• Title/Summary/Keyword: Piping design system

Search Result 265, Processing Time 0.025 seconds

Pipe Atuo-Routing with Design Knowledge-base (선박용 배관의 Auto-Routing을 위한 설계 전문가 시스템)

  • 강상섭;명세현;한순흥
    • Korean Journal of Computational Design and Engineering
    • /
    • v.2 no.1
    • /
    • pp.1-10
    • /
    • 1997
  • Finding the optimum route of ship's pipes is complicated and time-consuming process. Experience of designers is the main tool in this process. To reduce design man-hours and human errors a design expert system shell and a geometric modeler is used to automate the design process. In this paper, a framework of the intelligent CAD system for pipe auto-routing is suggested, which consists of general-purpose expert system shell and a geometric modeler. The design expert system and the geometric modeling kernel have been integrated. The CADDS5 of Computervision is used as the overall CAD environment. The Nexpert Object of Neuron Data is used as the expert system shell. The CADDS5 ISSM is used as the interface that creates and modifies geometric models of pipes. Existing algorithms for the routing problem have been analyzed. Most of them are to solve the 2-D circuit routing problems. Ship piping system, specially within the engine room, is a complicated, large scale 3-D routing problem. Methods of expert system have been used to find the route of ship pipes on the main deck.

  • PDF

A Safety Improvement for the Design Change of Westinghouse 2 Loop Auxiliary Feedwater System (웨스팅하우스형 원전의 보조급수계통 설계변경 영향 평가)

  • Na, Jang Hwan;Bae, Yeon Kyoung;Lee, Eun Chan
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.9 no.1
    • /
    • pp.15-19
    • /
    • 2013
  • The auxiliary feedwater is an important to remove the heat from the reactor core when the main feedwater system is unavailable. In most initiating events in Probabilistic Safety Assessment(PSA), the operaton of this system is required to mitigate the accidents. For one of domestic nuclear power plants, a design change of a turbine-driven auxiliary feedwater pump(TD-AFWP), pipe, and valves in the auxiliary system is implemented due to the aging related deterioration by long time operation. This change includes the replacement of the TD-AFWP, the relocation of some valves for improving the system availability, a new cross-tie line, and the installation of manual valves for maintenance. The design modification affects the PSA because the system is critical to mitigate the accidents. In this paper, the safety effect of the change of the auxiliary feedwater system is assessed with regard to the PSA view point. The results demonstrate that this change can supply the auxiliary feedwater from the TD-AFWP in the accident with the motor-driven auxiliary feedwater pump(MD-AFWP) unavailable due to test or maintenance. In addition, the change of MOV's normal position from "close" to "open" can deliver the water to steam generator in the loss of offsite power(LOOP) event. Therefore, it is confirmed that the design change of the auxiliary feedwater system reduces the total core damage frequency(CDF).

Study on Selection of Nuclear Seismic Fragile Equipment and Its Enhancement of Seismic Performance (주요기기 내진성능 상향을 위한 설비보강 및 취약부 도출연구)

  • Son, Jung-Dae;Koo, Gyeong-Hoi
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.14 no.2
    • /
    • pp.16-23
    • /
    • 2018
  • In order to investigate the ways to enhance the seismic performance of APR1400 seismic fragile equipment by direct design changes, four equipment such as Reactor Vessel Support, Integrated Head Assembly, Remote Shutdown Console, and Pressurizer are reviewed using information of the main dimensions, seismic stress evaluation results, design FRS, etc. in this paper. In addition to the direct reinforcement of equipments, the feasibility of seismic isolation for the safety related cabinet is also investigated and the actual adaption plan of a commercial spring-damper system is briefly reviewed.

Development of the Low Pressure Piping System for the Liquid Rocket LOX Feed System (액체로켓 LOX 공급계의 저압 배관시스템 개발)

  • Jun, Sang-In;Jung, Jin-Taeg;Kim, Woo-Kyum;Park, Joon-Seong;Kwon, Oh-Sung;Kim, Young-Mog
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2007.04a
    • /
    • pp.322-325
    • /
    • 2007
  • This paper shows the development procedure of the low pressure LOX feed system which is used in the liquid rocket with a turbopump. Korean Air has cooperated with KARI in developing the LOX feed system to turbopump. The LOX feed system is characterized with cryogenic temperature and the thin-thickness tube for weight saving. The system in this project is composed with a main feed line and a recirculation line for the LOX temperature conditioning. Each piping system has many components, namely, bellows, filter, orifice, valves, flange and support. In this paper, system design & manufacturing, structural & thermal analyses, and component tests are explained. Finally, the system was assembled to the KARI's PTF test facility and functioned well to meet its required performance.

  • PDF

Seismic Performance and Damage Prediction of Existing Fire-protection Pipe Systems Installed in RC Frame Structures (철근콘크리트 구조물 내 부착된 수계 관망시스템의 내진거동 및 손상예측)

  • Jung, Woo-Young;Ju, Bu-Seog
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.15 no.3
    • /
    • pp.37-43
    • /
    • 2011
  • Reliability of piping systems is essential to the safety of any important industrial facilities. During an earthquake, damage to the piping system can occur. It can also cause considerable economic losses and the loss of life following earthquakes. Traditionally, the study of the secondary system was less important than primary structure system, however it has recently been emerging as a key issue for the effective maintenance of the structural system and to help reduce nonstructural earthquake damage. The primary objectives of this study are to evaluate seismic design requirements and the seismic performance of gas and fire protection piping systems installed in reinforced concrete (RC) buildings. In order to characterize the seismic behavior of the existing piping system in an official building, 10 simulated earthquakes and 9 recorded real earthquakes were applied to ground level and the building system by the newmark average acceleration time history method. The results developed by this research can be used for the improvement of new seismic code/regulatory guidelines of secondary systems as well as the improvement of seismic retrofitting or the strengthening of the current piping system.

Structural design concept of the forced-draft sodium-to-air heat exchanger in the decay heat removal system of PGSFR (소듐냉각고속로 잔열제거계통 강제대류 소듐-공기 열교환기의 구조개념 설계)

  • Kim, Nak Hyun;Lee, Sa Yong;Kim, Sung Kyun
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.12 no.1
    • /
    • pp.78-84
    • /
    • 2016
  • The FHX (Forced-draft sodium-to-air Heat Exchanger) employed in the ADHRS (active decay heat removal system) is a shell-and-tube type counter-current flow heat exchanger with M-shape finned-tube arrangement. Liquid sodium flows inside the heat transfer tubes and atmospheric air flows over the finned tubes. The unit is placed in the upper region of the reactor building and has function of dumping the system heat load into the final heat sink, i.e., the atmosphere. Heat is transmitted from the primary cold sodium pool into the ADHRS sodium loop via DHX (decay heat exchanger), and a direct heat exchange occurs between the tube-side sodium and the shell-side air through the FHX tube wall. This paper describes the DHRS and the structural design of the FHX.

Effect on Vibration of Start-up Condition and Retrofit of Steam Turbines (증기터빈의 기동조건과 성능개선이 터빈의 진동에 미치는 영향)

  • Lee, Hyuk Soon;Chung, Hyuk Jin;Song, Woo Sok
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.7 no.3
    • /
    • pp.1-7
    • /
    • 2011
  • The analysis shows that the vibration is one of the main reasons of turbine failure. Especially, the problems caused by vibration occur right after retrofit of the turbine-generator and restarting the turbine. Through the case study of high vibration caused by after the turbine trip and restart, turbine vibration was identified to be influenced by startup condition. Turbine startup at high casing temperature right after unscheduled turbine trip cause radial expansion in rotor by contraction in axial direction, while casing continues to contract by steam flowing into casing. Consequently, gap between rotor and casing decrease until to metal contact to cause high vibration. Through the case study of high vibration of turbine-generator system after generator retrofit, it was identified that generator replacement could cause high vibration in turbine-generator system if the influence of generator replacement on entire system was not considered properly. To prevent startup delay caused by high vibration, it is important to keep the gaps at the design standard and start the turbine after thermal equilibrium.

A Study on the Leading/Unloading Time Prediction of the Ballast Tank (밸러스트 탱크의 급수/배수 시간 예측에 관한 연구)

  • Kim H. I.;Kim M. U.;Choi D. H.
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2004.10a
    • /
    • pp.33-36
    • /
    • 2004
  • The ballast tank of a ship is a system that realizes the required shipping condition and controls the draft of a ship. The loading/unloading of the ballast tank is frequently operated during navigation and the accurate prediction of the loading/unloading time is very important. A numerical algorithm that predicts the loading/unloading time of the ballast tank has been developed and applied to the prediction of the loading/unloading time of the ballast tank with various piping systems. This algorithm can be useful in optimizing the ballast tank system in early design stage.

  • PDF

Vacuum system design of a 10 ton/day class air liquefaction cold box for liquid air energy storage

  • Sehwan, In;Juwon, Kim;Junyoung, Park;Seong-Je, Park;Jiho, Park;Junseok, Ko;Hankil, Yeom;Hyobong, Kim;Sangyoon, Chu;Jongwoo, Kim;Yong-Ju, Hong
    • Progress in Superconductivity and Cryogenics
    • /
    • v.24 no.4
    • /
    • pp.65-70
    • /
    • 2022
  • A vacuum system is designed for thermal insulation of a 10 ton/day class air liquefaction cold box for liquid air energy storage. The vacuum system is composed of a turbomolecular pump, a backing pump and vacuum piping for the vacuum pumps. The turbomolecular pump is in combination with the backing pump for pumping capacity. The vacuum piping is designed with system installation conditions, such as distance from the cold box, connections to vacuum pumps and installation space. The capacity of the vacuum pump combination, namely pumping speed, is determined by analysis of the vacuum system, and pump-down time to 1×10-5 mbar is estimated. Vacuum piping conductance, system pumping speed and outgassing rate are calculated for the pump-down time with the ultimate pumping speed range of the vacuum pump combination of 1400 - 2300 l/s. Although the pump-down time gets shorter by larger capacity vacuum pumps, it mainly depends on target vacuum degree and outgassing rate in the cold box. The pump-down time is estimated as 3 - 6 hours appropriate for cold box operation for the pumping speed range. Considering the outgassing rate has uncertainty, the vacuum pump combination with pumping speed of 1900 l/s is chosen for the vacuum system, which is middle value of the pumping speed range.

Stress Distribution in the Dissimilar Metal Butt Weld of Nuclear Reactor Piping due to the Simulation Technique for the Repair Welding (보수용접 모사 방법에 따른 원자로 배관 이종금속 맞대기 용접부 응력 분포)

  • Lee, Hwee-Seung;Huh, Nam-Su;Kim, Jin-Su;Lee, Jin-Ho
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.37 no.5
    • /
    • pp.649-655
    • /
    • 2013
  • During welding, the dissimilar metal butt welds of nuclear piping are typically subjected to repair welding in order to eliminate defects that are found during post-weld inspection. It has been found that the repair weld can significantly increase the tensile residual stress in the weldment, and therefore, accurate estimation of the weld residual stress due to repair weld, especially for dissimilar metal welds using Ni-based alloy 82/182 in nuclear components, is of great importance in order to assess susceptibility to primary water stress corrosion cracking. In the present study, the stress distributions of dissimilar metal butt welds in nuclear reactor piping subjected to repair weld were investigated based on detailed nonlinear finite element analyses. Particular emphasis was placed on the variation of the stress distribution in the dissimilar metal butt weld according to the finite element welding analysis sequence for the repair welding process.