• Title/Summary/Keyword: Pier Construction

Search Result 181, Processing Time 0.031 seconds

Use of Concrete Filled Tube as a Pre-founded Column for Top Down Construction (Top Down 공사에서의 CFT 선기초기둥 활용방안)

  • Kang, Seung-Ryong;Rhim, Hong-Chul;Kim, Seung-Weon;Kim, Dong-Gun;Song, Jee-Yun;Jeong, Mee-Ra;Lee, Hai-Chool
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.31-34
    • /
    • 2008
  • Construction of buildings downtown is increasing as much as ever with a strong demand. A Top-Down Method is suitable for its advantage in minimizing its disturbance to the neighborhood. In general, the Pre-founded Column, one of the most important aspects of the Top-Down Method, has been made with an H-Shape Steel Column. However, due to its structural and economical benefits, the usage of CFT(Concrete Filled Tube) columns in the place of Pre-founded Columns is increasing. To promote their applications, we analyze the merits of CFT columns by comparing them with I-Shape columns and propose further research.

  • PDF

The Cross Section Optimization of P.C Box-Girder Bridge Constructed by Free Cantilever Method (FCM 으로 가설되는 P.C 박스거더교의 횡단면 최적설계)

  • 방명석;김일곤;조현준
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1991.04a
    • /
    • pp.56-60
    • /
    • 1991
  • Free Cantilever Method(FCM) is one of the most effective construction methods when precast prestressed concrete box girders are erected in the construction site. The special feature of FCM is that precast segments are erected in cantilever on the pier and connected in the middle of span to form the complete superstructure. Therefore each structural subsystem will be shown in each construction step and it should be analyzed for design whenever the segment is erected. In this study, the computer program was developed to optimally design the P.C box girder bridge considering tile construction sequence and verified by comparing the calculated results with the data of existing P.C box girder bridges. the sensitivity analysis was performed to show the efficiency of the developed program.

  • PDF

Study on Hydration Heat Analysis of Pier Foundation-Column Using Low Heat Concrete (저발열 콘크리트를 사용한 교각 기초-기둥의 수화열 해석에 관한 연구)

  • Jeon, Joong-Kyu;Kim, Sun-Gil;Jeon, Chan-Ki;Kim, Ki-Hyung
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.2 no.3
    • /
    • pp.217-224
    • /
    • 2014
  • This study carried out to evaluate the hydration heat analysis and fundamental characteristics such as air content, slump and compressive strength for field application of low heat concrete with premixed cement. The results of experiment show that low heat concrete with premixed cement have sufficient performances on the workability and compressive strength. In addition, hydration heat analysis shows that low heat concrete with premixed cement make sure of target thermal cracking index. Therefore, it is desirable to apply the low heat concrete with premixed cement on pier foundation-column.

The Flow Variation due to Pier Construction at Kwangyang Bay (컨테이너 부두건설에 따른 광양만의 유황변동)

  • Choi, Song Yeol;Cho, Won Cheol;Lee, Won Hwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.12 no.3
    • /
    • pp.115-125
    • /
    • 1992
  • The variation of flow pattern caused by the topographical change of Kwangyang bay, is analyzed using the numerical tidal model for the depth-integrated two- dimensional long wave equation. The results of study are as follows. Due to pier construction, the area of water surface is deceased and the water inflow into the Kwangyang bay is reduced. For this result, at the outer bay of Myo island, the tidal range is slightly increased. And at the inner bay, water level is dropped generally, and especially at the time of low water tide, the phenomena of water level drop obviously appears. According to the variation pattern, flow velocities is lower than those of non-construction condition over the Kwangyang bay. But at the channel(from Kwangyang east stream) flowing into the east Kwangyang bay, for the contraction of channel profile, flow velocity is increased. The study based on the 100 year frequency design flood discharge from Sueocheon(river) and Dongcheon(river) which are flowing into the bay and Seomjin River flowing along the boundary of the bay is also performed. During the spring tide condition, the results showed the rise of water level about 1.2 m at Seomjin River Estuary and 0.3 m at inner bay is occurred.

  • PDF

Development of Scour Depth Calculation Equation Based on Hydraulic Model Test Data (수리모형실험 자료를 활용한 교각세굴심 산정식의 개발)

  • Chang, Hyung-Joon;Lee, Ho Jin;Lee, Hyo Sang;Kim, Sung-Duk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.1
    • /
    • pp.163-168
    • /
    • 2020
  • Since the industrialization in the 1960s, Korea has been expanding its transportation infrastructure, such as building bridges. Owing to bridge construction, studies on stability review have been carried out, and stability-securing technology has been developed. On the other hand, these were applied mainly to the upper part of the bridge, so applications to the lower part are limited. In particular, scour at the bridge pier causes erosion in the riverbed and bridge collapse. Hence, prevention studies and countermeasures are needed. In this study, an empirical formula was developed to evaluate the scour depth of a bridge, which was calculated through multiple linear regression analysis using the hydraulic model study data conducted in previous studies. The formula, which had a value of 0.91, was applied to the model test data that was not used for development to verify the developed formula. When the pier scour depths were compared in 23 cases, the error rate was less than 20% in 16 cases (70%). The empirical formula developed in this study is applicable to pier scour-depth calculations. Further research will be needed to develop a more accurate empirical formula for pier scour-depth calculations, and it is expected to reduce bridge damage caused by scour.

Field Evaluation of Scour Countermeasure Using Geobag (지오백 세굴보호공법의 현장 적용성 평가)

  • Park, Jae-Hyun;Kwak, Ki-Seok;Lee, Ju-Hyung;Chung, Moon-Kyung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.1251-1258
    • /
    • 2006
  • Field evaluation of new scour countermeasure using geobag and aggregate is performed to prepare for the basis of design and construction standard in Korea. Polyester non-woven geotextile is determined as a geobag material and tire cord is used to sew up the geobag which contain aggregate. Hwasang-gyo(bridge) is selected as a pilot test site through office review and field investigation. According to the design flood of Hwasang-gyo(bridge), the size and volume of geobag are calculated and construction area and required number of geobags are computed by considering the specification of the pier and foundation of the bridge. After construction, scour depth around geobag construction area is measured and the stability of geobag is ascertained by using pole and digital camera.

  • PDF

Temperature Control of Mass-Concrete Structure with Pipe Cooling or Sheet Curing. (시트양생 및 파이프 쿨링에 의한 매스콘크리트 구조물의 온도제어)

  • 차홍윤;김은경;김래현;신치범
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1995.04a
    • /
    • pp.263-267
    • /
    • 1995
  • The usual methods for the temperature control of mass-concrete structures include the use of low-heat cement, pre-cooling, post-cooling, or sheet curing. In order to control the heat of hydration during the construction of mass-concrete structures, the combination of the above methods is commonly employed. For the construction of mass-concrete structures such as massive pier or anchor, it is necessary to control the curing temperature with pipe cooling. In this study, the method of analysis on the effect of pipe of was proposed to prevent the thermal cracking due to heat of hydration In addition the effect of covering the concrete surface with blanket insulation was investigated. The results of the present study may be useful for the prediction of curing temperature of mass-concrete structures and the reasonable construction management.

  • PDF

A Case Analysis on the Displacement of Soft Fundation -Kwangyang Industrial Highway- (연약지반의 변위에 대한 사례연구-광양산업도로)

  • 박병기;정진섭
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1994.03a
    • /
    • pp.43-58
    • /
    • 1994
  • In this reaserch, the comparison between numerical results and field measurments including settlement, heaving and lateral displacement, in the interchange construction works on soft ground. Sand drain was performed for the improvement of the site and steel pipe piles driven for the pier foundation of interchange. The steel pipe piles were replaced to the equivalent steel sheet pile wall. Biot's equation was coupled with elasto-viscoplastic model for the multi-purpose program of soft foundation. Finally countemeasures for future possible lateral displacement and settlement were exmanined.

  • PDF

Design of Pull Box Members on the Landing Pier Using Finite Element Analysis of a Steel Plate (강재 플레이트 유한요소해석을 이용한 잔교 상부의 풀 박스 부재의 선정)

  • Kim, Sungwon;Hong, Hyemin;Han, Taek Hee;Seo, Seung Nam
    • Journal of Coastal Disaster Prevention
    • /
    • v.4 no.3
    • /
    • pp.111-118
    • /
    • 2017
  • In this study, pull box members were designed by finite element analysis of a steel plate covering a pull box to secure its safety on the landing pier dedicated to the large research survey ship. It was assumed that the maximum load is due to the 250 tonf class crane used for unloading work when the working environment in the upper part of the landing pier was considered. The safety of the pull box was evaluated by the comparison between the yield strength of the steel plate and the result of stress analysis on the steel plate due to the crane load. It was found that the stress at the plate from the crane load exceeded the yield strength of the steel(205MPa) when the upper part of the pull box was protected by a $1950{\times}1950mm$ steel plate cover. In order to compensate for this, a concrete filled steel tube(CFT) column with a diameter of 150 mm and a steel thickness of 10 mm was reinforced at the center of the plate, and the finite element analysis was carried out. However, the maximum stress at the steel plate was higher than the yield strength of the steel in some load cases so that it was tried to find appropriate thickness of the steel plate and diameter of the CFT columns. Finally, the analysis results showed that the safety of the pull box was secured when the thickness of the steel plate and the diameter of the CFT column were increased to 30mm and 180mm, respectively.

Stability Analysis of Existing Tunnel in Stratified Sedimentary Rocks Subjected to Bridge Pier Load (퇴적암 지역에서의 교각 기초 하중을 받는 기존터널의 안정성에 대한 해석적 고찰)

  • 김교원
    • The Journal of Engineering Geology
    • /
    • v.8 no.2
    • /
    • pp.153-161
    • /
    • 1998
  • An anisotropic characteristics of stratified sedimentary rocks should be considered in the design of tunnel. The second line of Taegu subway is under construction through the sedimentary rocks which is stratified by alternation of shale and sandstone, and Tongsoe over bridge road is planned to be constructed along the subway line. Thus the subway twin tunnels will be subjected by the bridge load of 76.2 MN per pier that will be placed in between the twin tunnels of the subway line. A numerical analysis is carried out for the stability of the twin tunnel, and the result shows that the maximum principal stress of surrounding ground is increased by 5∼6 MPa and the additional displacement of concrete lining is reached up to 8∼10mm due to the external bridge load. For the safety operation of the subway, reinforcement of the tunnel structure is highly recommended.

  • PDF