• Title/Summary/Keyword: Plan water use

Search Result 330, Processing Time 0.031 seconds

Evaluation of Water Productivity of Thailand and Improvement Measure Proposals

  • Suthidhummajit, Chokchai;Koontanakulvong, Sucharit
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.176-176
    • /
    • 2019
  • Thailand had issued a national strategic development master plan with issues related to water resources and water security in the entire water management. Water resources are an important factor of living and development of the country's socio-economy to be stable, prosperous and sustainable. Therefore, water management in both multidimensional and multi-sectoral systems is important and will supports socio-economic and environmental development. The direction of national development in accordance with the national strategic framework for 20 years that requires the country to level up security level in terms of water, energy and food. To response to the proposed goals, there is a subplan to increase water productivity of the entire water system for economical development use by evaluating use value and to create more value added from water use to meet international standard level. This study aims to evaluate the water productivity of Thailand in each basin and all sectors such as agricultural sector, service and industrial sectors by using the water use data from water account analysis and GDP data from NESDB during the past 10 years (1996-2015). The comparison of water productivity with other countries will also be conducted and in addition, the measures to improve water productivity in next 20 years will be explored to response to the National Strategic Master Plan goals. Water productivity is defined as output per unit of water depleted. The simplest way to compare water productivity across different enterprises is in monetary terms. World Bank presents water productivity as an indication of the efficiency by which each country uses its water resources. There are two data sets used for water productivity analyses, i.e., the first is water use data at end users and the second is Gross Domestic Product. The water use at end users are estimated by water account method based on the System of Environmental-Economic Accounting for Water (SEEA-Water) concept of United Nations. The water account shows the analyses of the water balance between the use and supply of each water resource in physical terms. The water supply and use linkage in the water account analyses separated into each phases, i.e., water sources, water managers, water service providers, water user at end user under water regulators of all kinds of water use activities such as household, industrial, agricultural, tourism, hydropower, and ecological conservation uses. The Gross Domestic Product (GDP), a well- known measuring method of the national economic growth is not actually a comprehensive approach to describe all aspects of national economic status, since GDP does not take into account the costs of the negative impacts to natural resources that result from the overexploitation of development projects, however, at present, integrating the environment with the economy of a country to measure its economic growth with GDP is acceptable worldwide. The study results will show the water use at each basin, use types at end users, water productivity in each sector from 1996-2015 compared with other countries, Besides the productivity improvement measures will be explored and proposed for the National Strategic Master Plan.

  • PDF

Monitoring Land-use Changes by Remote Sensing and GIS Techniques: Case Study of Barind Tract, Bangladesh

  • Sohel, Md. Shawkat Islam;Rana, Md. Parvez;Islam, A.Z.M. Zahedul;Akhter, Sayma
    • Journal of Forest and Environmental Science
    • /
    • v.27 no.2
    • /
    • pp.73-79
    • /
    • 2011
  • The Barind tract is threatened by desertification and undergoing rapid change. In view of this fact it is very much essential to manage this barind tract under proper land-use plan. The present study evaluates the effectiveness of high-resolution satellite data and computer aided GIS techniques in assessing land-use change detection for the period 1990 to 2007 within the study area, which is very much essential to manage this barind tract under proper land-use plan, and for proper land-use plan it is necessary to get reliable information. The present study found five major land-use such as current fallow, current agriculture, settlement, irrigation water and water bodies. From the result, it is found that current fallow and water bodies decrease while settlement and current agriculture increase. Study concludes that as Barind tract is threatened by desertification, decrease of water bodies is not a good sign for the study area.

Balancing Multiple Needs in Conflicts for an Urbanized River Basin

  • Yoshitani, Junichi
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.53-57
    • /
    • 2007
  • Tsurumi River Basin successfully started to prepare a Water Master Plan though a series of discussions by gathering all stakeholders in a hall. It began with setting five management targets namely, flood, low flow, natural environment, emergency use, and recreational use, followed by setting management goals by target as well as a one-sentence catchphrase for the Water Master Plan using a bottom-up approach. The author reviews this process and discusses the background of the success.

  • PDF

A Study on the Allocation of Permissible Water Pollution Load in the Total Water Pollution Load Management Plan (수질오염 총량관리계획과정의 오염부하량 할당에 관한 연구 - 경기도 광주시를 사례로 -)

  • Kim, Sie-Heon;Rim, Jay-Myung
    • Journal of Environmental Impact Assessment
    • /
    • v.14 no.5
    • /
    • pp.337-346
    • /
    • 2005
  • Pollution load allocation can likely be much controversial, which is essential to formulate the total water pollution load management plan. Existing rules(or guidances) in Korea, can provide no specific criteria for load allocation. Therefore, this paper studied(comprehensively) possible standards how or why to choose any particular allocation method, which was applied in the Gwangju City's load allocation for the satisfaction of set water quality goal. This load allocation is basically focused on the load reduction of domestic wastewater rather than industrial wastewater, because the land-use is strictly regulated and larger sources of pollution are few in the Gwangju City. This paper recommends the city to increase the capacity of sewage treatment plants, promote sewerage maintenance, and set higher effluent standards.

The Influence on the Runoff Characteristics by the Land Use in Small Watersheds (소유역의 토지이용이 유출 특성에 미치는 영향)

  • Choi, Ye-Hwan;Choi, Joong-Dae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.204-208
    • /
    • 2004
  • In the forthcoming 21C, the barometer of cultural lives depends on that the water demand will increase or not. On the opposite site of that, the small watersheds will influence directly on how to cover the surface of watersheds with land use, no planning developing watersheds, and the rearrangement of small rivers. Espacially as the exordinary climatic phenomena, water resources and water content of the small watersheds will be confused oil exactly not to make a plan of water resources. This study area has four small watersheds groups in Gangwon-Do Province, that is, group I five small river watersheds including Changchoncheon etc., group II fiver rivers watersheds including to Hwalsanmogicheon etc., group III five small river watersheds including Singicheon etc., group IV including to Sabulanggolcheon etc. According to the land use such as dry field(or farm), ice field, forest land, building lot arid others, in small watersheds, the amount of runoff will be impacted by precipitation. The comparison between the runoff was getting from Kajiyama Formular and calculated runoff from multi-linear regressed equations by land use percentage was performed. Its correlation which was estimated by coefficient of correlation will be accepted or not, as approched 1.00000 values. As the monthly water resources amount is estimated by multi-linear regressed equations, we make a plan to demand and supply the water quantity from small river watersheds during any return periods.

  • PDF

Water Resources Management Challenge in the Citarum River Basin, Indonesia

  • Wicaksono, Albert;Yudianto, Doddi;Jeong, Gimoon;Kang, Doosun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.198-198
    • /
    • 2016
  • The Citarum River Basin is the biggest river basin in West Java Province, Indonesia and it plays strategic roles in providing water for irrigation, domestic and industrial uses, and power generation, besides controlling the flood during rainy season. Flowing through seven major cities makes the river flow and water demand are vulnerable to land use change around the river. The present water resources management has involved the regulator, operator, and users in deciding an appropriate water management plan for the entire basin. The plan includes an operation plan for three reservoirs, construction or maintenance of the river channel, and water allocation for all users along the river. Following this plan, a smaller operation group will execute and evaluates the plan based on the actual flow condition. Recently, a deforestation, environment degradation, river sedimentation, a rapid growth of population and industry, also public health become new issues that should be considered in water basin planning. Facing these arising issues, a new development program named ICWRMIP was established to advance the existing management system. This program includes actions to strengthen institutional collaboration, do the restoration and conservation of the river environment, improve water quality and public health, also advance the water allocation system. At present, the water allocation plan is created annually based on a forecasted flow data and water usage prediction report. Sometimes this method causes a difficulty for the operator when the actual flow condition is not the same as the prediction. Improving existing system, a lot of water allocation studies, including a development of the database and water allocation simulation model have been placed to help stakeholders decide the suitable planning schemes. In the future, this study also tries to contribute in advancing water allocation planning by creating an optimization model which ease stakeholders discover a suitable water allocation plan for individual users.

  • PDF

A Study on disorderly developments and the laws related to land use in rural areas (난개발과 농어촌지역 토지이용 관련법규에 관한 연구)

  • Lee, Eul-Gyu
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.15 no.2
    • /
    • pp.53-60
    • /
    • 2013
  • In recent years, several problems occur due to irrational development in rural areas. The first, disorderly development and Encroachment of farmland, Small factory built in rural areas leads to a lack of infrastructure. it is the damage factors of good scenery in the rural areas. Water pollution and environmental pollution from the accommodations and restaurants in the good scenery area is serious. To solve this problems, we should establish the systematic land use plan and landscape plan, and integrated spatial and business plan in rural areas. In order to increase the effectiveness of land use planning in rural projects, We should establish the land use plan in rural areas of the city, state, and national levels of regional plan. We need to prescribe in "National Land Use Planning Law" the facilities, can install it according to the characteristics of rural land programming. we can prescribe the detail regulations by "Rural Maintenance Law". In order to solve the problems the lack of professionalism of the current agricultural policies of the Review Committee, We need to consider a new "rural planning committee" consisting.

Evaluation of Emergency Water Supply Plan for Block System of Water Network using WaterGEMS (WaterGEMS모형을 이용한 상수관망 블록시스템의 비상급수계획 평가)

  • Baek, Chun-Woo;Jun, Hwan-Don;Kim, Joong-Hoon;Yoo, Do-Guen;Lee, Kwang-Choon
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.6
    • /
    • pp.15-20
    • /
    • 2008
  • Hydraulic analysis of water distribution system can be divided into demand-driven analysis and pressure-driven analysis. Demanddriven analysis can give unrealistic results to simulate hydraulic conditions under abnormal operating conditions such as sudden demand increase and pipe failure. In Korea, demand-driven analysis has been used to establish emergency water supply plan in many water projects, but it is necessary to use pressure-driven analysis for establishment of emergency water supply plan. In this study, WaterGEMS model that was developed for pressure-driven analysis is used to evaluation of emergency water supply plan of J city. As the results, it was able to draw up more efficient plan for water supply in small block, and established emergency water supply plan of J city was determined to be appropriate.

A Study of Optimal Water Supply Planning in Mountainous Area (산지유역에서의 최적용수공급방안에 관한 연구)

  • Kim, Ji-Hak;Park, Ki-Bum
    • Journal of Environmental Science International
    • /
    • v.15 no.10
    • /
    • pp.967-973
    • /
    • 2006
  • In this study used tank model and specific discharge to calculate low-flow of mountain basin and supply data that need in water resources plan. Low-flow is calculated byspecific discharge and area ratio method as resulted that calculate storage of low-flow by tank model was construed that showd all similar aspect. In judged to help in water resources plan establishment calculating low-flow using model to supplement uncertainty of observed data in that calculate of low-flow ungaged mountain area. It shows by economical and realistic plan until 12 years after development that run parallel and use economic performance analysis result valley flow and groundwater. But wide area water services and Chungju dam since 12 years onward was expose that is economic.