• 제목/요약/키워드: Pipe Construction

검색결과 714건 처리시간 0.028초

고강도 강관파이프 스트러트 흙막이공법 사례연구 (Case Study of Braced Wall System with High-strength Steel Pipe Strut)

  • 신재민;박현영;주진규;신윤석;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.19-20
    • /
    • 2012
  • According to develop urban area, the depth and floor area of basement tend to become deeper and larger. Excavation work for basement floor work is very important because its cost take 20% of total construction cost. Therefore, many studies of developing retaining wall system have performed for feasibility and safety in deep excavation work. In this study, new supporting system used high-strength pipe for retaining wall is introduced to reduce the construction cost and improve the safety and constructability by analyzing case study.

  • PDF

Evaluation of Pumping Characteristics of High Strength Concrete using Continuous Pumping System

  • Kwon, Dae-Hun;Lee, Han-Seung;Jeon, Jun-Young;Jeong, Woong-Taek;Jo, Ho-Kyoo;Kim, Hyung-Rae
    • 한국건축시공학회지
    • /
    • 제11권4호
    • /
    • pp.387-395
    • /
    • 2011
  • In the construction of tall-building, concrete pumping influences the success of the project. In order to establish pumping technology for high speed construction of tall building, study for quantitative evaluation of flow characteristics and pumpability should be conducted. So in this study, the characteristics including the inner pipe pressure, rheological properties of concrete and mortar through the continuous pumping test were evaluated. Then we analyzed the relations between rheological properties and pumpability. In the result of test, there are high correlations between the rheological characteristics which represented by yield stress and plastic viscosity and pressure loss with pipe length. Also, we estimated pressure loss according to conditions of concrete mix and pumping through the evaluation of inner pipe friction.

강관비계 띠장 간격의 실무적 해석 - 단관비계 중심으로 - (The practical analysis of the gap of ledger scaffolding - focus on Pipe scaffolding -)

  • 배준태;김치경
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2012년 춘계학술대회
    • /
    • pp.301-311
    • /
    • 2012
  • The law(construction standard specification, construction, standard-work regulation, Industry safety standard related regulation) related to the installation of scaffolding being used commonly on the construction site is regulated that the gap of ledger is within 1.5m and first ledger is within 2m. The gap of ledger here is essential for the stability of scaffolding structure. But it is determined that it is possible for the gap of ledger is applied by explaining safety handrail as ledger, because of the fact that in current, on the construction site, safety handrail is installed with the material of scaffolding ledger as a steel tube pipe. On this study, it is aimed to guarantee the safety by analyzing the ledger of scaffolding practically and prevent the accident of manager and laborer through the actualization.

  • PDF

재사용 파이프서포트 인증제도의 개선방안 연구 (A Study on the Improvement Plan of Reusable Pipe Support Certification System)

  • 문성오;임남기
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 가을 학술논문 발표대회
    • /
    • pp.4-5
    • /
    • 2020
  • Pipe support is a representative structure that supports slab formwork, and it is a representative temporary equipment that has been systematically managed since the 1990s when the domestic temporary equipment performance test system was introduced. Nevertheless, it is also a reality that many of the products in circulation are used products that are reused and do not meet the performance of the initial manufacturing stage. However, if only new products are insisted, it could lead to delays in the process due to an increase in construction costs and difficulties in timely delivery. On the contrary, it is not acceptable for the safety of the construction site to use products of low quality without verification procedures or standards. Therefore, this study attempts to grasp the management system such as safety certification for temporary equipment and the actual condition of quality control to maintain performance, and propose improvement plans.

  • PDF

강관압입후 슬롯 홀을 갖는 비개착 터널공법의 현장적용에 관한 연구 (A Study on Sites Application of Non-open-cut Tunnel Method with Slot Holes in Steel Pipe Pumping)

  • 채영석;송관권;민인기
    • 한국안전학회지
    • /
    • 제30권1호
    • /
    • pp.47-51
    • /
    • 2015
  • In the study, a new non-open cut tunnel steel pipe method using slot hole has been developed. As is overcomes shortcomings of conventional methods, it is applied to the field. The main concept of the new method is the steel pipe pumping system with slot holes which, by means of formation slot holes between each steel pipe, applied to the magnitude of the relaxed earth pressure caused by excavation to the ground to prevent ground displacement. The stability of the support members and effect of displacement control of the new method were verified through several ways as numerical analysis and site test. The new method was applied to the construction of a 11.5m wide, 7.4m high and 50m long section that passes side subway and large buildings in inner city. By applying the new method, tunnel construction was successfully completed in 6 months. It decreases the construction period to 30% compared to that of conventional methods, and ground was almost negligible.

A Study on Behavioral Characteristics of Track Roadbed according to Steel Pipe Press-in Excavation during Construction of Underground Railway Crossing

  • Kim, Young-Ha;Eum, Ki-Young;Kim, Jae-Wang
    • International Journal of Railway
    • /
    • 제6권2호
    • /
    • pp.69-77
    • /
    • 2013
  • In this study, numerical analysis and model experiments were conducted to analyze behavioral characteristics acting on the track roadbed with excavation through steel pipe injection, a non-exclusive method of crossing construction under railroad as primary target. In model experiments that simulate injection excavation behaviors with an increase in the depth of soil cover, the upper displacement was measured by construction of the first and the second pipes in order to predict actual behaviors, and the behavior characteristics were verified through numerical analysis. The investigation results showed that surface displacement was smaller under the condition of higher soil cover. In the case of injecting two pipes, when the first pipe was injected, deformation of the surface increased linearly in both settlement and uplift experiments. However, when the second pipe was injected, the amount of change was found to be very small due to the relaxation and plastic zones around the first pipe. In addition, the results of numerical analysis on the same cross section with the model experiment found that the results of investigation into settlement ratio and volume loss were in very good agreement with those obtained by the model experiment.

인천국제공항 여객터미널 전면 고가 교량 공사 시공방법 및 수화열 대책 (Construction Method and Control System of the Heat of Hydration for Inchon International Airport Elevated Road Way)

  • 임채만;박명웅;조용기;조선규;김은겸
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1999년도 학회창립 10주년 기념 1999년도 가을 학술발표회 논문집
    • /
    • pp.869-881
    • /
    • 1999
  • Inchon International Airport Elevated Road Way is located between the Passenger Terminal Building and Transportaion Center which are Inchon International Airport core construction projects. The deck of the bridge is consists of 5-span or 6-span continuous pre-stressed concrete slab. Steel form has been used to enhance the quality of texture on concrete slab. Steel form has been used to enhance the quality of texture on concrete surface, lower surface of deck slab with the two way arch has been manufactured by highly professional manner in order to get an beautiful exterior architectural looks. The prestressed concrete deck slab is mass concrete structures with a high-specified concrete strength and a varying section in the range of 0.95-2.8m thickness. Therefore high risks of thermal cracking occurrence by heat of hydration highly are expected. To resolve such problem, we adopted type 1 cement and pipe cooking method at construction site through mass concrete specimen test and 3-dimensional analysis. For Pipe cooling we used 25mm diameter stainless pipes with wrinkles. Cooling pipe with spacing 50-60cm has been installed. And continuous pipe cooling with cooling water of 15$^{\circ}C$ was conducted for 2days. In present 8 span of all 29 spans construction has been completed. No thermal cracking heat hydration has been observed yet.

  • PDF

MMA 모르터 복합체의 강도특성 및 부재설계 (I) (Member design and strength characteristics of the MMA mortar composites (I))

  • 지효선
    • 복합신소재구조학회 논문집
    • /
    • 제6권3호
    • /
    • pp.41-49
    • /
    • 2015
  • The repair of manhole raise has been caused much construction times and disruption of traffic flow, serious environmental pollution from crushed construction wastes, and budget waste due to the repeated repair construction works. In order to overcome such problems, we have developed the new manhole repairing composite structures by using a glass fiber-reinforced polymer (GFRP) pipe, which can raise manhole to the regular height of the overlayed road pavement with rapid construction and minimum traffic jams. This environmental-friendly technology is method completed by the methyl methacrylate monomer (MMA) double wide flanged GFRP pipe composite structures in order to raise manhole to the regular height. In this paper, two kinds of the compressive strength tests of MMA mortar composites were conducted and evaluated by a general compressive strength test, and compressive strength test after freezing-thawing resistance test. It was found that this MMA mortar composites will be used for the application of the double wide flanged GFRP pipe composite structures.

"MODEL SPELL CHECKER" FOR PRIMITIVE-BASED AS-BUILT MODELING IN CONSTRUCTION

  • 권순욱;프레데릭 보쉐;허영기
    • 한국건설관리학회논문집
    • /
    • 제5권5호
    • /
    • pp.163-171
    • /
    • 2004
  • This research investigates a Modeling Spell Checker that, similarly to Word Spell Checker for word processing software, would conform as-built 3D models to standard construction rules. The work is focused on the study of pipe-spools. Specifically pipe diameters and coplanarity are checked and corrected by the Modeling Spell Checker, and elbows are deduced and modeled to complete models. Experiments have been conducted by scanning scenes of increasing levels of complexity regarding the number of pipes, the types of elbows and the number of planes constituting pipe-spools. For building models of pipes from sensed data, a modeling method, developed at the University of Texas at Austin, that is based on the acquisition of sparse point clouds and the human ability to recognize geometric shapes has been used Results show that primitive-based models obtained after scanning construction sites can be corrected and even improved automatically, and, since such models are expected to be used as feedback control models for equipment operators, the higher modeling accuracy achieved with the Modeling Spell Checker could potentially increase the level of safety in construction. Result also show that some improvements are still needed especially regarding the co-planarity of pipes. In addition, results show that the modeling accuracy significantly depends on the primitive modeling method, and improvement of that method would positively impact the modeling spell checker.

연직파이프쿨링 공법에 의한 매스콘크리트 온도균열 제어 (Thermal Cracking Control of Mass Concrete by Vertical Pipe Cooling Method)

  • 서태석;임창근;조윤구
    • 한국건설순환자원학회논문집
    • /
    • 제2권3호
    • /
    • pp.233-238
    • /
    • 2014
  • 합벽, 옹벽, 교량 주탑과 같이 세장한 매스콘크리트 구조물의 경우 온도균열 제어를 위해 저발열 콘크리트 배합의 적용 및 균열유발줄눈의 설치 등이 주로 적용되고 있다. 하지만 이러한 대책이 적용되어도 세장한 매스 구조물들은 내부구속에 비해 외부구속이 크기 때문에 완벽한 균열제어가 불가능하고, 특히 균열이 발생하게 되면 거의 관통을 하기 때문에 온도균열제어를 위한 특별한 관리가 필요하다. 합벽, 옹벽, 교량 주탑과 같이 세장한 매스콘크리트 구조물의 적극적인 온도균열 제어를 위하여 기존의 파이프쿨링 공법을 개선시킨 연직파이프쿨링 공법을 개발하였으며, 현장 우수조/중수조 합벽 콘크리트에 적용이 되었다. 그 결과 합벽의 중심부 최고 온도를 10도 이상 낮츨 수 있는 것으로 나타났으며, 균열은 50% 이상 감소시킬 수 있는 것으로 나타났다.