• Title/Summary/Keyword: Planning Simulation

Search Result 1,678, Processing Time 0.03 seconds

Production Line Planning for Functional Sports Wear using Simulation Model (시뮬레이션을 이용한 특수 고기능 의류업체의 생산라인 설계에 관한 연구)

  • 최정욱
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.26 no.8
    • /
    • pp.1205-1215
    • /
    • 2002
  • The purpose of this study was to develop a production line using simulation method, which could improve work allocation, labor utility and productivity. Using simulation software AIM, a simulation model of functional sports wear assembly line was developed. A functional sports wear production factory were analysed to gather data necessary for this research. Factory layouts, production facilities, work time of each unit jobs were investigated. The data obtained were used as to build a base simulation model. Then, the base simulation model was verified using the obtained data, such as daily productivity. Using simulation method, low alternative production plans were suggested, which were to enhance productivity, and work efficiency and to reduce queue length and throughput time.

A Study on GIS Information System for Shipbuilding Yard Block Logistics Simulation (조선소 야드 블록 물류 시뮬레이션을 위한 GIS 정보 체계 연구)

  • Kim, Sanghun;Lee, Yonggil;Woo, Jonghun;Lim, Hyunkyu
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.55 no.2
    • /
    • pp.116-123
    • /
    • 2018
  • These days, geographic information system has released in everyday life and industries. However, the shipyard only uses it to manage the layout of the yard. In this study, we apply the Geographic Information System to shipbuilding block logistics simulation to analyse the behavior of bogies and forklifts carrying blocks and materials in the shipyard. The shipyard manages daily block logistics plans at the execution planning stage. However, since it is a daily plan, it is difficult to respond to an unexpected situation immediately, and application to judge a certain value or higher value is insufficient. Therefore, a simulation model was created using the shape and attribute information inherent in the geographic information system to verify and improve the block logistics of the mid-and long-term yards. Through this simulation model, we will analyse loads on the workplace, stockyard, and road, and contribute to overall logistics improvement from the point of view of resource planning. In addition, the results of the simulation are reflected in the planning, to help support various decisions.

An Application of Simulation Method to Planning of Road Pavement Operation (시뮬레이션을 이용한 도로포장 공정계획의 수립방안)

  • Ohn, Seong-Won;Kim, Ok-Ki;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.124-131
    • /
    • 2007
  • Project management means usually managing the rate of construction progress. But it also contains preparing scheme of execution and establishing plan for equipment, material, labor force to finish project within expected duration. In this paper to establish effective project planning a road pavement operation is selected as a case and simulation method is used for analyzing it. Next probability distributions are created after analyzing collected data and these are reflected in simulation model. Simulated result is compared with real project planning using models of lean concrete pavement process and concrete slab pavement process to verify efficiency of this model. In the event we know that project planning using simulation is more effective than one of the field in the aspects of duration and cost. Meanwhile simulated result in this paper has a limitation in accuracy because various constraints of filed are not reflected in it. However if we reflect this constraints in model through examining field in future this limitation is expected to be improved.

Platform development of adaptive production planning to improve efficiency in manufacturing system (생산 시스템 효율성 향상을 위한 적응형 일정계획 플랫폼 개발)

  • Lee, Seung-Jung;Choi, Hoe-Ryeon;Lee, Hong-Chul
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.16 no.2
    • /
    • pp.73-83
    • /
    • 2011
  • In the manufacturing system, production-planning is very important in effective management for expensive production facilities and machineries. To enhance efficiency of Manufacturing Execution System(MES), a manufacturing system that reduces the difference between planning and execution, certain production-planning needs a dispatching rule that is properly designed for characteristic of work information and there should be a appropriate selection for the rule as well. Therefore, in this paper dispatching rule will be selected by several simulations based on characteristics of work information derived from process planning data. By constructing information that are from simulation into ontology, one of the knowledge-based-reasoning, production planning platform based on the selection of dispatching rule will be demonstrated. The platform has strength in its wider usage that is not limited to where it is applied. To demonstrate the platform, RacerPro and Prot$\acute{e}$g$\acute{e}$ are used in parts of ontology reasoning, and JAVA and FlexChart were applied for production-planning simulation.

Framework on Database Development based on Modular Simulation Model Implementation for Curtain Wall Operations in High-rise Buildings (초고층 커튼월공사 MSM 구성 및 데이터베이스 구축을 위한 프레임워크)

  • Lee, Tae-Hee;Ko, Yong-Ho;Kim, Tae-Hyung;Shin, Young-Keun;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.301-302
    • /
    • 2012
  • Recently, high-rise building projects have been in the spotlight in South Korea. Curtain wall construction, as one of important operations in the high-rise building projects is composed of various, entangled and complex unit processes that require a systematic planning to prevent unexpected delays. A schedule simulation technique has been used for deriving more efficient planning and accurate performance measurement. However, the simulation technique has difficulty in collecting actual data and in applying data fluctuations during construction. Thus, this paper suggests a concept model of Modular Simulation Model(MSM) that overcomes such limitations of traditional simulation technique based on curtain wall operations.

  • PDF

Mission Planning for Underwater Survey with Autonomous Marine Vehicles

  • Jang, Junwoo;Do, Haggi;Kim, Jinwhan
    • Journal of Ocean Engineering and Technology
    • /
    • v.36 no.1
    • /
    • pp.41-49
    • /
    • 2022
  • With the advancement of intelligent vehicles and unmanned systems, there is a growing interest in underwater surveys using autonomous marine vehicles (AMVs). This study presents an automated planning strategy for a long-term survey mission using a fleet of AMVs consisting of autonomous surface vehicles and autonomous underwater vehicles. Due to the complex nature of the mission, the actions of the vehicle must be of high-level abstraction, which means that the actions indicate not only motion of the vehicle but also symbols and semantics, such as those corresponding to deploy, charge, and survey. For automated planning, the planning domain definition language (PDDL) was employed to construct a mission planner for realizing a powerful and flexible planning system. Despite being able to handle abstract actions, such high-level planners have difficulty in efficiently optimizing numerical objectives such as obtaining the shortest route given multiple destinations. To alleviate this issue, a widely known technique in operations research was additionally employed, which limited the solution space so that the high-level planner could devise efficient plans. For a comprehensive evaluation of the proposed method, various PDDL-based planners with different parameter settings were implemented, and their performances were compared through simulation. The simulation result shows that the proposed method outperformed the baseline solutions by yielding plans that completed the missions more quickly, thereby demonstrating the efficacy of the proposed methodology.

A Simulation Study on Capacity Planning in Reentrant Hybrid Flowshops (재투입이 존재하는 혼합흐름공정의 용량계획에 관한 시뮬레이션 연구)

  • Lee, Geun-Cheol;Hong, Jung Man;Kim, Jung-Ug;Choi, Seong-Hoon
    • Journal of the Korea Society for Simulation
    • /
    • v.25 no.1
    • /
    • pp.45-52
    • /
    • 2016
  • In this study, we consider a capacity planning problem of reentrant hybrid flowshops. High-tech electronic products such as semiconductor or TFT-LCD, are produced from manufacturing systems which can be considered as reentrant hybrid flowshops. In the considered capacity planning problem, we determine the number of machines at each stage in the manufacturing system. We introduce criteria indicating which stage needs additional machines or which stage needs reduction of machines considering the characteristics of the product types and the manufacturing system. The objective function of the problem is maximizing throughput rate of the system, of which values are obtained from the simulation model depicting the hybrid flowshops. The performance of the proposed methods were evaluated through a series of computational experiments. The simulation model was also used for conducting the comparison experiments among the proposed method and benchmarks.

Quality Verification of Legacy Data of Manufacturing Information System to Improve Results of Shipyard Manufacturing Logistics Simulation (조선소 생산물류 시뮬레이션 결과 정도 향상을 위한 생산정보시스템 기간 정보 검증)

  • Lee, Jonghak;Lee, Philippe;Yoon, Kyungwon;Nam, Jong-Ho
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.51 no.6
    • /
    • pp.510-520
    • /
    • 2014
  • Unlike other mass production in small variety, shipbuilding process is a project-based method in single variety, which causes unpredictable volatility in the planning system. In shipyards, series of manufacturing processes from fabrication to erection is sequentially carried out. In order to predict unfavorable changes such as overload or low load of working volume, computerized simulation has been being gradually adopted. The data used in the simulation are processed from the database of the main scheduling and planning system. Thus the quality of those data is very crucial for the meaningful results. Unfortunately, research on the verification of data quality is very rare and hardly known to the authors. In this work, using the database of scheduling and product information system of a large domestic shipyard, the data required for the simulation are qualitatively analyzed and verified.

Top-down Behavior Planning for Real-life Simulation

  • Wei, Song;Cho, Kyung-Eun;Um, Ky-Hyun
    • Journal of Korea Multimedia Society
    • /
    • v.10 no.12
    • /
    • pp.1714-1725
    • /
    • 2007
  • This paper describes a top-down behavior planning framework in a simulation game from personality to real life action selection. The combined behavior creating system is formed by five levels of specification, which are personality definition, motivation extraction, emotion generation, decision making and action execution. Along with the data flowing process in our designed framework, NPC selects actions autonomously to adapt to the dynamic environment information resulting from active agents and human players. Furthermore, we illuminate applying Gaussian probabilistic distribution to realize character's behavior changeability like human performance. To elucidate the mechanism of the framework, we situated it in a restaurant simulation game.

  • PDF

A Study on Refrigerate Warehouse Facility Performance Planning for Picking and Replenishing Facility Using Simulation Method (냉장창고설비의 픽킹 및 재 보충설비계획문제의 연구)

  • Hwang Heung Seok;Jo Gyu Seong;Choe Bae Seok
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.05a
    • /
    • pp.1035-1041
    • /
    • 2003
  • Recent studies among various activities taking place in order-picking warehouse system have shown various researches to reduce the order-picking costs occupying more than half the total costs. One way of improving the warehouse system performance is to separate from a picking area and a reserve area in one unit rack. This study is concerned on the performance evaluation model for picking and replenishing facility of refrigerated warehouse using simulation method. In this study, we developed a mathematical model to compute the system performance solve this problem using simulation method. We demonstrate the system performance using AutoMod Simulator and verify the results to compare mathematical results of the system performance of warehouse system. A systematic approach proposed n this study for an optimal planning of order-picking warehouse is known as an effective method for planning of order-picking warehouse and a performance evaluation problem considering both picking and replenishment.

  • PDF