• Title/Summary/Keyword: Pipe Failure Test

Search Result 106, Processing Time 0.026 seconds

Proposal of Concrete Pull Off Bond Strength Measurement Method for Bridge Deck Overlay (교면 덧씌우기 콘크리트의 인발부착강도(引拔附着强度) 시험법(試驗法) 제안(提案))

  • Kim, Seong-Hwan;Kim, Dong-Ho;Kim, Hyun-Oh;Lee, Bong-Hak
    • Journal of Industrial Technology
    • /
    • v.23 no.A
    • /
    • pp.149-156
    • /
    • 2003
  • The development and maintenance of a sound bond are essential requirements of concrete repair and replacement. The bond property of a overlay to its substrate concrete during the lifetime is one of the most important performance requirements which should be quantified. A standard or a verified bond strength measurement method is required at field for screening, selecting materials and quality control for overlay or repair materials, but no test method has been adopted as a standard. In this study, a concrete pull off bond strength measurement method for field application is proposed and evaluated. This study compares the splitting tensile test, slant shear test, nipple pipe direct tensile test, flexural adhesion test, briquette tensile test, jumbo nail pull-out test and core pull-off test with their test procedures. From these comparison and investigation, core pull-off test is selected as a main topic of this study because of it's suitability for in situ testing, simplicities in field application and clearness at interface boundary condition. Thus, the proposed core pull off test is evaluated to be the most appropriate method for field application in a simple manner. The fracture surface and fracture mode could be easily determined by visual observation of failure surface of the field specimen. The core pull off test was found to be sensitive to surface condition and latex contents at latex modified concrete.

  • PDF

Investigation on Rock Slope Failure in Odong 2 area, Boeun-Gun (보은군 회북면 오동리 2지구 암반 절개면의 붕괴원인 고찰)

  • Koo, Ho-Bon;Baek, Yong;Kim, Gyu-Han;Rhee, Jong-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.535-542
    • /
    • 2000
  • The investigated cut-slope is located in Odong-Ri, Hoebuk-Myun, Boeun-Gun and composed of quartzite and phyllitic rocks (approximately 80 meters in length and 25 meters in height). During the investigation, the groundwater which was inferred to the natural pipe of slope was continuously flowing in the upper part of slope. The investigation for discontinuity properties in this area was carried out to decide the rock mass rating and strength parameters. To analyze the stability of cut-slope, lower equal-area hemisphere projection method was used. And laboratory test was done to evaluate engineering properties of soil which was sampled in the non-failure and failure area The inferred causes of cut-slope failure are the geometric relationship between the orientation of cut-slope and geological structures such as joints, faults which is distributed in the slope. And direct cause of failure is the increase of water content due to the heavy rainfall.

  • PDF

Effects of Pre-Strains on Failure Assessment Analysis to API 5L X65 Pipeline

  • Baek, Jong-Hyun;Kim, Young-Pyo;Kim, Woo-Sik;Seok, Chang-Sung
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.29 no.3
    • /
    • pp.219-223
    • /
    • 2009
  • This paper prescribed the structural integrity of the API 5L X65 pipeline subjected to tensile pre-strain. The effects of pre-strain on the mechanical properties of API 5L X65 pipe were substantially investigated through a variety of the experimental procedures. Axial tensile pre-strain of 1.5, 5 and 10% was applied to plate-type tensile specimens cut from the pipe body prior to mechanical testing. Tensile test revealed that yield strength and tensile strength were increased with increasing tensile pre-strain. The increasing rate of the yield strength owing to the pre-strain is greater than that of the tensile strength. However, the pre-strain up to 5% had a little effect on the decreasing of the fracture toughness. The structural integrity of the API 5L X65 pipeline subjected to large plastic deformation was evaluated through the fitness-for service code.

Behavior of Flexible Pipes with the Accelerated Flowable Backfill Materials Using Surplus Soil for Underground Power Utilities (굴착잔토를 재활용한 지중 전력케이블 유동성 뒷채움재 이용시 지중연성관의 거동특성)

  • Oh, Gidae;Kim, Daehong;Lee, Daesu;Kim, Kyoungyul;Hong, Sungyun
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.7
    • /
    • pp.33-41
    • /
    • 2009
  • In the case of underground power utilities pipe such as circular pipe, the most difficult problem is low compaction efficiency of the bottom of pipe inducing the failure of utilities. To overcome this problem, various studies have been performed and one of these is CLSM (controlled low strength materials) accelerated flow ability. CLSM has already been stage of commercial use in the foreign countries led by power company. In this study, we estimated the behavior of flexible pipe with flowable backfill materials and sand to compare on the DB24 load. The results showed that the deformation of flexible pipe is affected by types of backfill materials. CLSM shows better behavior characteristics than compacting sand. But numerical and analytical results that peformed to compare to the field test results showed big gap with the field results.

  • PDF

Development of Assessment Methodology for Locally Wall-Thinned Pipe Under Combined Loading (복합하중이 작용하는 국부감육배관 평가법 개발)

  • Shim Do-Jun;Kim Yun-Jae;Kim Young-Jin;Park Chi-Yong
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.29 no.10 s.241
    • /
    • pp.1399-1406
    • /
    • 2005
  • Recently authors have proposed a new method to estimate failure strength of a pipe with local wall thinning subject to either internal pressure or global bending. The proposed method was based on the equivalent stress averaged over the minimum ligament in the locally wall thinned region, and the simple scheme to estimate the equivalent stress in the minimum ligament was proposed, based on the reference stress concept. This paper extends the new method to combined internal pressure and global bending. The proposed method is validated against FE results for various geometries of local wall thinning under combined loading. The effect of internal pressure is also investigated in the present study. Comparison of maximum moments, predicted according to the proposed method, with published full-scale pipe test data fur locally wall-thinned pipes under combined internal pressure and global bending, shows good agreement.

Incorporating uplift in the analysis of shallowly embedded pipelines

  • Tian, Yinghui;Cassidy, Mark J.
    • Structural Engineering and Mechanics
    • /
    • v.40 no.1
    • /
    • pp.29-48
    • /
    • 2011
  • Under large storm loads sections of a long pipeline on the seabed can be uplifted. Numerically this loss of contact is extremely difficult to simulate, but accounting for uplift and any subsequent recontact behaviour is a critical component in pipeline on-bottom stability analysis. A simple method numerically accounting for this uplift and reattachment, while utilising efficient force-resultant models, is provided in this paper. While force-resultant models use a plasticity framework to directly relate the resultant forces on a segment of pipe to the corresponding displacement, their historical development has concentrated on precisely modelling increasing capacity with penetration. In this paper, the emphasis is placed on the description of loss of penetration during uplifting, modelled by 'strain-softening' of the force-resultant yield surface. The proposed method employs uplift and reattachment criteria to determine the pipe uplift and recontact. The pipe node is allowed to become free, and therefore, the resistance to the applied hydrodynamic loads to be redistributed along the pipeline. Without these criteria, a localised failure will be produced and the numerical program will terminate due to singular stiffness matrix. The proposed approach is verified with geotechnical centrifuge results. To further demonstrate the practicability of the proposed method, a computational example of a 1245 m long pipeline subjected to a large storm in conditions typical of offshore North-West Australia is discussed.

Numerical Analysis for Comparing Beam-spring and Continuum Model for Buried Pipes Considering Soil-pipe Interaction (매설관과 지반의 상호작용을 고려한 보-스프링 모델과 연속체 모델의 수치해석적 비교 연구)

  • Jeonghun Yang;Youngjin Shin;Hangseok Choi
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.9
    • /
    • pp.15-24
    • /
    • 2023
  • The behavior of buried pipes is directly influenced by the nonlinearity and complex characteristics of the surrounding soil. However, the simplified beam-spring model, which ignores the nonlinearity and complex behavior of soil, is commonly used in practice. In response, several studies have employed continuum analysis methods to account for the nonlinear and complex behavior of the soil. This paper presents various numerical continuum analysis techniques and verifies their comparison with full-scale tests. The study found that reaction force results close to the full-scale test could be obtained by applying contact surface characteristics that take into account the interaction between the ground and the buried pipe. In the case of sharing pipe and soil node method and ignoring the interaction between pipe and soil, excessive reaction force was derived, and the failure shapes were different. In addition, this study applied the dynamic explicit analysis method, ALE method, and CEL method. It was confirmed that the displacement-reaction relationship and failure shape are similar to those of the static analysis.

Experimental Studies on Comparison of Stress Corrosion Cracking Generation Due to Pipe Material Degradation in the Primary Stage of the Nuclear Power Plant (원전 1차 측 배관재질의 열화에 따른 응력부식균열 발생 비교 실험 연구)

  • Park, Kwang-Jin;Lee, Gyu-Young;Bae, Dong-Ho
    • Proceedings of the KSME Conference
    • /
    • 2007.05a
    • /
    • pp.108-113
    • /
    • 2007
  • In this report, stress corrosion cracking generation due to pipe material degradation in the primary stage of the nuclear power plant was investigated. Firstly, after artificially degrading the CF8A steel during 2, 4, and 6 months in actual temperature, $400^{\circ}C,$ assessed corrosion susceptibility of the degraded material following ASTM G5 standard. And next, the S.C.C. tests for the degraded material were conducted under the condition of $60^{\circ}C,$ 2wt.% H2BO3+Li70H solution, 0.8 oy. From the results, Corrosion rates linearly increased with degradation period and solution temperature increase. And both the raw material and the degraded materials were not failed in the S.C.C. test condition. In spite of long time test (about 3,900 hrs) under S.C.C. condition, surface pits or surface corrosion by the electro chemical reaction were not observed. And also, even though the nondestructive DCPD and ACPD methods were applied to on-line monitor the S.C.C. failure processes it was impossible because the surface pits and cracks were not generated.

  • PDF

A Study for Flaw Detection of 3/4″ Pipe by Using Guided Wave (유도초음파를 이용한 3/4″ 배관 결함 검출 연구)

  • Chung, Woo Geun;Kim, Jin-Hoi;Cheon, Keun Young
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.15 no.1
    • /
    • pp.40-45
    • /
    • 2019
  • Unlike the welded pipes in the primary system of light water nuclear power plants being periodically inspected with in-Service inspection program, relatively small pipes with the outer diameter less than 2 inch have not been regularly inspected to date. However, after several failure reports on the occurrence of critical crack-like defects in small pipes, inspection for the small pipes has been more demanded because it could cause the provisional outage of nuclear power plants. Nevertheless, there's no particular method to examine the small pipes having access limitations for inspection due to various reasons; inaccessible area, excessive radiation exposure, hazardous surrounding, and etc. This study is to develop a reliable inspection technique using torsional and flexural modes of guided wave to detect defects that could occur in inaccessible area. The attribute of guided wave that can travel a long distance enables to inspect even isolated range of the pipe from accessible location. This paper presents a case study of the evaluation test on 3/4" small-bore pipes with guide wave method. The test result demonstrates the crack signal behavior and assures possibility to detect the crack signal in a flexural mode, which is clearly distinguishable from the symmetric structure signal in a torsional mode.

The study of developing the freezing seal isolation method for the pre insulated heat transfer pipe (이중보온 열수송관에 대한 동결차수공법개발에 관한 연구)

  • You, Byounghee;Ahn, Changkoo;Kim, Woocheol;Shin, Ikho
    • Journal of Energy Engineering
    • /
    • v.26 no.3
    • /
    • pp.105-112
    • /
    • 2017
  • A lot of piping systems have been used from nuclear power systems to water supply systems. The maintenance of the piping systems is needed to ensure proper operation of the piping systems. Failure of the large pipe systems especially such as KDHC(Korea District Heating Corporation) can be a matter directly related to the enterprise productivity and profitability. It can also lead to very important issues in promoting public safety and convenience. Therefore a method of quick and safety repairs have been emerged as the most important problem. In this study, freezing seal isolation method using liquid nitrogen cryogenic refrigerant was developed for the maintenance of a pre insulated heat transport pipe of KDHC with a diameter of 300 mm. In this study, by employing computational analysis techniques we performed the flow and heat transfer analysis for the targeted pre insulated heat transfer pipe and freezing seal jacket(ice-Plug) and have selected for optimal system. The detailed design model based on the results of the computational analysis finally was produced. A laboratory-scale test apparatus were designed and the freezing seal isolation self-test carried out. Also the performance assessment tests in the test bed of KDHC were carried out for on-site application.