• Title/Summary/Keyword: Piping system

Search Result 776, Processing Time 0.022 seconds

Parametric Design on Bellows of Piping System Using Fuzzy Knowledge Processing

  • Lee Yang-Chang;Lee Joon-Seong;Choi Yoon-Jong
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • v.6 no.2
    • /
    • pp.144-149
    • /
    • 2006
  • This paper describes a novel automated analysis system for bellows of piping system. An automatic finite element (FE) mesh generation technique, which is based on the fuzzy theory and computational geometry technique, is incorporated into the system, together with one of commercial FE analysis codes and one of commercial solid modelers. In this system, a geometric model, i.e. an analysis model, is first defined using a commercial solid modelers for 3-D shell structures. Node is generated if its distance from existing node points is similar to the node spacing function at the point. The node spacing function is well controlled by the fuzzy knowledge processing. The Delaunay triangulation technique is introduced as a basic tool for element generation. The triangular elements are converted to quadrilateral elements. Practical performances of the present system are demonstrated through several analysis for bellows of piping system.

Parametric Study on Bellows of Piping System Using Fuzzy Theory

  • Lee Yang-Chang;Lee Joon-Seong
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • v.6 no.1
    • /
    • pp.58-63
    • /
    • 2006
  • This paper describes a novel automated analysis system for bellows of piping system. An automatic finite element (FE) mesh generation technique, which is based on the fuzzy theory and computational geometry technique, is incorporated into the system, together with one of commercial FE analysis codes and one of commercial solid modelers. In this system, a geometric model, i.e. an analysis model, is first defined using a commercial solid modelers for 3-D shell structures. Node is generated if its distance from existing node points is similar to the node spacing function at the point. The node spacing function is well controlled by the fuzzy knowledge processing. The Delaunay triangulation technique is introduced as a basic tool for element generation. The triangular elements are converted to quadrilateral elements. Practical performances of the present system are demonstrated through several analysis for bellows of piping system.

An Experimental Examination on Autonomous Recovery Algorithm of Piping System (배관체계 자율형 사고 대응 알고리즘에 대한 실험적 고찰)

  • Dae Won Yang;Byungchang Jung;Seong Rok Kim;Chaemin Lee;Yun-Ho Shin
    • Journal of the Korean Society of Safety
    • /
    • v.38 no.2
    • /
    • pp.8-14
    • /
    • 2023
  • In various industrial sites, piping systems play an essential role in stable fluid supply and pressure maintenance. However, these systems are constantly exposed to risks of earthquakes, explosions, fires, and leaks, which can result in casualties or serious economic losses. With rapid advancements in the industry, different-sized piping systems have been launched; however, there are not enough maintenance personnel for troubleshooting and responding to situations where damages occur to piping systems. This increases the need for introducing autonomous damage management systems. In this study, a lab-based piping system was designed and manufactured by referring to the piping system of a naval ship to analyze the effectiveness of autonomous damage management systems. By using this testbed, a representative algorithm, the hydraulic resistance control algorithm, was realized and examinedIn addition, the difference between the averaged pressure and normalized pressure was introduced to improve the performance of the existing algorithm, which faces some limitations with regard to sensor noise and back pressure from the rupture-simulated pipeline part.

A Study on System Stress Analysis of High Temperature Plant Piping with Expansion Joints and Load Hangers (신축이음과 하중행거가 함께 설치된 고온플랜트 배관계의 시스템응력 해석 연구)

  • Park, Do Jun;Yu, Jong Min;Han, Seung Yeon;Yoon, Kee Bong;Kim, Ji Yoon
    • Journal of Energy Engineering
    • /
    • v.23 no.3
    • /
    • pp.116-124
    • /
    • 2014
  • In the plants operated under high temperature condition, piping system load analysis is often performed to prevent accidents caused by thermal deformation and also to locate inspection prioritity points of the piping system. In this study, piping system stress analysis was performed for a pipe system between the reactors in a process plant. The piping system includes typically installed hangers and expansion joints. In order to evaluate the effects of structural components such as hangers and expansion joints, the case for the expansion joint or the hanger under abnormal operation is considered. By comparison anlaysis results of piping system during normal operation and abnormal operation, the role of each pipe components are studied.

A Study on the Steam Hammering Characteristics by Sudden Closure of Main Stop Valve in the Main Steam Piping System of a Power Plant (화력발전소 주증기배관에서 밸브 차단에 따른 수증기 충격 특성에 관한 연구)

  • Ha, Ji-Soo;Lee, Boo-Youn
    • Journal of the Korean Institute of Gas
    • /
    • v.17 no.2
    • /
    • pp.70-77
    • /
    • 2013
  • The present study has been carried out to analyze the effect of steam hammering on the steam piping system including the final superheater, the high pressure turbine, check valve and the first reheater by sudden stoping of main stop valve in a power plant. For the present steam hammering analysis, the well known Flowmaster software has been used to model the steam piping system and the time dependent characteristics of pressure and steam mass flow rate has been conducted. Using the result of the unsteady pressure and steam mass flow rate, the forces acting on the elbows in the piping system has been derived. From the present analysis, it has been elucidated that the elbow just before the main stop valve and the elbow near the connection pipe between bypass pipe and check valve had the largest force among the elbows in the steam piping system. The structural safety diagnostics study on the elbow and the supporting structures of the steam piping system of a power plant will be conducted in the future by the present results of the forces acting on the elbow.

The Proposal of a New Drainage System without Incline of Piping and Experiment on Drainage Flow Characteristics (구배가 없는 신배수시스템의 제안 및 배수유동 특성에 관한 실험적 연구)

  • Cha Young-Ho;Yee Jurng-Jae
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.17 no.5
    • /
    • pp.452-458
    • /
    • 2005
  • In Korea, pumping pipe using gravity way by water is most popular method in drainage system. But, it is difficult to repair a drainpipe in this method because the drain pipe diameter is increased as using this method. In this research, we propose a new drainage system. The system aim for an adaptedness with buildings, freedom of plan, construction and renewal in water pipe equipments, etc. The new system is not need of incline of piping, and it uses drainage power that is changed potential energy by high velocity flow as making Siphonage at vertical pipe. Therefore, the diameter of piping can decreased than existing piping system established in the ceiling. Also because connecting position will be located at the lower part, it is changed the potential energy of drainage to the high velocity flow. In addition, drainage will be smooth because the fixture drain is linked by each drain pipes.

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner

  • PDF

Thermal stress analysis for high pressure and temperature pipelines in ultra steam turbine (UST) system

  • Choi, Dae-keon
    • Bulletin of the Society of Naval Architects of Korea
    • /
    • v.52 no.2
    • /
    • pp.19-24
    • /
    • 2015
  • A reliable assessment and analysis of the condition of high pressure and temperature steam pipelines requires defining stress state, which will take into consideration not just the impact of internal pressure and temperature but all applied loads. For that, usage of modeling and numerical methods for calculation and analysis of stress state is essential. The main aim of piping stress analysis is to check the design of piping layout, which will allow simple, efficient and economical piping supports and provide flexibility to the piping system for loads and stresses. The piping stress analysis is carried out using CAESER II software. By using this software we can evaluate stresses, stress ratios, flange condition, support loads, element forces and displacements at each node and points. In this paper, only the maximum and minimum displacement results are tabulated, which is also shown in detail by an example of main steam pipelines of UST Main Engine System [1].

Defect Detection of Carbon Steel Pipe Weld Area using Infrared Thermography Camera (적외선 열화상 카메라를 이용한 탄소강관 용접부 결함검출)

  • Kwon, DaeJu;Jung, NaRa;Kim, JaeYeol
    • Tribology and Lubricants
    • /
    • v.30 no.2
    • /
    • pp.124-129
    • /
    • 2014
  • The piping system accounts for a large portion of the machinery structure of a plant, and is considered as a very important mechanical structure for plant safety. Accordingly, it is used in most energy plants in the nuclear, gas, and heavy chemical industries. In particular, the piping system for a nuclear plant is generally complicated and uses the reactor and its cooling system. The piping equipment is exposed to diverse loads such as weight, temperature, pressure, and seismic load from pipes and fluids, and is used to transfer steam, oil, and gas. In ultrasound infrared thermography, which is an active thermography technology, a 15-100 kHz ultrasound wave is applied to the subject, and the resulting heat from the defective parts is measured using a thermography camera. Because this technique can inspect a large area simultaneously and detect defects such as cracks and delamination in real time, it is used to detect defects in the new and renewable energy, car, and aerospace industries, and recently, in piping defect detection. In this study, ultrasound infrared thermography is used to detect information for the diagnosis of nuclear equipment and structures. Test specimens are prepared with piping materials for nuclear plants, and the optimally designed ultrasound horn and ultrasound vibration system is used to determine damages on nuclear plant piping and detect defects. Additionally, the detected images are used to improve the reliability of the surface and internal defect detection for nuclear piping materials, and their field applicability and reliability is verified.

Piping Failure Frequency Analysis for the Main Feedwater System in Domestic Nuclear Power Plants

  • Choi Sun Yeong;Choi Young Hwan
    • Nuclear Engineering and Technology
    • /
    • v.36 no.1
    • /
    • pp.112-120
    • /
    • 2004
  • The purpose of this paper is to analyze the piping failure frequency for the main feedwater system in domestic nuclear power plants(NPPs) for the application to an in-service inspection(ISI), leak before break(LBB) concept, aging management program(AMP), and probabilistic safety analysis(PSA). First, a database was developed for piping failure events in domestic NPPs, and 23 domestic piping failure events were collected. Among the 23 events, 12 locations of wall thinning due to flow accelerated corrosion(FAC) were identified in the main feedwater system in 4 domestic WH 3-loop NPPs. Two types of the piping failure frequency such as the damage frequency and rupture frequency were considered in this study. The damage frequency was calculated from both the plant population data and damage(s) including crack, wall thinning, leak, and/or rupture, while the rupture frequency was estimated by using both the well-known Jeffreys method and a new method considering the degradation due to FAC. The results showed that the damage frequencies based on the number of the base metal piping susceptible to FAC ranged from $1.26{\times}10^{-3}/cr.yr\;to\;3.91{\times}10^{-3}/cr.yr$ for the main feedwater system of domestic WH 3-loop NPPs. The rupture frequencies obtained from the Jeffreys method for the main feedwater system were $1.01{\times}10^{-2}/cr.yr\;and\;4.54{\times}10^{-3}/cr.yr$ for the domestic WH 3-loop NPPs and all the other domestic PWR NPPs respectively, while those from the new method considering the degradation were higher than those from the Jeffreys method by about an order of one.