The safety accidents of domestic construction happened more than other industries is performed only under the construction stage. In the foreign countries, however, owners and designers play an important role on safety in an early stage. Therefore, numerous studies were carried out by getting rid of accident risks and institutionalizing prevention activities in an construction stages. Accordingly, this study have performed to deduce the pivotal point of safety management items classified by the subject suitable for construction by introducing of safety conception of domestic and international design and suggested the improvement methods of safety management plans of the planning design stage so as to perform more efficient safety management.
Proceedings of the Korean Society of Precision Engineering Conference
/
2003.06a
/
pp.899-904
/
2003
Tight integration of product design and process planning in the early design stage would make bigger impact as wider spectrum of design and manufacturing alternatives can be pursued and evaluated. Thus the development of systematic computer-based support for this integration is desirable. For this integration and process planning in the early design stage. the systematic method to synthesize shape of part from functional requirements is crucial. This research presents the methods of functional decomposition from overall function or product and synthesizing shape of part based on functional relations extracted from functional decomposition using planetary gear transmission system as an example.
Journal of the Korean Society for Precision Engineering
/
v.21
no.11
/
pp.140-148
/
2004
Tight integration of product design and process planning in the early design stage would make bigger impact as wider spectrum of design and manufacturing alternatives can be pursued and evaluated. Thus the development of systematic computer-based supporting for this integration if desirable. For this integration and process planning in the early design stage, the systematic method to synthesize shape of part from functional requirements is crucial. This research presents the methods of functional decomposition from overall function of product and synthesizing shape of part based on functional relations extracted from functional decomposition using planetary gear transmission system as an example.
Journal of the Korean Operations Research and Management Science Society
/
v.4
no.1
/
pp.25-31
/
1979
We consider the optimal ordering policy for a single-product two-stage inventory system where the main assumptions are as follows: (i) constant continuous demand only at stage 2, (ii) constant input (production) rate at stage 1, (iii) instantaneous delivery (transportation) from stage 1 to stage 2, (iv) backlogging is allowed only at stage 2, (v) an infinite planning horizon. Costs considered are ordering and linear holding costs at both stages, and linear shortage cost only at stages 2. By solving 9 different case problems, we have observed the general from of the optimal ordering policies for our model which minimizes the total cost per unit time. It is noticeable from this observation that the questionable but more often than not adopted assumption by many authors in determining the optimal potimal policy for multistage inventory systems, that the ordering (lot) sizes at each stage remain constant thruout the planning horizon, is not valid.
International conference on construction engineering and project management
/
2011.02a
/
pp.324-329
/
2011
Significant decisions are made by the project team during the early planning phase of capital facility project developments. The preproject planning phase begins after a decision is made to proceed with a project concept and continues until the detail design stage. Many of the industry practitioners and researchers have recognized the importance of preproject planning and that inadequate early planning is one of the key factors affecting project success. Nevertheless, the preproject planning practices vary significantly for the construction industry in Taiwan and the quality of preproject planning relies heavily on individual project team's experience. This research sets out to benchmark the preproject planning practice for the building construction industry in Taiwan. From late 2007 to early 2010, the researchers collected information from a total of 92 building construction projects using questionnaire survey. The analysis results show that the surveyed projects with better preproject planning have better cost and schedule performances on average. It is recommended that project team spend more efforts in the preproject planning stage to have a better chance of achieving project success.
Journal of the Korean Operations Research and Management Science Society
/
v.18
no.1
/
pp.1-18
/
1993
The family disaggregation model of hierarchical production planning (HPP) is the problem of (0 -1) mixed integer programming that minimizes the total sum of setup costs and inventory holding costs over the planning horizon. This problem is hard in a practical sense since optimal solution algorithms have failed to solve it within reasonable computation times. Thus effective familoy disaggregation algorithm should be developed for HPP. The family disaggregation algorithm developed in this paper consists of the first stage of finding initial solutions and the second stage of improving initial solutions. Some experimental results are given to verify the effectiveness of developed disaggregation algorithm.
International Journal of Precision Engineering and Manufacturing
/
v.2
no.3
/
pp.69-78
/
2001
This paper presents a process and operation planning system and an NC code post-processor for effective machining of press dies for production of cars. Based on the machining feature, major parts of press dies are categorized into 15 groups and a standard process plan is defined for each group. The standard process plan consists of a series of processes where a process is defined as a group of operations that can be done with one setup. Details such as cutting tools, cutting conditions, and tool paths are decided at the operation planning stage. At the final stage of process and operation planning, the NC code post-processor adjusts feedrates along the tool path to reduce machining time while maintaining the quality. The adjustment rule is selected based on the machining load estimated by virtual machining.
The purpose of this study is to provide a reference for stage space planning in modern theaters by analyzing and understanding stage components in terms of spatial composition, purposes, and correlation between them, and collecting various opinions from stage managers an directors. The findings are as follow: the determination of the size of proscenium arch is crucial, and it needs to be considered not only with the genre of the performance and the number of seats, but also with the size of the stage facility. The two-dimensional size of proscenium arch affects the scale of stage area in three-dimensional way; the size of main stage comes from the width of the arch, and the length of set battens comes from the stage width, and so on. The height of the arch affects the elevation of gridiron, and the height of the building itself ultimately. The number and length of the set battens are directly linked to the size of the winch room, and so is the number of the winches to the Mcc panel room. The 1st level gallery supplying power to lighting equipment needs to be wide enough for staffs to work with various equipments effectively and safely. Degree of practical usage of under-stage machinery turned out to be very low. In order to cut unnecessary waste and cost, the characteristics of the theater must get set first, and experts who know how stage works need to get involved in planning stage.
The purpose of this study is to examine the effects of the rural community planning focusing on the stepwise empowerment system in Jinan-gun, Jeollabuk-do province. This paper also tries to examine how this system affect the awareness for community planning and empowerment of the residents. The satisfaction of the people who join this program were also investigated. The subjects of the research were divided into two groups. Group A consisted of the people who join the system from the first stage, and group B consisted of the people who joined the fourth stage directly. The differences of the recognition, capability changes and satisfaction between two groups were compared and analyzed by questionnaires. The results of this research can be summarized as follows. The first, group A recognized the community planning system in Jinan-gun more positively than group B. They thought that it's very useful and beneficial for their community and this system should be continued further. The second, group A considered that they achieved bigger advancement in community design capabilities in terms of personal, relational and social aspects than group B. In addition, group A also showed higher satisfaction for rural community planning than group B. Based on the results, alternatives for rural community planning were drawn as follows. The first, considering that group A showed more positive responses, starting from the first stage is more stable way to succeed in rural community planning. Which means the critical condition of community design is not the community business but the improving the public awareness and community mind. The second, it's considered that the number of participation is proportional to the advancement of capability in community project, so improving residents' opportunity to participation in community design might be effective. The third, community leader is another critical condition. It is needed to pay more attention to the education for the rural community leader with good experience and capability of community affairs.
Landscape elements of historical and cultural value and elements that have negative impact on landscape due to reckless development teem in rural area. Due to this, local government has established a visual landscape plan. The purpose of this study is to analyze the process and content of domestic rural landscape planning process and to suggest improvements for it. For that, this study measure guideline of Ministry of Agriculture, Food and Rural Affairs against guideline of Ministry of Land, Infrastructure and Transport. To analyze the landscape planning guideline of australia which is similar to domestic rural landscape planning process, and to compare both guidelines. The results of this study are as follow. The stage of landscape resource survey and assessment progressed systematically, but it was not practical because for the lack of survey and assessment method. Therefore, it should be suggested for the survey and assessment technique. The rural landscape plan, established in master planning stage, do not necessarily reflect local government's landscape management on the ground of abstract technic of landscape management. For this sake, to develop evaluation method for development of landscape element seems necessary.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.