To mitigate the development gap between urban and rural area, the government has implemented project planning as the Rural Integrated Development in each Gun level since 1986. On account of shortage of the development fund, the government had changed the Gun level development into Myeon level development so called the Rural Central Settlement Zone Development. The government had started nine pilot projects throughout Korea from 1990. This study is aimed at identifing problems that found in the course of implementation of the projects and recommending the new direction of the successful implementation of the projects in the future. The problems and directions found in the cource of project implementation were as follows: 1. Project implementation by investment priority considering economic and financial rate of return should be made. 2. Objective project planning should be made. 3. Equal allocation of the limited investment fund by group interest and egoism should be prohibited. 4. Enforcement of special man power should be taken into account. 5. Unification of the diversified existing terms and conditions of loans for house construction and improvement. 6. Road development oriented budget allocation should be improved. 7. Sufficient development fund should be procured considering the present rate of sufficiency of the project cost as 36%. 8. Sufficient supply of the credit loans for improvement of living environment of the farmers should be realized. 9. Rational implementation planning in connection with farm household income source development should be made.
G. Edward Jr. Gibson;James T. O'Connor;Giovanni C. Migliaccio;Pramen P. Shrestha
국제학술발표논문집
/
The 1th International Conference on Construction Engineering and Project Management
/
pp.974-979
/
2005
Effective communication flow is a fundamental for the success of any construction projects. The key role of communications among project parties is even more critical in the case of Design-Build (DB) projects. Previous research has shown that these projects have an environment where integration between different project team members and schedule constraints increase channels of communication, and require faster communication flows. This paper summarizes the findings from research analyzing organizational structures and communication flow of the Texas State Highway 130 (SH130) project. Awarded in 2002, the SH130 project, totaling $1.3 billion USD, constitutes the "pilot" application for the DB approach in the state of Texas. A set of observations pertaining to team organization and communication issues in the design-build environment is included.
본 연구는 사회구성주의 시각에서 보건복지사무소와 사회복지사무소에 참여한 직원들의 보건복지 협력경험을 벤슨의 균형모델(Benson, 1975)과 바이크의 센스메이킹 이론(Weick, 1995)으로 분석함으로써 업무환경과 실무자의 역할을 구상하는데 함의를 얻고자 함에 그 목적이 있다. 두 시범사업의 각 네 지역을 선정하여 총 27명의 직원을 대상으로 반구조화된 면접을 실시한 결과, 양 분야 실무자들이 통합서비스 업무를 담당할 수 있는 구조적 관계적 환경을 초기에 구성하여 직역간 벽을 허물 수 있는 계기를 마련하는 것이 중요하다는 것이 부각되었다. 이러한 연구결과는 향후 이용자 중심 사회서비스 설계에 있어 보건 복지간 협력이 보다 중요해지고 관련된 정책구상이 불가피하다는 점에서 시사하는 바가 클 것으로 본다.
Purpose - This study reviews the achievements of a pilot project for the revitalization of a commercial district performed for three years after its establishment in 2011. The project for the revitalization of the commercial district was performed to create a new local community space in connection with the traditional market and nearby districts. Although it was a pilot project, the project for the revitalization of the commercial district has been performed for almost three years. Therefore, this seems a proper time to conduct an interim evaluation of the project. This study aims to review and evaluate how the government support policy is influential for the revitalization of the commercial district. In other words, this research aims to identify what projects positively affected consumers' intention to revisit the downtown commercial area among the commercial district revitalization projects-promotion events, promotion activities, education, merchants cooperation system, IT projects, cultural events, and residents' communication. Research design, data, and methodology - This study designated seven management improvement projects affecting commercial district revitalization based on preceding studies. The survey of the degree of satisfaction on seven management improvement projects was executed targeting consumers who visited the commercial areas. Additionally, visitors' revisit intentions regarding currently visited commercial areas were also investigated. Therefore, revisit intention was set as a dependent variable and the satisfaction degrees of the respective management improvement projects were set as the independent variables. A total of 1,209 consumers were examined in six districts in the country. Result - Multiple regression analysis results showed that cultural events, education, the merchants' cooperation system, and IT projects brought statistically significant effects to the revisit intentions of consumers. In contrast, promotion events, resident communication projects, and promotion activities did not affect the revisit intentions of consumers. Particularly, the residents' communication project did not show significant influence because of consumers' recognition that it is similar to a cultural event. Conclusion - The following implications for the revitalization of business districts in the urban central area are drawn. From a general perspective, the businesses of culture, education, and cooperative system among seven businesses play positive roles regarding the intention to revisit so that the project is required to be promoted periodically through unique performances differentiated for each district, the merchant training reinforced for professionalism, and the expansion of joint events of merchants. Moreover, the sales promotion project and public relations activity are shown to be not influential to the intention to revisit. Therefore, while short-term sales promotion such as one-time gift events are required, sales promotion and public relation activities to induce revisits by mileage savings and accumulated gift presentation to attract long-term customers are required. The IT business is positively influential to the intention of revisit. Therefore, detailed information on the revitalized commercial district should be provided and additional functions such as discount coupons for continuous utilization should be included in the mobile app and the website.
Korea has 30 years of experiences in environmental impact assessment (EIA). Although EIA includes sanitation-public health factor, considering health impacts, among 74 unit projects of 17 sections, health impacts haven't been properly considered or have been ignored in many cases. The increasing awareness on the importance of health impacts has triggered this study to seek an optimal introduction scheme of health impact assessment (HIA). The processes of EIA already include screening, scoping, analysis, impact assessment, consultation, document review, decision making and monitoring, in which they would be the essential parts of HIA. In this context, integrating HIA into the existing EIA process could be the most effective way to use the benefits in both legal and procedural processes existed and to avoid the confusion and overlapping since the close relationships between environment and health impacts might be. Furthermore, it is desirable that the existing sanitation-public health factor should be substituted by and extended to environment-health factor with sufficient determinants to properly consider health impacts. When considering the first step of HIA, the prospective and qualitative approach is suitable more than the retrospective and quantitative one due to the lack of database accumulated. Similarly, an approach based on epidemiology and toxicology could analyze the limited evidences and impacts related to human disease, whereas one based on socio-science and psychology could provide the effective means available for predicting how the people and community will act by the change of surroundings. Checklist approach with various and comprehensive health determinants focused on prospective and qualitative methods will be very useful for more convenient and progressive dissemination of HIA. Various checklist approaches of toolkits could be found from HIA documents elsewhere, for example Westminster Toolkit, and they would be helpful to figure out how to develop common procedures and health determinants for checklist, in which the unique characteristics on korean cultural and political context compared to abroad should be carefully considered since checklist would be the most basic and essential part of HIA. After the establishment of checklist and procedural processes, the pilot projects should be conducted. Main purpose of pilot projects is to apparently prove the effectiveness and profitability of HIA. Pilot projects should be implemented to decide the effectiveness and suitability of HIA for future projects, programs and policies, and should be provided as the positive cases that can be achieved through the proper implementation and progress.
The longitudinal integrated clerkship is an innovative approach in medical education that emphasizes continuity as a key principle to provide student-centered experiences and learning. Seoul National University College of Medicine decided to adapt longitudinal integrated clerkships to the new curriculum beginning in 2018, and therefore conducted pilot studies in 2016 and 2017. This study aimed to analyze the program evaluation results of the two pilot programs and discuss issues related to the successful implementation of longitudinal integrated clerkships in Korea. We conducted a focus group interview with nine students who participated in the 2016 pilot program and 13 students who participated in the 2017 pilot program. We also conducted a focus group interview with 11 faculty members who either participated in the pilot program or will participate in the main program. From the 2016 experience, we found that it is not appropriate to assign each patient to a single student and let the students contact their patients personally for feasibility and safety reasons. In the 2017 pilot program, we assigned each patient to a group of students, which made it more feasible for the students to follow-up with their patients. The students were satisfied with their new experience of longitudinal patient follow-up and regular meetings in the pilot program. Faculty emphasized the importance of establishing the course objectives and holding an orientation for the students and the faculty. Further study is planned to evaluate the early outcomes of the main longitudinal integrated clerkship.
Journal of Construction Engineering and Project Management
/
제6권4호
/
pp.1-6
/
2016
Construction industry ranks as the largest industry and imparts a significant part in developing and achieving the aims of society. Due to the involvement of larger number of stakeholders, construction industry is complex in nature. The current study is designed to identify and evaluate the factors affecting the success of construction projects in Khyber Pakhtunkhwa (KP), Pakistan. To carry out the study, a questionnaire was developed in term of interview pilot study. The data from the questionnaire survey was analyzed through SPSS software in five groups to accumulate authenticity of 44 factors. Later on the ranking was done by relative importance index (RII). According to the outcome of the research, "Project Group" stood highest among the five groups with factor of "project size" at the top rank while "Contractor Group" stood lowest with the factor of "client size" at bottom rank. From the study it is concluded that the Project Group is identified as a crucial blockade in success of construction projects. By giving pivotal attention to project group, the projects could be successfully attained from factors of project size, materials and equipment, funds and resources and project planning. To focus on the factors of project group, trust of the province people could be restored in construction of projects.
In this paper, we propose a pilot study to deploy the Railway Conflict Detection and Resolution System(RCDRS) in the context of Korean Railway(KORAIL). KORAIL plans to deploy in near future RCDRS, which is a decision support module placed on the top level of the Railway Traffic Management System(RTMS). This study entails the review of the state-of-art researches and projects in the field of the railway traffic management, as well as the analysis of the traffic characteristics of the major railroad lines in KORAIL. The analysis provides a basis to choose a solution approach for the railway conflict detection and resolution problem that each individual line faces. This study plays a role as a pilot study for a full systematic approach, in which interactions between lines require further advanced analysis to take the entire KORAIL lines into consideration rather than a myopic approach.
Yin, Zhe;DeGezelle, Deborah;Pappas, Mike;Caldas, Carlos
국제학술발표논문집
/
The 9th International Conference on Construction Engineering and Project Management
/
pp.590-598
/
2022
Benchmarking is an important tool to assess the performance of capital projects in the construction industry. Incorporating cost-related metrics into a benchmarking system requires an effective cost normalization process to enable meaningful comparisons among projects that were executed at different locations and times. Projects in the downstream and chemicals sector have unique characteristics compared to other types of construction projects, they require a distinctive cost normalization framework to be developed to benchmark their absolute cost performance. The purpose of this study is to develop such a framework to be used for the case of benchmarking the downstream and chemical projects for their performance assessment. The research team started with a review of existing cost normalization methodologies adopted in benchmarking systems and conducted 7 interviews to identify the current cost normalization practices used by industrial professionals. A panel of 12 experts was then convened and it held 6 review sessions to accomplish the framework development. The cost normalization framework for benchmarking downstream and chemical projects was established as a three-step procedure and it adopts a 4-element cost breakdown structure to accommodate projects submitted by both owners and contractors. It also incorporated 5 published cost indexes that are compatible with downstream and chemical projects and they were embedded into 2 options to complete the normalization process. The framework was then pilot-tested on 4 completed projects to validate its functional practicality and the downstream and chemical use case in the benchmarking system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.