• Title/Summary/Keyword: Plan evaluation

Search Result 2,540, Processing Time 0.041 seconds

Evaluation of Train Capacity Pattern Considering Customer Demands (고객수요를 고려한 열차용량패턴에 관한 연구)

  • Kim Dong-Hee;Kim Seong-Ho;Hong Sun-Heum
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.507-513
    • /
    • 2004
  • In the railway system, transportation plan corresponds to a m aster plan for transport services. This service plan must be constructed to minimize operational cost or maximize revenue considering transportation demands and resource capacities in the railway operation company, and it includes several sub-planning activities such as train operation frequency plan, train (schedule) plan, train capacity assignment plan, and rolling stock requirement plan. In these sub- planning processes, train can be con side red as a product for providing customer services, and customer demands and operational advantages must be considered. In this paper, we present an effect estimation system for the train capacity pattern in a train schedule, and the effect of capacity pattern can be expressed as minimum spilled demand, minimum train service cost, and maximum train revenue or profit.

  • PDF

A Study on the Evaluation of Long-term Development Plans for Libraries with SMART Method: Focus on a Case of the B University's Library (SMART 평가기법을 통한 도서관 장기발전계획 평가에 관한 연구 - B대학교 학술정보관의 사례를 중심으로 -)

  • Noh, Dong-Jo
    • Journal of Korean Library and Information Science Society
    • /
    • v.37 no.4
    • /
    • pp.351-370
    • /
    • 2006
  • The goal of this study was to evaluate vision, mission, strategies, and action plans from the long-term development plan for the B University's library, and specificity, measurability, achievability, relevance, and time-frame were measured and evaluated for each with SMART method. The results obtained through this study are as below : Firstly, SMART evaluation result for the B University's library was 3.80 for the vision, 3.97 for the mission, 3.74 for strategies, and 3.64 for action plans. Secondly, specificity of the long-term development plan for the B University's library was 4.06, measurability was 3.72, achievability was 3.68, relevance was 3.90, and time-frame was 3.58. Thirdly, the overall evaluation of the long-term development plan for the B University's library showed that among components from the development plan, the mission was the most superior while action plans had problems. Fourthly, in SMART evaluation factors, specificity was the most superior while time-frame had problems such that it should be supplemented in the future.

  • PDF

A Study on Practical Method of Utility Curve for Deciding Priority Order of the Improvements in Traffic Safety Audit (교통안전진단 개선방안들의 우선순위 산정 연구)

  • Choi, Ji Hye;Kang, Soon Yang;Hong, Ji Yeon;Lim, Joon Beom
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.3
    • /
    • pp.143-155
    • /
    • 2016
  • Recently, a massive loss of life and property is occurring in Korea due to traffic accidents, with the rapid increase in cars. For improvement of traffic safety, the Korea Transportation Safety Authority intensively analyzes accident data in local governments with low traffic safety index, performs a field investigation to extract problems and offers local governments improvements for problems, by conducting the 'Special Survey of Actual Conditions of Traffic Safety' each year, starting 2008. But local governments cannot strongly push forward the improvement projects due to the limited budget and the uncertainty of the improvement plan effects. Therefore, this study suggested a model which applied the Utility concept to the AHP theory, in order to efficiently decide a priority of the improvement plans in accident black spots in consideration of the limited budget of local governments. The number of accidents in each spot for improvement and accident severity, traffic volume, pedestrian volume, the improvement project cost and the accident reduction effect were chosen as evaluation factors for deciding a priority, and data about the improvement plan costs and the accident reduction effects, traffic accidents and traffic volume in the spots to undergo the special research on the real condition of traffic accident in the past were collected from the existing studies. Then, regression analysis was carried out and the Utility Curve of each evaluation factor was computed. Based on the AHP analysis findings, this study devised a priority decision method which calculated the weight and the utility function of each evaluation factor and compared the total utility values. The AHP analysis findings showed that among the evaluation factors, accident severity had the biggest importance and it was followed by the improvement plan cost, the number of accidents, the improvement effect, traffic volume and pedestrian volume. The calculated utility function shows a rise in utility, as the variables of the 5 evaluation factors; the number of accidents, accident severity, the improvement plan effect, traffic volume and pedestrian volume increase and a fall in utility, as the variables of the improvement plan cost increase, since the improvement plan cost is included in the budget spent by a local government.

Evaluating efficiency of Vertical MLC VMAT plan for naso-pharyngeal carcinoma (비인두암 Vertical MLC VMAT plan 유용성 평가)

  • Chae, Seung Hoon;Son, Sang Jun;Lee, Je Hee
    • The Journal of Korean Society for Radiation Therapy
    • /
    • v.33
    • /
    • pp.127-135
    • /
    • 2021
  • Purpose : The purpose of the study is to evaluate the efficiency of Vertical MLC VMAT plan(VMV plan) Using 273° and 350° collimator angle compare to Complemental MLC VMAT plan(CMV plan) using 20° and 340° collimator angle for nasopharyngeal carcinoma. Materials & Methods : Thirty patients treated for nasopharyngeal carcinoma with the VMAT technique were retrospectively selected. Those cases were planned by Eclipse, PO and AcurosXB Algorithm with two 6MV 360° arcs and Each arc has 273° and 350° of collimator angle. The Complemental MLC VMAT plans are based on existing treatment plans. Those plans have the same parameters of existing treatment plans but collimator angle. For dosimetric evaluation, the dose-volumetric(DV) parameters of the planning target volume (PTV) and organs at risk (OARs) were calculated for all VMAT plans. MCSv(Modulation complexity score of VMAT), MU and treatment time were also compared. In addition, Pearson's correlation analysis was performed to confirm whether there was a correlation between the difference in the MCSv and the difference in each evaluation index of the two treatment plans. Result : In the case of PTV evaluation index, the CI of PTV_67.5 was improved by 3.76% in the VMV Plan, then for OAR, the dose reduction effect of the spinal cord (-14.05%) and brain stem (-9.34%) was remarkable. In addition, the parotid glands (left parotid : -5.38%, right : -5.97%) and visual organs (left optic nerve: -4.88%, right optic nerve: -5.80%, optic chiasm : -6.12%, left lens: -6.12%, right lens: -5.26%), auditory organs (left: -11.74%, right: -12.31%) and thyroid gland (-2.02%) were also confirmed. The difference in MCSv of the two treatment plans showed a significant negative (-) correlation with the difference in CI (r=-0.55) of PTV_54 and the difference in CI (r=-0.43) of PTV_48. Spinal cord (r=0.40), brain stem (r=0.34), and both salivary glands (left: r=0.36, right: r=0.37) showed a positive (+) correlation. (For all the values, p<.05) Conclusion : Compared to the CMV plan, the VMV plan is considered to be helpful in improving the quality of the treatment plan by allowing the MLC to be modulated more efficiently

A study on evaluation element of technical proposal tendering for apartment remodeling business

  • Park, Min-Young;Lim, Sooyoung
    • KIEAE Journal
    • /
    • v.15 no.1
    • /
    • pp.61-68
    • /
    • 2015
  • Method of remodeling builder selection for remodeling is competitive bidding. also metropolitan city, megalopolis city, city more than 50million have to do basic plan for remodeling before establishment of a housing cooperative. Purpose of basic plan is improvement of living conditions & the Quality of Life for resident. Technical Proposal Tendering in spite of being the a reasonable bidding system, institutional part, appraisal standard and the item part, consider procedure pard is performed in a similar way to the existing bidding system. so, technical proposal tendering is appropriate for future Method of builder selection of remodeling. therefore, the study purpose is a evaluation element of technical proposal tendering for apartment remodeling business The methods of study is understanding concept through review of precedent literature. Next, case investigation through Analysis of focal points. Lastly, evaluation element deduction of technical proposal tendering for apartment remodeling business through specialist conversation. As a result, Alteration of a right & move management is added to evaluation element's professional field. And detail item is alteration of a right & move management.

Preformance evaluation for optimal power assignment and frequency plan of carrier groups (위성중계기 입력방송파군의 최적전력할당 및 주파수 배치에 따른 성능평가)

  • 김병균;최형진
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.21 no.12
    • /
    • pp.3183-3195
    • /
    • 1996
  • As a method for effective utilization of the limited power and frequency resources in satellite communications, this paper develops software which can assigns the optimal power of input carrier groups inthe multi-level SCPC systems and performs evaluation to a various satellite link environment. Using the developed software, the paper presents performance according to the frequency plan of carrier groups and suggest a frequency play method for performance improvement of satellite link. A various interference and noise caused by satellite link are analyzed for reliable performance evaluation. The performance criteria for evaluation is classified into 2 categories according to the CNR of destination receiver earth station.

  • PDF

A Study on Investment Evaluation of Transportation Facilities (교통시설물 투자평가에 관한 연구 -충주시를 중심으로-)

  • 김용범;김용래
    • Journal of the Korea Safety Management & Science
    • /
    • v.5 no.1
    • /
    • pp.13-31
    • /
    • 2003
  • This provided a basic frame to analyze the investment effect on the road, railroad, airport and port as a national dimension but it still has a limitation to analyze the specific economic and financial validities to consider the characteristics of the traffic facilities within the area. Conclusively, the aims of this study provide the reasonable evaluation guidelines effectively to the local automatic groups, especially Chungju in the frame of the present evaluation guidelines. We provide the adaptive alternatives on the present systems which are difficult to adapt to the present investment evaluation guidelines; the estimation method of the social economic index and the estimation method of the traffic demand. Additionally, we discuss the research method of the passage actual state for a reasonable estimation of the traffic demand. The result of this study will be activated for the validity check and construction plan of the reasonable traffic investment plan of Chungju city.

A Study of Test and Evaluation Method for Performance Improvement of Air to Ground Communication Radios (공지통신무전기 성능개량을 위한 시험평가 방안 연구)

  • Lee, Byeongheon;Ahn, Seungbeom;Choi, Myungsuk;Hur, Jang-Wok
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.25 no.3
    • /
    • pp.267-274
    • /
    • 2022
  • The Republic of Korea has a close cooperative relationship with NATO, of which the United States is a member. NATO is encouraged to follow UHF coalition waveforms for military air operations(SATURN) as defined in STANAG 4372. SATURN is a high-speed frequency hopping waveform with enhanced anti-jamming and security functions. Plans to improve the performance of existing military aircraft with air to ground radios to which SATURN function is applied. IFF case analysis and MRT evaluation plan were established to present an efficient test and evaluation plan for air to ground radios.

Efficiency Estimation of Process Plan Using Tolerance Chart

  • Kim I.H.;Dong Zuomin
    • Korean Journal of Computational Design and Engineering
    • /
    • v.11 no.2
    • /
    • pp.148-155
    • /
    • 2006
  • This paper presents a new method for assessing the efficiency of production process plans using tolerance chart to lower production cost. The tolerance chart is used to predict the accuracy of a part that is to be produced following the process plan, and to carry out the quantitative measurement on the efficiency of the process plan. By comparing the values of design tolerances and their corresponding resultant tolerances calculated using the tolerance chart, the process plan that is incapable of satisfying the design requirements and the faulty production operations can be identified. Similarly, the process plan that imposes unnecessarily high accuracy and wasteful production operations can also be identified. For the latter, a quantitative measure on the efficiency of the process plan is introduced. The higher the unnecessary cost of the production, the poor is the efficiency of the process plan. A coefficient is introduced for measuring the process plan efficiency. The coefficient also incorporates two weighting factors to reflect the difficulty of manufacturing operations and number of dimensional tolerances involved. To facilitate the identification of the machining operations and the machined surfaces, which are related to the unnecessarily tight resultant tolerances caused by the process plan, a rooted tree representation of the tolerance chart is introduced, and its use is demonstrated. An example is presented to illustrate the new method. This research introduces a new quantitative process plan evaluation method that may lead to the optimization of process plans.

A Study for Architectural Planning Direction to the Future School Facilities (미래 학교시설의 건축계획방향에 관한 연구)

  • Kim, Jae-Young;Lee, Jong-Kuk
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.16 no.3
    • /
    • pp.1-8
    • /
    • 2017
  • The study is a precursor to the final goal of organizing a future school building plan to prepare for the new paradigm. Planning direction presentation through planning elements and principles is key purpose. Based on the results of the study, it is meaningful that the school facilities will be able to fulfil the educational role of the school facilities, including science, technology, and environment. Based on the theoretical concepts of prospective school facilities and research data, the school plans to construct architectural plan elements and construct the architectural plan based on the guidelines of the school plan based on the evaluation criteria of the school building and the evaluation criteria based on the evaluation criteria of the school building and the calculation of the plan through the procurement criteria of the school and the Future Schools.