Abstract

This paper is a study on validation model that can verify the arrangement of equipment constituting offshore plant using system engineering approach in offshore plant tender stage. In order to design offshore plant topside maintenance equipment, topside layout verification should be preceded. However, there are many errors in the bidding stage due to the FEED results that are not perfect, the verification can not be performed sufficiently due to the limitation of the bidding period and others reasons. Therefore, we propose a validation model that can effectively verify the equipment layout within a limited condition by simplifying the main process in the system engineering process, which is a multidisciplinary approach, and confirmed through the Functional Deployment Model. Also, we verified the validation model for topside equipment deployment through case studies.

본 논문은 해양플랜트 입찰단계에서 시스템엔지니어링(Systems Engineering)기법을 이용하여 해양플랜트를 구성하고 있는 장비 배치를 검증(Verification)할 수 있는 검증수행모델에 대한 연구이다. 해양플랜트 상부구조물(Topside) 유지보수 장비들을 엔지니어링하기 위하여는 Topside 장비 Layout검증이 선행되어야 한다. 하지만 입찰단계에서 완성도가 높지않는 FEED(Front End Engineering Design)결과물로 인한 많은 오류가 존재함에도 불구하고 검토시간의 부족 등의 이유로 검증을 수행하지 못하는 경우가 존재한다. 따라서 본 논문에서는 다학제간 접근방식인 시스템엔지니어링 프로세스를 간략화하여 적용함으로써 제한된 시간내 효과적으로 장비배치를 검증할 수 있는 검증수행모델을 제안하였다. 모델의 구성은 기능전개모델(Functional Deployment Model)을 통하여 구축하였으며 사례연구를 통하여 본 Topside 장비 배치에 대한 검증 수행모델을 검증하였다.

Keywords

References

  1. NASA. 2007. Systems Engineering Handbook, Revision 1. Washington, DC, USA: National Aeronautics and Space Administration (NASA). NASA/SP-2007-6105.
  2. API(America Petroleum Institute), 2017, API RP 17A: Design and Operation of Subsea Production Systems-General Requirements and Recommendation.
  3. Kee-young Shin et el. 2014. "A Study on Application of Systems Engineering Approach to Designing Continuous Casting System". Journal of the Korea Society of Systems Engineering, 10(2): 15-20. https://doi.org/10.14248/JKOSSE.2014.10.2.015
  4. Sun Young Kim, Jae-Min Cha, Junpil Kim, Suk-Hwan Suh1, and Hwal Won Sur1, 2041, "A Systems Engineering Approach to FEED Work Process Development for Refinery Plant," Journal of the Korea Society of Systems Engineering, Vol 10, No, 1, pp 1-15 https://doi.org/10.14248/JKOSSE.2014.10.1.001
  5. D.G., Hong, H.C., Byun, S.H., Suh, 2014, "Developing empirical connections based on interrelation analysis between technical activities of systems engineering and FEED process in plant construction industry," 24th Annual INCOSE International Symposium, Las Vegas, NV, June 30-July 3
  6. Dae Geun Hong, Hee Chul Byun, Suk-Hwan Suh, 2014, "A Effective Analysis and Management of Technical Risk to Turn-key based Plant Construction Contracts using Systems Engineering," Journal of the Korea Society o f Systems Engineering, Vol.10 No.2, p.59-69 https://doi.org/10.14248/JKOSSE.2014.10.2.059
  7. Sirous Yasseri, 2014, "Application of Systems engineering to subsea development, Underwater Technology,"Vol. 32, no. 2, pp. 93-109 https://doi.org/10.3723/ut.32.093
  8. K.Dykes and R.Meadows, 2011, Applications of Systems Engineering to the Research, Design, and Development of Wind Energy Systems Technical Report NREL/TP-5000-52616
  9. INCOSE. 2012. Systems Engineering Handbook: A Guide for System Life Cycle Processes and Activities, version 3.2.2. San Diego, CA, USA: International Council on Systems Engineering (INCOSE), INCOSETP-2003-002-03.2.2.
  10. ISO/IEC 15288, Systems and Software Engineering-System Life Cycle process, 2008, International Organization for Standardization (ISO).