure density function is necessary for general application.

추정모델에 의한 화력발전 플랜트 계측데이터의 검증 및 유효화 (Estimation Model-based Verification and Validation of Fossil Power Plant Performance Measurement Data)

  • 김성근;윤문철;최영석
    • 한국정밀공학회지
    • /
    • 제17권2호
    • /
    • pp.114-120
    • /
    • 2000
  • Fossil power plant availability is significantly affected by gradual degradations of equipment as operation of the plant continues. It is quite important to determine whether or not to replace some equipment and when to replace the equipment. Performance calculation and analysis can provide the information. Robustness in the performance calculation can be increased by using verification & validation of measured input data. We suggest new algorithm in which estimation relation for validated measurement can be obtained using correlation between measurements. Input estimation model is obtained using design data and acceptance measurement data of domestic 16 fossil power plant. The model consists of finding mostly correlated state variable in plant state and mapping relation based on the model and current state of power plant.

  • PDF

해양플랜트 유지보수장치 엔지니어링을 위한 장비 배치 검증수행모델에 관한 연구 (A Study on the Model of Equipment Layout Verification for Offshore Plant Maintenance Equipment Engineering)

  • 한성종;박범
    • 플랜트 저널
    • /
    • 제13권4호
    • /
    • pp.41-47
    • /
    • 2017
  • 본 논문은 해양플랜트 입찰단계에서 시스템엔지니어링(Systems Engineering)기법을 이용하여 해양플랜트를 구성하고 있는 장비 배치를 검증(Verification)할 수 있는 검증수행모델에 대한 연구이다. 해양플랜트 상부구조물(Topside) 유지보수 장비들을 엔지니어링하기 위하여는 Topside 장비 Layout검증이 선행되어야 한다. 하지만 입찰단계에서 완성도가 높지않는 FEED(Front End Engineering Design)결과물로 인한 많은 오류가 존재함에도 불구하고 검토시간의 부족 등의 이유로 검증을 수행하지 못하는 경우가 존재한다. 따라서 본 논문에서는 다학제간 접근방식인 시스템엔지니어링 프로세스를 간략화하여 적용함으로써 제한된 시간내 효과적으로 장비배치를 검증할 수 있는 검증수행모델을 제안하였다. 모델의 구성은 기능전개모델(Functional Deployment Model)을 통하여 구축하였으며 사례연구를 통하여 본 Topside 장비 배치에 대한 검증 수행모델을 검증하였다.

  • PDF