• Title/Summary/Keyword: Pilot Project

Search Result 533, Processing Time 0.028 seconds

An Exploratory Study on the Construction of Retrospective Authority Data with National Authorities (국가전거를 활용한 단위 도서관의 전거데이터 소급 구축 연구)

  • Jee-Hyun Rho
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.57 no.1
    • /
    • pp.161-182
    • /
    • 2023
  • In the recent cataloging environment, the function of authority data is becoming more important. In Korea, a pilot project for sharing and joint use of the national authority data has been promoted since 2019, and a plan to automatically construct retrospective authority data using national authorities is in progress. This study aims to (1) analyze the results of the pilot project for retrospective authority data jointly promoted by the National Library of Korea and KERIS in 2019, (2) explore methodological limitations and problems in the process, and (3) derive policy proposals for constructing authority data more efficiently. To this end, a university library participating in the pilot project was investigated as a case study. Based on it, the automatic generation rate and accuracy of authority data, and errors and omissions cases and causes were analyzed in detail. As a results of the study, it was found that the quality of union catalogs and bibliographic records had a great influence on automatically constructing authority data, and supplementary methods were needed to minimize these limitations.

Major Risk Factors to Implement CM at Risk Pilot Project on the Public Sector (시공책임형 CM 발주방식 공공부문 시범사업 사례를 통한 리스크 도출)

  • Han, Jonghoon;Kim, Kyungtae;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.61-69
    • /
    • 2018
  • The buildings are getting enormous and more complex as well as the requirement of the owner which wants diverse and efficient. Moreover advanced management is necessary for construction services and a new method of delivering project is now required. In order to expand the delivering method and the construction industry, we have to introduced the CM at Risk method. However, despite the fact that six years have passed already the CM at Risk regulation was introduced, the contract amount in significantly lower than that of the CM for fee, and also there is no CM at Risk project in the public sector. As a result, three pilot projects are currently underway for the LH(Korea Land & Housing Corporation) in order to set up a CM at Risk for the public sector. However, detailed regulations related to CM at Risk have not yet been implemented in Korea. Therefore, in this study, I am trying to understand the risks that could incur when practitioners participate in the three pilot projects that are currently underway and employed in the public sector wherein the CM at Risk is normally introduced. Based on the results of this study, It will be able to utilize as a basic data for future CM at Risk delivery system improvement and enactment.

A Study of the Experiences and Changes of the Self-Sufficient Centers that Converted the Centre Corporation into Social Cooperative (지역자활센터의 사회적협동조합 전환과정과 변화에 대한 연구)

  • Baek, Hakyoung;Kim, KyoungHuy;Han, Kyounghoon
    • 한국사회정책
    • /
    • v.25 no.4
    • /
    • pp.265-299
    • /
    • 2018
  • The pilot project for type diversification of self-sufficient support center that convert the centre corporation into social cooperative was introduced in 2015. That aimed to increase the number of participants of self-sufficient programmes and to create more jobs for the working poor through expanding the center's autonomy of usage of budget and arrangement of self-sufficient programmes. This study analyzed the organization transmitting processes and changes of the centers took part in the pilot project, then aimed to suggest the improvement schemes to be helpful for reinforcing positive efforts and removing obstacles in the process converting. The results show that converting into social cooperative is a choice for the sustainability of the centers led by surroundings rather than self-initiated plan. There are some positive changes that are increasing the enterprising spirit and obligation of the center staff. Further more, the cooperation with other community organizations is enhanced based on achieving regional recognition, and support of local governments and the opportunity for new businesses are expanded. However, these are very limited in the regions where social economy is undeveloped. Eventually, we should seek the development schemes of the pilot project considering the reduction of the number of participants in self-sufficient programmes and decreasing of their ability to work, even if some positive aspects are revealed.

An Analysis of the Effect of the Pilot Project for the Management of the Elderly's Food Service in Cheongju City: Focused on improving hygiene control (청주시 노인급식 관리지원 시범사업의 효과분석 : 위생관리개선을 중심으로)

  • Lee, Joo-Eun
    • Journal of Digital Convergence
    • /
    • v.19 no.1
    • /
    • pp.431-441
    • /
    • 2021
  • In this study, the hygiene control status of meals for the elderly was investigated for the elderly care facilities, communal living families, and day care centers, which are members of the Cheongju Social Welfare Food Management Support Center, and the improvement of food hygiene management was compared and analyzed to find out the effectiveness of the pilot project after conducting management support such as hygiene education for the elderly and providing related supplies and information. The study found that after the first support, the average score of overall feeding hygiene control increased significantly from 63.13 points (out of 100) to 75.10 points (p<0.001) and from 75.10 points (out of 100) to 80.89 points (p<0.001). After primary support, 16 out of 29 items showed significant differences in average scores in the checklist, and 7 out of 29 after secondary visit support (p<0.05, p<0.01, p<0.001). Based on the effectiveness of the above-mentioned pilot project to support senior citizens' meal service management, more welfare facilities for senior citizens should be continuously supported by the Foodservice Management Support Center.

Estimating generation capacity of geothermal power generation pilot plant project (우리나라 지열발전 pilot plant 프로젝트의 발전량 추정)

  • Song, Yoonho;Lee, Tae Jong;Yoon, Woon Sang
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.197.1-197.1
    • /
    • 2011
  • Target generation capacity of geothermal power generation pilot plant project through the Enhanced Geothermal Systems (EGS) with a doublet system down to 5 km depth was estimated. Production and re-injection temperatures of geothermal fluid were assumed $160^{\circ}C$ and $60^{\circ}C$, respectively, based on reservoir temperature of $180^{\circ}C$ calculated from the geothermal gradient of $33^{\circ}C$ in Pohang area. In this temperature range, 0.11 of thermal efficiency of the binary generation cycle is a practical choice. Assuming flow rates of 40 kg/sec, which is possible in current EGS technology, gross power generation capacity is estimated to reach 1.848 MW. Net generation considering auxiliary power including pumping power for geothermal fluid and condensing (cooling) energy of working fluid can be 1.5 MW.

  • PDF

Classification and Analysis of the Project Contents and Expected Effects of Urban Regeneration Pilot Projects (도시재생 선도지역의 사업내용 및 기대효과 유형 분류 및 분석 -근린재생형 도시재생 선도지역 마중물 사업을 대상으로-)

  • Bae, Min-Kyung;Park, Seung-Hoon
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.10
    • /
    • pp.527-544
    • /
    • 2018
  • Urban regeneration is a project to enhance the competitiveness. Therefore, it is necessary to examine the contents and expected effects of urban regeneration projects. In this study, we classified and analyzed the contents and expected effects of the 11 neighborhood urban regeneration pilot projects. The main results are as follows; First, physical regeneration is the most popular in terms of project contents, and social approach is the most typical for the expected effects. Second, the project of social regeneration is mainly focused on strengthening the capacity of residents. Third, the most expected effect of physical regeneration was about the improvement of landscape. Fourth, the most expected effect of social regeneration was the contents of residents' participation. Finally, there is a need for the development of projects that can expect a combination effects rather than a single effect. The urban regeneration new deal projects need to pay more attention to projects that can have various effects based on the development of competitive urban contents.

ORGANIZATIONAL AND COMMUNICATION ISSUES FOR MANAGING DESIGN-BUILD HIGHWAY PROJECTS

  • G. Edward Jr. Gibson;James T. O'Connor;Giovanni C. Migliaccio;Pramen P. Shrestha
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.974-979
    • /
    • 2005
  • Effective communication flow is a fundamental for the success of any construction projects. The key role of communications among project parties is even more critical in the case of Design-Build (DB) projects. Previous research has shown that these projects have an environment where integration between different project team members and schedule constraints increase channels of communication, and require faster communication flows. This paper summarizes the findings from research analyzing organizational structures and communication flow of the Texas State Highway 130 (SH130) project. Awarded in 2002, the SH130 project, totaling $1.3 billion USD, constitutes the "pilot" application for the DB approach in the state of Texas. A set of observations pertaining to team organization and communication issues in the design-build environment is included.

  • PDF

Factors Affecting the Success of Construction Projects in Khyber Pakhtunkhwa, Pakistan

  • Musarat, M. Ali;Ahad, M. Zeeshan
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.4
    • /
    • pp.1-6
    • /
    • 2016
  • Construction industry ranks as the largest industry and imparts a significant part in developing and achieving the aims of society. Due to the involvement of larger number of stakeholders, construction industry is complex in nature. The current study is designed to identify and evaluate the factors affecting the success of construction projects in Khyber Pakhtunkhwa (KP), Pakistan. To carry out the study, a questionnaire was developed in term of interview pilot study. The data from the questionnaire survey was analyzed through SPSS software in five groups to accumulate authenticity of 44 factors. Later on the ranking was done by relative importance index (RII). According to the outcome of the research, "Project Group" stood highest among the five groups with factor of "project size" at the top rank while "Contractor Group" stood lowest with the factor of "client size" at bottom rank. From the study it is concluded that the Project Group is identified as a crucial blockade in success of construction projects. By giving pivotal attention to project group, the projects could be successfully attained from factors of project size, materials and equipment, funds and resources and project planning. To focus on the factors of project group, trust of the province people could be restored in construction of projects.

A Study on the Implementation Model of Global e-trade (글로벌 전자무역 구현모델에 관한 연구)

  • Lee, Sang-Jin;Chung, Ja-Son
    • International Commerce and Information Review
    • /
    • v.7 no.4
    • /
    • pp.305-322
    • /
    • 2005
  • To meet the demand of Korea's e-trade, global e-trade should be implemented and the global network is absolutely needed for the completion of e-trade. In this regard, this study suggested the concept and effect of global e-trade and analyzed the current status of PAA, ASEM projects which have been processing as pilot projects. Also, it derived tasks for the implementation of global e-trade through SWOT analysis and made up questions to the firms which are participating the pilot projects. Therefore, the four implementation models of global e-trade network are brought up. These models are very similar to each pilot project such as PAA, ASEM, and could be classified by developed and developing countries.

  • PDF

FEASIBILITY OF A RFID-BASED MONITORING SYSTEM FOR THE CONCRETE POUR PROCESS

  • S. W. Moon;S. M. Hong
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.433-439
    • /
    • 2007
  • A ubiquitous environment in construction requires integrating hardware and software systems. Currently the Construction System Integration Lab (CSIL) at Pusan National University is currently studying the application of ubiquitous technology for better communication in the construction process. In this paper, a pilot of Ubiquitous Concrete Pour System (u-CPS) has been presented to demonstrate the effectiveness of data exchange in the concrete pour process. The u-CPS environment takes advantage of the RFID technology for collecting construction data. The pilot can automatically generate the data for concrete pour work such as departure time, arrival time, concrete pour time. Construction managers can keep track of the progress of concrete pour work using the information. A case study was done for a building construction using the pilot system, the result of which demonstrated that the RFID-base system can help improve the effectiveness of data communication during the concrete pour process.

  • PDF