공동주택 공종별 수선시기 설정 연구 (A Study on the Repair Time of the Construction Type in the Apartment Housings)

  • 이강희;박근수;채창우
    • 한국주거학회논문집
    • /
    • 제22권4호
    • /
    • pp.83-92
    • /
    • 2011
  • Apartment is settled down as a main housing type and massive supply has been conducted since 1990's. The government has focused on the housing supply to improve the housing number and cut its price. On the contrary, the management of the housing has been neglected to get an early deterioration. Since 1995's, various ways have been made to improve and maintain the building function and performance. Among these, the long-term repair plan has played a main role to manage the housing condition and plan the repair schedule for preparing the massive cost of repair such as a roof proof, elevator change. The long-tern repair plan provides the repair time and repair rate according to various construction types. Most of the management agent apply the repair standard into the field area. But the repair time could not reflect the present condition and bring into the wrong maintenance. Therefore, the repair time for the long-term maintenance plan would be revised and reflected from the material and technology development. |n this study, it aimed at improvement for the repair time in various construction types which are provided in the long-term repair plan. For this, the 22 management agents are surveyed directly. This study shows that the repair time of the painting are correspondent to the repair time of the long-term plan irregardless of the painting materials. Most of other areas would correspondently similar to the long-term plan. This study could not include the building location, material and other haracteristics. Therefore, the further study would be needed to reflect the building and materials attributes to get the detailed repair time.

공동주택 장기수선계획 수립기준 항목 조정에 관한 기초 연구 (Preliminary Study on the Coordination of the Repair works' items of the Long Term Repair Plan in Apartment Housing)

  • 이강희
    • 한국주거학회논문집
    • /
    • 제27권4호
    • /
    • pp.13-22
    • /
    • 2016
  • The long term plan for apartment housing has a important role to make a decision making whether a repair work should be done or not. But, items for repair works are so various that field workers could not understand the context or plan the repair cost and time. These difficulties are drawn from the number of repair items, duplicated application and meaning, new material application and technology time-gap. Therefore, it needs to change or coordinate the repair items to improve the repair condition, reflecting the current material level or repair technologies. In this paper, it aimed at coordination of the repair items through the repair recording sheet which was surveyed in 22 metropolitan areas of Seoul, conducted between 2011 and 2014. The surveyed data are classified into six categories such as building exterior, building interior and so on, according to long term repair plan and the number of data are 1,918. It analyzed the appearing word for repair-concerned and compared the existing items of the long term plan. Items of building exterior are proposed as roof, exterior wall and painting. Building interior has a little meaning to propose the repair items. The water supply facilities are proper to keep the existing repair items. Items of the outdoor facilities could not need a sign board, drainage root and PVC sheath. Through this study, we can coordinate the repair items in apartment and provide the repair item and cost level.

공동주택의 장기수선계획 소요비용 예측모델 연구 (A Study on the Forecasting Model of the Required Cost for the Long-term Repair Plan in Apartment housings)

  • 이강희;유우상;채창우
    • KIEAE Journal
    • /
    • 제11권3호
    • /
    • pp.63-68
    • /
    • 2011
  • Building deterioration would be proceeded by various causes such as physical, social, economic degradation. The deterioration would be inevitably prevented or delayed to get the decent function and performance in various building part and components. The maintenance and management are continued to provide the decent living condition for the household. The maintenance means mainly a repair, including the on-time and longterm plan. The longterm repair would be conducted by the systemic preparation in management activity and a required cost. Therefore, the annual due for the longterm repair plan is important to prepare the repair cost in a required time. In this paper, it aimed at analyzing the longterm repair cost and modelling to forecast the required cost in total area, number of household and time elapse in apartment housing. The estimation model of a repair cost is used with a power function which has a good statistics. Results of this study are shown that the sample has a longterm repair due in a $2,032won/m^2{\cdot}yr$ averagely which is higher than $912won/m^2{\cdot}yr$ in domestic. Second, the longterm repair due is proportionally correlated with the time elapse in both a total area and the number of household. Third, the estimation model for the longterm repair amount is suitable for the power function which is most in any other estimation models. Fourth, the ration of the longterm plan repair due a year to the cumulated longterm amount is about 26%.

공종별 수선비용 추계모델을 활용한 공동주택 장기수선충당금 적립금액 산정 (Repair Accumulation Cost for the Long-Term Repair Plan in Multifamily Housing Using the Forecasting Model of the Repair Cost)

  • 이강희;채창우
    • KIEAE Journal
    • /
    • 제16권3호
    • /
    • pp.137-143
    • /
    • 2016
  • Purpose: Apartment housing should conduct a cyclic repair to keep and maintain the building performance since they are constructed. Therefore, the repair plan would be provided for long term period which explains the repair time, items and repair cost. Residents of apartment housing are responsible to pay for the repair activities. For repair cost, residents would reserve the money for repair little by little continuously until the required repair time because the repair cost takes a big burden for residents and lots of money a time. But, there is no systematic approach to provide the long term repair cost because it is no proper forecast of the repair cost to the upcoming repair time. In this study, it aimed at providing the monthly accumulation of the long term repair cost with the survey data in Seoul. Method: For these, the surveyed data are classified into 6 categories and number of data are 1,918. In addition, it developed the repair cost model for the 24 repair works and the cumulation function which is reflected with the each cost model. Result: This study are shown as follows : First, among the various estimation for the repair cost, the power function has a goodness of fit in statistics. Second, the monthly accumulation would be 12,840 won/household in size of $100,000m^2$ management area and $81.7won/m^2$ in size of the 1,000 household number during 40 years.

교육시설 내용년한 산정 연구 - 옥상방수와 바닥마감재를 대상으로 - (Establishment of the Service Life of the Education Fcilities - Focused on the Roof water-proof and Floor finishings -)

  • 이강희;채창우
    • 교육시설 논문지
    • /
    • 제24권6호
    • /
    • pp.27-36
    • /
    • 2017
  • Educational facilities have an affect to make a decently learning environment. After constructed, it needs a maintenance plan to keep the performance or function which provide the repair time, repair scope and ratio. But the fundamental data are so insufficient that the field worker can't provide the maintenance plan and has no choice use the other data which concerned with apartment or office building. Above all, the service life is indispensible to make a repair plan because the repair time and scope would be provided within the service life. This study aimed at providing the method to make a service life of component in educational facilities and applying the method into the roof proof and floor finishing. Results are shown that first, it is important to set the $1^{st}$ repair time after constructed. when it proposes the three ways with the probability approach, choice probability model and cumulative cost function. Second, the service life of roof proof is provided with about 35 years. In addition, the service life of the floor finishing is about 40 years. These result would be utilized to conduct the repair plan under the service life.

노후 아파트 공용설비부문의 하자발생과 보수비용 분석에 관한 연구 (A Study on the Analyses of Defect Occurrences and its Repair Costs in the Public Equipment of an Deteriorated Apartment House)

  • 전규엽;조극래;홍원화
    • 한국주거학회논문집
    • /
    • 제14권4호
    • /
    • pp.11-19
    • /
    • 2003
  • This study intends to predict prospective defects and establish the plan of Preventive Maintenance through research and analysis of defect occurrences and their repair costs in the public equipment of ‘H’ apartment house from 1998 to 2001. According to results of the analysis, more than 90% of defects and their repair costs for 4 years of the building have occurred in heating, hot water and water supply equipments. In case of specific classification in each equipment, more than 60% of defects were found at hot water pipes and heating pipes, and their repair costs covered more than 60% of the total defect costs. After two repairs by ‘Preventive Maintenance’ had been performed in the year 1998, total defects and defects of each equipment each yew have increased in number from 1999 to 2001. But total repair costs and repair costs of each equipment have not increased as time has gone by, because repair costs have relationship with the price of materials and labor, the part of defect and the scale of repair.

공공임대주택 유형별 구성재 사전예방보전 수선시기 설정연구 (Analysis of a Repair Time Preparation for the Preventive Maintenance in a Public Rental Housing Types)

  • 이강희;박근수;채창우
    • KIEAE Journal
    • /
    • 제12권5호
    • /
    • pp.35-42
    • /
    • 2012
  • The rental housing has been a main role to supply a living space to the household who can not be available for the home-owner. Specially, the public rental housing is targeted for the low-income household and supplied with low rental fee. Therefore, the rent owner should manage and maintain the housing condition decently with a systematically maintenance plan which includes a repair time and scope, a repair cost. Among them, the repair time is important to make a repair plan. The repair time would be explained with two types, which is divided into a breakdown maintenance and a preventive maintenance. Each of them has a advantage in a repair cost, maintenance of the living condition and provision of the repair scope and method. In this paper, it aimed at providing the repair time in 12 components of the public rental housing which is reflected from a preventive maintenance. This study shows that overall, a permanent rental housing has a longer repair time than any other rental housing in 12 housing components. A public rental housing is closer to the a permanent rental housing then a redevelopment rental housing in repair time. On the other hand, the repair time of the 12 housing components is different form the rental housing. This leads to further study in difference of the repair time according to a tenant type.

공동주택의 유지관리를 위한 장기수선계획에 관한 연구 (A Study of Long-term Repair Plan for Maintenance of Apartment Housing)

  • 한범진;김태희;김선국;한충희
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.355-358
    • /
    • 2002
  • 국내에서 1960년대부터 공동주택의 활발한 보급이 이루어지고 있는 반면, 공동주택의 물리${\cdot}$사회적 성능을 유지하여 수명을 연장시키기 위한 제도 및 표준적 유지관리 기법 등이 마련되지 못하여 시설안전 및 주거환경 문제가 발생하게 되었다. 이러한 현 상황 하에 공동주택의 유지관리를 통하여 주택의 수명을 증진함으로써 주택자원의 효율적인 이용이 시급한 실정이다. 공동주택의 유지관리 업무 측면에 있어 정확한 장기수선계획의 수립과 그에 따른 특별수선충당금 산정은 주택의 조기 노후화를 방지할 수 있다. 하지만 유지관리 행위주체인 주택 관리자들뿐 아니라 유지관리 대상시설물에 거주하는 입주자들에게 있어서 정확한 장기수선계획의 수립과 그에 따른 특별수선충당금의 적립에 관한 필요성 의식이 불충분한 현실이다. 장기수선계획의 미수립은 특별수선충당금의 비합리적인 적립을 허용하는 결과를 초래하고 있다. 따라서, 공동주택의 성능을 최대한 발휘하도록 하여 건물의 경제적 수명을 연장시키기 위하여 정확한 근거에 의한 장기수선계획의 수립과 그에 따른 특별수선충당금산정 방법을 제시하고자 한다.

  • PDF

자율 로봇의 오류 보정을 위한 이정표 상태 생성 방법 (Milestone State Generation Methods for Failure Handling of Autonomous Robots)

  • 한현구
    • 한국산학기술학회논문지
    • /
    • 제12권6호
    • /
    • pp.2760-2769
    • /
    • 2011
  • 지능형 자율 로봇은 주어진 목표를 달성하기 위하여 계획을 수립한다. 계획은 로봇이 목표를 달성하기 위한 행위들의 나열이며 모든 행위들이 순차적으로 그리고 성공적으로 실행되었을 때 목표를 달성하게 된다. 그러나 복잡하고 역동적인 현실 세계에서는 여러 가지 요인에 의하여 발생할 수 있는 예상하지 못한 상황으로 인하여 로봇이 계획한 행위들을 더 이상 실행하지 못하는 경우가 발생할 수 있다. 그러므로 지능형 자율 로봇은 이러한 돌발 상황을 적절히 대처하여 주어진 임무를 성공적으로 완수할 수 있는 효과적인 처리 방법을 가지고 있어야 한다. 이정표 상태를 이용한 계획 보정 방법은 이러한 상황을 효과적으로 처리할 수 있는 방법으로서 다른 계획 보정 방법들의 장점을 가지고 있다. 본 논문은 이정표 상태를 생성하는 방법으로 후진 방법과 이정표 상태들을 구성하는 조건들에 가중치를 부여하는 방법을 제안한다. 오류 보정 방법은 부여된 가중치를 보정해야 할 조건들의 우선순위로 사용할 수 있다. 후진 방법에 의하여 생성된 이정표 상태들은 복잡정도가 낮고 또한 적당한 값의 가중치를 가지게 되므로 이정표를 이용한 효율적인 계획 오류 보정 방법을 보장하게 된다.

Establishment of Service Life of Educational Facilities - Focused on the rooftop waterproofing and floor finishing -

  • Lee, KangHee;Chae, ChangU
    • KIEAE Journal
    • /
    • 제14권5호
    • /
    • pp.5-12
    • /
    • 2014
  • Building has been deteriorated gradually owing to geographic, physical complex and other factors. School living condition has a key role to improve the learning ability, life attitude and qualifications to adopt to social life. Therefore, it is important for school environment to keep the living condition. Repair time and scope of school facilities are required to maintain the function and performance to plan the long term repair. But there are little information about the school maintenance such as repair time and function. In this paper, it aimed at providing the service life to suggest the repair time and scope in the roof-proofing and floor finishing which used the three estimation method in probabilistic approach. The service life has a key role to decide the repair time and to make the plan for the repair maintenance. Results of this study are as follows ; First, the 1st repair time were taken through three methods in probabilistic and deterministic functions to eliminate the estimation bias. Second, the service life is suggested 36 years of an elementary school, 34 years of a middle school and 41 years of a high school. Third, the service life of a floor finishing is 43 years of an elementary, 39 years of a middle school and 41 years of a high school. The above study could not include the detailed information about the materials and repair works. Therefore it needs a further study to reflect the detailed information and to make a repair strategy.