Sewage has been almost treated by secondary treatment process. Secondary-treated effluent of sewage treatment plant caused the pollution of nearby beach. Nitrogen(N) and Phosphorus(P) in effluent water have caused many problems on estuary, such as red tide, eutrophication and aquatic toxicity. Therefore, the effective nitrogen and phosphorus removal from sewage treatment plants is necessary to prevent those pollution problems. However, little sewage treatment plant in Korea is effectively being operated for the removal of the nutrients. This study is analyzed for the effectiveness of cost when tertiary treatment process and Ocean Outfall are applied for the water quality of Suyong Bay After secondary treatment process, the effluent was discharged from the seabed in the depth of 32m of 4000m offshore. Pollutant concentration is decreased as much as the 180 times after the result of initial dilution, so that environmental protection requirement of Suyong Bay can satisfied. This Ocean Outfall process can save the 2.6~3.5 times as much as the cost of construction and operation for tertiary treatment process running over a 20 year.
The combination of biological and physical/chemical technologies is a promising technique to reduce highly concentrated pollutants in livestock wastewater. It is suggested to treat livestock wastewater efficiently as follows: firstly, biodegradable organic matters, nitrogen and some of phosphorus should be removed by a biological treatment process and then residual non-biodegradable organic matters, color and phosphorus be eliminated by physicochemical technologies. In this study, therefore, the integrations of chemical coagulation, activated carbon adsorption, Fenton oxidation and ozonation were evaluated to provide appropriate post-treatment processes for biologically pre-treated livestock wastewater. After chemical coagulation followed by ozonation or Fenton oxidation process, the quality of treated wastewater could meet the discharge limit in Korea. However, a yellowish brown color still remained in the treated wastewater after a single method such as coagulation and Fenton oxidation was applied. The ozonation was found to be the most effective technology for the decolorization. Neither simple biological nor physicochemical treatment provides adequate decolorization and sufficient depletion of organics in livestock wastewater so far. Consequently, the integration of Fenton oxidation and ozonation with a biological treatment process is recommended to treat livestock wastewater in terms of removal efficiency.
Proceedings of the Korean Society of Environment and Ecology Conference
/
2003.10a
/
pp.105-126
/
2003
In Korea most of annual rainfall is concentrated in several episodic heavy rains during the season of summer monsoon and typhoon. Because of uneven rainfall distribution many dams have been constructed in order to secure water supply in dry seasons. The Han River system has the most dams among Korean rivers, and the river is a series of dams now. Reservoirs need different strategy of water quality control from river water. Autochthonous organic matter and phosphorus should be the major target to be controlled in lakes. In this Paper some problems are discussed that makes efforts of water quality improvement ineffective in lakes of Korea, even after the substantial investment to wastewater treatment facilities.1) Phosphorus is the key factor controlling eutrophication of lakes and the reduction ofphosphors should be the major target of water treatment. However, water quality management strategy in Korea is still stream-oriented, and focused on BOD removal from sewage. Phosphorus removal efficiency remains as low as 10-30%, because biological treatment is adopted for both secondary treatment and advanced treatment. The standard for TP concentration of the sewage treatment plant effluent is 6 mgP/l in most of regions, and 2 mg/l in enforced region near metropolitan water intake point. TP in the effluents of sewage treatment plants are usually 1-2 mg/1, and most of plants meet the effluent regulation without a further phosphorus removal process. The generous TP standard for effluents discourages further efforts to improve phosphorus removal efficiency of sewage treatment. Considering that TP standard for the effluent is below 0.1 mg/l in some countries, it should be amended to below 0.1 mg/l in Korea, especially in the watershed of large lakes.2) Urban runoff and combined sewer overflow are not treated, even though their total loading into lakes can be comparable to municipal sewage discharges on dry days. Chemical coagulation and rapid settling might be the solution to urban runoff in regard of intermittent operation on only rainy days.3) Aggregated precipitation in Korea that is concentrated on several episodic heavyrains per year causes a large amount of nonpoint source pollution loading into lakes. It makes the treatment of nonpoint source discharge by methods of other countries of even rain pattern, such as retention pond or artificial wetland, impractical in Korea.4) The application rate of fertilizers in Korea is ten times as high as the average ofOECD countries. The total manure discharge from animal farming is thought to be over the capacity of soil treatment in Korea. Even though large portion of manure is composted for organic fertilizer, a lot of nutrients and organic matter emanates from organic compost. The reduction of application rate and discharge rate of phosphorus from agricultural fields should be encouraged by incentives and regulations.5) There is a lot of vegetable fields with high slopes in the upstream region of the HanRiver. Soil erosion is severe due to high slopes, and fertilizer is discharged in the form of adsorbed phosphorus on clay surface. The reduction of soil erosion in the upland area should be the major preventive policy for eutrophication. Uplands of high slope must be recovered to forest, and eroded gullies should be reformed into grass-buffered natural streams which are wider and resistant to bank erosion.
The objective of this study was to establish the optimal system operating strategies for nitrogen and phosphorus removal through model simulation system built for advanced wastewater treatment targeting on simultaneous temporal/special phase isolation BNR process. The simulation system was built with unit process modules using object modules in GPS-X code. The system was well verified by field experiment data. Simulation study was carried out to investigate performance response to design and operation parameters, i.e. hydraulic retention time (HRT), solids retention time (SRT), and cycle time. The process operated at HRTs of 10~15 hours, longer SRTs, and cycle time of 2 hours showed optimal removal of nitrogen. The HRTs of 10~15 hours, SRTs of 20~25 days, and longer cycle time was optimal for phosphorus removal. Both simulation and field studies showed that optimal operating strategies satisfying both the best nitrogen and phosphorus removals include HRTs ranged 10~15 hours, SRTs ranged 20~25 days, and cycle times of 4~8 hours. The simulation system with modularization of generalized components in BNR processes was, therefore, believed to be a powerful tool for establishing optimal strategies of advanced wastewater treatment.
This paper proposes a modified Ludzack-Ettinger (MLE) type membrane bioreactor (MBR) as a method of treatment for wastewater from food waste disposer. Micro-membrane filtration allows for an extremely low concentration of suspended solids in the effluent. The effluent of the reactor in question is characterized by a relatively high level of non-biodegradable organics, containing a substantial amount of soluble microbial products and biomass. Results obtained in this paper by measurement of membrane fouling are consistent with biomass concentration in the reactor, as opposed to chemical oxygen demand (COD). The MLE process is shown to be effective for the treatment of wastewater with a high COD/N ratio of 20, resulting in are markedly high total nitrogen removal efficiency. Denitrification could be improved at a higher internal recycle ratio. Despite the low concentration of influent phosphorus, the phosphorus concentration of the outflow is seen to be relatively high. This is because outflow phosphorous concentration is related to COD consumption, and the process operates at along solids retention time.
Onodera, Toshihito;Sakai, Yasuzo;Kashiwazaki, Masaru;Ihara, Ikko;Lal, Saha Mihir
Progress in Superconductivity and Cryogenics
/
v.23
no.3
/
pp.20-25
/
2021
Milking parlor wastewater contains high concentration suspended solid (SS), nitrogen, and/or phosphate as well as organic compounds. A new biological wastewater process by magnetic separation, magnetic activated sludge (MAS) process, was applied to milking parlor wastewater treatment process. A three step wastewater treatment process of coagulation sedimentation / ammonia stripping (C/S), magnetic activated sludge process and contact oxidation (CO) was proposed for removal of these pollutants. First step, C/S process recovered 96% TN and 96% PO43--P as resource for fertilizer from the wastewater. 81% biochemical oxygen demand (BOD) in wastewater was removed after MAS process. As a results, all pollutant concentrations satisfied Japanese effluent standards. Most of residual BOD and SS were removed by the CO process. It was estimated that the proposed process could reduce the process space to 1/7.
Journal of Korean Society of Environmental Engineers
/
v.36
no.2
/
pp.96-102
/
2014
To meet the reinforced discharge standards, effect of coagulant PAC (Poly aluminium chloride, 10.4% as $Al_2O_3$) on phosphorous removal in advanced wastewater treatment process (a modified $A^2$/O). 15 mg/L of PAC determined by jar-test was added to influent of settling basin in a modified $A^2$/O consists of anaerobic, anoxic, and oxic chamber which contains Bio-clod and porous polyurethane media. Performance of PAC was tested by supernatant after settling. The removal efficiencies of BOD, COD, TP (total phosphorus) and SP (soluble phosphorus) on biological process with PAC were 96.1%, 88.8%, 97.0% and 98.6%, compared with those on biological process without PAC were 95.4%, 72.4%, 71.6% and 59.5% respectively. 18.4% of TP and 39.1% of SP removal efficiency was increased, although increase of BOD and COD removal rate was not significant. Only PAC addition to influent of settling basin in $A^2O$ process can help total phosphorus removal to 0.13 mg/L with following discharge standard.
Park, Woon-Ji;Lee, Hae-Seung;Lee, Chan-Ki;Kim, Sung-Gun
Journal of Korean Society on Water Environment
/
v.20
no.5
/
pp.457-465
/
2004
The objective of this study is to evaluate the possibility to apply the Moving Bed Biofilm Reactor(MBBR) in the activated sludge treatment process with existing aerobic HRT. Optimal operation conditions were assumed according to the analysis of organic matter and nutrients removal efficiencies depending on loading variations. The process was operated under different conditions: RUN I(HRT=7.14hr, $I{\cdot}R=100%$), RUN II(HRT=6.22hr, $I{\cdot}R=100%$), RUN III(HRT=6.22 hr, $I{\cdot}R=150%$), RUN IV(HRT=6.22hr, $I{\cdot}R=200%$), the TBOD removal efficien cies are 88%, 88.5%, 94.6%, 97.6%, respectively. Overall TSS removal efficiency is 90%, and it is increasing in RUN IV. In the case of Nitrogen, the highest removal efficiency of 90% was observed in RUN III and RUN IV, Nitrification and Denitrification rates are 0.013-0.016kg $NH_3-N/kg$ Mv-d and 0.009-0.019kg $NO_3/kg$ Mv-d, respectively. Phosphorus removal efficiencies are 89.6% in RUN I, 91.5% in RUN II, 84.3% in RUN III, and 76.4% in RUN IV. The process under shorter SRT yields better performance in terms of phosphorus removal. It was noticed that to achieve the effluent phosphorus concentration ofless than 1mg/L and removal efficiency higher than 80%, SRT should not be longer than 10 days. Experimental result shows that HRT of 6.22 hours is suitable for this treatment process, and, as a result, the aerobic reactor including moving media and DO depletion tank have a sufficient effect to the process performance.
Park, Ju-Seok;Kim, Hyun-Kab;An, Chang-Hwan;Whang, Jung-Ki;Ahn, Sang-Jun
Journal of Korean Society of Water and Wastewater
/
v.13
no.3
/
pp.29-35
/
1999
The purpose of this study is to remove the organics, nitrogen and phosphorus using biosorption for the domestic sewage. The new process using biosorption is based on the methods of contact-stabilization, which remove the organics by absorbing them to the surface of the microorganism in the activated sludge. This process consists of biosorption reactor, biosorption clarifier, nitrifying reactor, nitrifying clarifier, denitrifying reactor, phosphorus uptake(polishing) reactor and final clarifier. The efficiency of removal could be reached 91% for organics, 76% for nitrogen, 90% for phosphorus in Eujungbu pilot plant. We operated the plant which irrigated $10m^3$ per day for sewage. During our operation the HRT(Hydraulic Retention time) was maintained for 10.5hr, but it could be reduced as 8.5hr according to our operation results.
Choi Hyung Il;Cheong Kyung Hoon;Park Sang Il;Paik Ke Jin
Journal of Environmental Health Sciences
/
v.31
no.2
s.83
/
pp.172-178
/
2005
A laboratory experiment was performed to investigate simultaneous removal of phosphorus and nitrogen from raw sewage by intermittently aerated activated sludge process packed with aluminum and silver plate. Two continuous experimental process, i.e. an intermittently aerated activated sludge process, and an intermittently aerated activated sludge process with an aluminum and silver plate packed into the reactor were compared. The pitting corrosion of aluminum does not affect the performance of the biological treatment. The amounts of Al eluted from aluminum plate 17 mg to 60.6 mg in this experimental conditions, and Al/P mole ratio were from 3.31 to 11.25. The total nitrogen removal efficiency in Run E were $60.6\%$ at the HRT of 12 hours. The effluent $PO_4-P$ concentration as low as $1.0\;mg/\iota$ could have been obtained during the continuous experiment in Run E at HRT of 12 hours.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.