• Title/Summary/Keyword: Pipeline leakage

Search Result 131, Processing Time 0.02 seconds

Analysis and Depth Estimation of Complex Defects on the Underground Gas Pipelines

  • Kim, Jong-Hwa;Kim, Min-Ho;Choi, Doo-Hyun
    • Journal of Magnetics
    • /
    • v.18 no.2
    • /
    • pp.202-206
    • /
    • 2013
  • In this paper, the MFL (magnetic flux leakage) signals of complex defects on the underground gas pipeline are analyzed and their depths are estimated. Since closely-located defects (complex defects) affect each other, accelerate the progress of defection, and are finally combined to one (cluster), it's meaningful to differentiate complex defects from single defects by analyzing their characteristics. Various types of complex defects are characterized and analyzed by defining the safety distance for interference. 26 artificial defects are carved on the pipeline simulation facility (PSF) to analyze the characteristics of complex defect and demonstrate the accuracy of the proposed complex defect estimation. The proposed method shows average length error of 5.8 mm, average width error of 15.55 mm, and average depth error of 8.59%, respectively.

Effects of the PIG Draft Velocity on the Defect Signals in MFL NDT System (자기 누설 비파괴 탐상 시스템에서 PIG의 주행속도가 검출신호에 미치는 영향)

  • 박상호;박관수
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.52 no.10
    • /
    • pp.475-483
    • /
    • 2003
  • In this paper, dynamic characteristics of the magnetic flux leakage(MFL) type non-destructive testing(NDT) are analyzed. Effects of a sensor speed in MFL PIG system and remanent magnetization of the gas pipeline are analyzed by using 3 dimensional nonlinear finite element analysis including eddy current and hysteresis characteristics. Results show that the speed of the sensor reduces the magnitude of the sensing signals where as the hysteresis of the pipeline distorts the sensing signals.

Groundwater Recharge and Discharge in the Urban-rural Composite Area (도농복합지역 지하수 함양과 배출에 대한 연구)

  • Lee, Byung-Sun;Hong, Sung-Woo;Kang, Hee-Jun;Lee, Ji-Seong;Yun, Seong-Taek;Nam, Kyoung-Phile
    • Journal of Soil and Groundwater Environment
    • /
    • v.17 no.2
    • /
    • pp.37-46
    • /
    • 2012
  • This study was conducted to identify groundwater recharge and discharge amounts of a representative urban-rural composite area located in Yongin city, Kyounggi-do, Korea. Groundwater recharge would be affected by mainly two processes in the study area: rainfall and leakage from public water pipelines including water-supply and sewage system. Groundwater recharge rate was estimated to be 13.5% by applying annual groundwater level data from two National Groundwater Monitoring Stations to the master regression curve method. Subsequently, the recharge amounts were determined to be $13,253{\times}10^3m^3/yr$. Leakage amounts from water-supply and sewage system were estimated to be $3,218{\times}10^3$ and $5,696{\times}10^3m^3/yr$, respectively. On the whole, a total of the recharge amounts was $22,167{\times}10^3m^3/yr$, of which 60% covers rainfall recharge and 40% pipeline leakage. Groundwater discharge occurred through three processes in the composite area: baseflow, well pumping, and discharge from urban infrastructure including groundwater infiltration into sewage pipeline and artificial extraction of groundwater to protect underground facilities from submergence. Discharge amounts by baseflow flowing to the Kiheung agricultural reservoir and well pumping were estimated to be $382{\times}10^3$ and $1,323{\times}10^3m^3/yr$, respectively. Occurrence of groundwater infiltration into sewage pipeline was rarely identified. Groundwater extraction amounts from the Bundang subway line as an underground facility were identified as $714{\times}10^3m^3/yr$. Overall, a total of the discharge amounts was determined to be $2,419{\times}10^3m^3/yr$, which was contributed by 29% of artificial discharge. Even though groundwater budget of the composite area was identified to be a surplus, it should be managed for a sound groundwater environment by changing deteriorated pipelines and controlling artificial discharge amounts.

Defect Estimation of a Crack in Underground Pipelines by CMFL Type NDT System

  • Kim, Hui Min;Park, Gwan Soo
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.6
    • /
    • pp.2218-2223
    • /
    • 2014
  • A crack which is axially oriented with small size is hard to detect in conventional system. CMFL(Circumferential Magnetic Flux Leakage) type PIG(Pipelines Inspection Gauge) in the NDT(Nondestructive Testing), is operated to detect this defect called axially oriented cracks in the pipe. It is necessary to decompose the size and shapes of cracks for the maintenance of underground pipelines. This article is mainly focused on the decomposing method of the size and shape of the axially oriented cracks by using inspection signal data for defect.

A Magnetic Flux Leakage Analysis of Metal Object for Underground Gas Pipeline (누설자속을 이용한 지하가스관 외부 금속물체의 자기신호 해석)

  • Kim, Chul;Ha, Jung-Woo;Kim, Han-Deul;Shin, Pan-Seok;Park, Gwan-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2005.04a
    • /
    • pp.111-113
    • /
    • 2005
  • 지하에 매설된 가스관의 경우 MFL(Magnetic Fluk Leakage, 자기누설탐상) PIG를 이용하여 금속관의 여러 가지 기계적인 손상을 감지하여 사고예방이나 유지관리의 정보로 활용하고 있다. 이러한 비파피검사는 당장 수리가 필요한 손상에서부터 장래에 위협이 될 수도 있는 지하 매설관 외부의 금속물체(Metal object)까지 찾아낼 수 있어야 한다. 이 논문은 지하 매설관 외부의 금속물체의 크기, 모양 및 이격거리 등에 따른 자기누설 신호를 유한요소법을 이용하여 simulation 하고, MFL PIG를 이용하여 지하 매설관에 대한 비파괴검사를 할 경우 나타나는 여러 가지 자기적 신호를 보정하여 metal object의 크기나 위치 등을 판별할 수 있도록 기본적인 자기누설 정보를 제공하기 위한 연구이다. NMFL PIG의 형상과 금속물체의 크기 종류 의 정확한 분석을 위하여 3차원 해석을 하였다.

  • PDF

Calculation of the target revenue water ratio of local waterworks considering economic feasibility (경제성을 고려한 지방상수도 목표 유수율 산정)

  • Donghong Kim;Jaebum Lee;Jungkwan Song;Taeho Choi
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.37 no.6
    • /
    • pp.311-324
    • /
    • 2023
  • As an advanced study on the method of calculating the target revenue water ratio of local waterworks through the leakage component analysis method proposed by Kim et al. (2022), this study developed a model to calculate the achievable revenue water ratio within the specified project cost, the required project cost to achieve the specified target revenue water ratio, and the economically appropriate target revenue water ratio level by considering the leakage reduction cost and leakage reduction benefit for each revenue water ratio improvement strategy, and conducted an applicability evaluation of the developed model using actual field data. The procedure for calculating the target revenue water ratio of local waterworks considering economics proposed in this study consists of three stages: physical data linkage model construction, leakage component analysis, and economic analysis, and the applicability was evaluated for Zone H with branch type and the Zone M network type. As a result of the application, it was calculated that approximately 32.5 billion won would be required to achieve the target revenue water ratio of 70% in the Zone H, and approximately KRW 10.5 billion would be required to achieve the target revenue water ratio of 75% in the Zone M. If the business scale of Zones H and M was corrected to 10,000 m3/day of water usage, the required project cost for a 1% improvement in the revenue water ratio of Zone H was calculated to be 0.7642 billion won and 0.4715 billion won for Zone M.

Leak and Leak Point Prediction by Detecting Negative Pressure Wave in High Pressure Piping System (저압확장파 검출을 통한 배관 누출 및 누출위치 예측)

  • Ha, Tae-Woong;Ha, Jong-Man;Kim, Dong-Hyuk;Kim, Young-Nam
    • Journal of the Korean Institute of Gas
    • /
    • v.11 no.4
    • /
    • pp.47-53
    • /
    • 2007
  • The safe operation of high pressure pipe line systems is of significant importance. Leaks due to faulty operation from the pipelines can lead to considerable product losses and to exposure of community to dangerous gases. There are several leak detection methods, which have been recently suggested on pipeline network. The negative pressure wave detection technology, which has advantages of short time detection availability, accurate leaking location estimate capability and cost effective, is concentrated in this study. Theoretical analysis of the flow characteristics for leaking through a hole on the pipe wall has been performed by using CFD++, commercial CFD package. The results of 3-dimensional analysis near leaking hole confirm the occurrence of negative pressure wave and verify the characteristics of propagation of the wave which travels with speed equal to the speed of sound in the pipeline contents. For the application of long pipe line system. The method of 1-dimensional analysis has been suggested and verified with results of CFD++.

  • PDF

Effects of the Multi-Defects on Detecting Signals in Magnetic Flux Leakage System (자기누설탐상시스템에서 밀집된 다수의 결함이 탐상 신호에 미치는 영향)

  • Seo, Kang;Jeong, Hyun-Won;Park, Gwan-Soo;Lee, Min-Ho;Choi, Doo-Hyun;Lee, Seung-Hyun;Um, Chang-Gun;Shin, Pan-Seok;Kim, Chul;Rho, Yong-Woo;Yoo, Hui-Ryong;Cho, Sung-Ho;Kim, Dong-Kyu
    • Proceedings of the KIEE Conference
    • /
    • 2005.10c
    • /
    • pp.70-73
    • /
    • 2005
  • 자기누설탐상시스템은 지하에 매설된 가스관에서 발생되는 부식이나 크랙 또는 기계적 변형을 탐지하기 위한 방법으로 비파괴검사 방법의 하나이다. 가스관은 Nd자석에 의해 착자가 되고, 가스관에 부식이 발생했을 경우 가스관의 단면적이 작아지게 되어 자기누설이 발생하며, 발생된 자기누설을 홀센서로 검출하여 부식의 유무, 크기, 모양 등을 판별하게 된다. 가스관에는 한 개의 독립적인 부식도 있지만, 다수의 부식이 밀집되어 나타나기도 한다. 다수의 부식이 밀집되었을 경우 부식간의 거리에 따라 하나의 부식으로 판정되기도 하며, 그에 따라 부식의 깊이를 판정하는데 있어 정확성이 저감된다. 따라서 본 논문에서는 다수의 부식이 밀집되어 발생할 경우 자기적 영향을 분석하고, 깊이 판정에 있어 정확성을 높이기 위한 연구를 수행하였다. 이를 위해서 실제 결함을 제작하여 실험하고, 해석하여 비교하였으며 밀집된 다수의 부식에 의한 자기적 영향에 대하여 고찰하였다.

  • PDF

Effects of Residual Magnetization on MEL Non-destructive Inspection of Gas Pipeline (가스관의 자속누설탐사에서 잔류자화의 영향에 관한 연구)

  • Jang, Pyung-Woo
    • Journal of the Korean Magnetics Society
    • /
    • v.14 no.4
    • /
    • pp.143-148
    • /
    • 2004
  • Effects of residual flux density M$_{res}$ and number of inspection on the detection voltage and flux density B of the gas pipeline were investigated in MFL inspection, which is widely used for the non-destructive inspection in a gas pipeline. A simulation equipment composed of the magnetizer and iron ring attached on an aluminum disc was constructed instead of a huge gas pipeline facility. With this system. the iron ring could be perfectly demagnetized and signals from the bolt screw stuck on the disc could be clearly detected so that the effects of M$_{res}$S and the inspection number on the detection voltage and B of iron ring were effectively investigated. With increasing the number of inspection, M$_{res}$, B of the iron ring and the detection voltage decreased and then kept at constant values while final M$_{res}$ increased with increasing initial M$_{res}$. If inspection condition were kept unchanged, the detection voltage was proportional to the last M$_{res}$ of the iron ring instead of B. This was probably due to magnetic hysteresis of the iron ring inherited from magnetic domain so that consideration on the magnetic hysteresis was inevitable in the analysis of MFL signal from defects of a gas pipeline. A new inspection scheme using the magnetizer with reversed magnetization in the subsequent inspection was proposed from the result that a high detection voltage could be obtained in the first inspection of gas pipeline with positive M$_{res}$.

Implementation of High Magnetization System for Performance Enhancement of Magnetic Flux Leakage Tool

  • Cho, Sung-Ho;Yoo, Hui-Ryong;Kim, Dong-Ku;Park, Dae-Jin;Rho, Yong-Woo;Seo, Kang;Park, Gwan-Soo;Choi, Doo-Hyun;Song, Sung-Jin
    • Journal of Magnetics
    • /
    • v.15 no.4
    • /
    • pp.199-203
    • /
    • 2010
  • This paper discusses the effectiveness of high magnetization saturation in ILI (In-Line Inspection) using an MFL (Magnetic Flux Leakage) tool, and introduces a practical method for improving the magnetization level together with the piggability. Thin steel plates, replacing the conventional wire brushes were used as conductors to transfer the magnetic flux to the pipe wall. The newly designed MFL tool was compared with the conventional version by means of FEM (Finite Element Method) analysis and full-scale experiments. In the results, the newly developed magnetization system obtained a stronger MFL signal amplitude, specially 2.7 times stronger, than that obtained by the conventional magnetization system for the same defect dimensions.